| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$59,000.00 |
$55,000.00 |
$40,000.00 |
$70,200.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 300 | LF |
$1.95 |
$2.30 |
$1.75 |
$1.80 |
$3.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$9.00 |
$7.80 |
$10.00 |
$12.00 |
$11.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 7,500 | SY |
$1.90 |
$1.57 |
$1.51 |
$1.80 |
$2.15 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.56 | AC |
$600.00 |
$200.00 |
$535.00 |
$600.00 |
$600.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 608 | TON |
$34.00 |
$29.09 |
$30.00 |
$32.00 |
$30.25 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$262.50 |
$400.00 |
$350.00 |
$250.00 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 350 | LF |
$34.00 |
$26.00 |
$30.00 |
$55.00 |
$29.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 10 | EA |
$1,100.00 |
$975.00 |
$1,050.00 |
$900.00 |
$1,400.00 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 240 | CY |
$12.00 |
$8.75 |
$15.00 |
$25.00 |
$12.00 |
| 11 | 501(G) 6309 |
CLSM BACKFILL | 140 | CY |
$140.00 |
$150.00 |
$150.00 |
$180.00 |
$165.00 |
| 12 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$235.00 |
$225.50 |
$225.00 |
$210.00 |
$218.00 |
| 13 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 294.8 | LF |
$68.00 |
$74.00 |
$70.00 |
$75.00 |
$70.00 |
| 14 | 506(A) 1322 |
STRUCTURAL STEEL | 600 | LB |
$4.00 |
$3.00 |
$3.00 |
$3.00 |
$2.70 |
| 15 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$900.00 |
$850.00 |
$1,100.00 |
$900.00 |
$840.00 |
| 16 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$900.00 |
$850.00 |
$1,100.00 |
$900.00 |
$840.00 |
| 17 | 509(A) 1326 |
CLASS AA CONCRETE | 83.7 | CY |
$600.00 |
$603.33 |
$650.00 |
$480.00 |
$550.00 |
| 18 | 509(B) 1328 |
CLASS A CONCRETE | 107.4 | CY |
$600.00 |
$623.00 |
$650.00 |
$530.00 |
$550.00 |
| 19 | 511(A) 1332 |
REINFORCING STEEL | 36,120 | LB |
$1.00 |
$0.9400 |
$1.00 |
$1.00 |
$1.00 |
| 20 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 148 | LF |
$32.00 |
$30.10 |
$30.00 |
$30.00 |
$30.00 |
| 21 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 476 | LF |
$36.00 |
$34.30 |
$35.00 |
$40.00 |
$36.15 |
| 22 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 148 | LF |
$12.00 |
$12.90 |
$15.00 |
$30.00 |
$18.00 |
| 23 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 476 | LF |
$12.00 |
$14.70 |
$15.00 |
$30.00 |
$15.00 |
| 24 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,400 | TON |
$38.00 |
$39.21 |
$40.00 |
$38.00 |
$38.50 |
| 25 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 700 | TON |
$30.00 |
$31.54 |
$33.00 |
$30.00 |
$34.00 |
| 26 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$5,500.00 |
$5,000.00 |
$20,000.00 |
$7,500.00 |
| 27 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 68.75 | LF |
$20.00 |
$24.19 |
$24.00 |
$25.00 |
$32.00 |
| 28 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,100.00 |
$2,756.25 |
$2,695.00 |
$2,700.00 |
$3,800.00 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$4,850.00 |
$3,500.00 |
$3,700.00 |
| 30 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$7,105.00 |
$6,900.00 |
$6,500.00 |
$7,250.00 |
| 31 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,800.00 |
$2,500.00 |
$2,500.00 |
$3,000.00 |
| 32 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$31,000.00 |
$25,000.00 |
$50,000.00 |
$35,000.00 |