Bid tab 130168

Let Apr 18, 2013 · Division 3 · Seminole Sign up free

‹ Apr 2013 results

GRADE, DRAIN, AND SURFACE INDUSTRIAL PARK ROAD : SEMINOLE INDUSTRIAL PARK 0.5 MILE NORTH AND 0.5 MILE EAST OF THE SH -9/SH-99 JCT. PROJECT LENGTH = 0.274 MILES

Let date
Thursday, April 18, 2013
Contract
130168
J/P numbers
23533(06)
District
Division 3
County
Seminole
Highway
Limits
GRADE, DRAIN, AND SURFACE INDUSTRIAL PARK ROAD : SEMINOLE INDUSTRIAL PARK 0.5 MILE NORTH AND 0.5 MILE EAST OF THE SH -9/SH-99 JCT. PROJECT LENGTH = 0.274 MILES
Project number
STPY-267E(015)SG

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$479,475
1 Silver Star Construction Company, Inc. Low bidder $442,840 -7.6%
2 HASKELL LEMON CONSTRUCTION CO. $464,546 -3.1% +4.9%
3 CP3 ENTERPRISES, INC. $513,505 +7.1% +16.0%
4 T. McDonald Construction, Inc. $544,075 +13.5% +22.9%
5 Redlands Contracting, LLC $555,903 +15.9% +25.5%
6 TOM HUDSON PAVING, INC. $578,505 +20.7% +30.6%
7 GLOVER & ASSOCIATES, INC. $584,557 +21.9% +32.0%

Bid tab: unit prices 45 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Silver Star Con…#2 HASKELL LEMON C…#3 CP3 ENTERPRISES…#4 T. McDonald Con…#5 Redlands Contra…#6 TOM HUDSON PAVI…#7 GLOVER & ASSOCI…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $7,500.00 $17,395.00 $15,000.00 $2,436.00 $3,000.00 $10,000.00 $12,584.08 $10,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,900CY $5.00 $5.00 $9.00 $4.87 $6.50 $6.25 $10.37 $11.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $11,500.00 $15,000.00 $7,003.50 $4,000.00 $4,500.00 $12,736.18 $12,000.00
4221(C) 2801 TEMPORARY SILT FENCE1,690LF $3.00 $1.70 $2.00 $1.50 $2.20 $2.20 $3.22 $1.50
5221(D) 2803 TEMPORARY SEDIMENT FILTER4EA $200.00 $186.00 $200.00 $298.11 $250.00 $550.00 $591.66 $600.00
6221(F) 0100 TEMPORARY SILT DIKE21LF $10.00 $9.50 $10.00 $7.16 $9.95 $9.90 $27.73 $30.00
7230(A) 2806 SOLID SLAB SODDING1,875SY $1.50 $3.25 $5.00 $3.05 $3.00 $2.75 $2.69 $2.57
8230(B) 2807 MULCH SODDING460SY $2.50 $3.25 $5.00 $3.05 $3.00 $6.00 $2.69 $2.56
9233(A) 2817 VEGETATIVE MULCHING1AC $1,000.00 $742.00 $2,000.00 $817.08 $3,500.00 $800.00 $3,188.35 $3,400.00
10307(B) 4210 CEMENT KILN DUST216.4TON $50.00 $48.00 $55.00 $9.72 $49.00 $55.00 $74.70 $65.00
11307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE6,005SY $2.50 $1.90 $2.60 $3.97 $3.35 $3.15 $3.65 $6.75
12408 5774 PRIME COAT2,102GAL $4.50 $3.50 $6.00 $6.14 $4.25 $4.00 $6.48 $4.00
13414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )5,682SY $16.00 $14.00 $12.00 $22.47 $24.00 $18.50 $18.26 $15.50
14414(G) 5275 P.C. CONCRETE FOR PAVEMENT1,421.7CY $98.00 $105.00 $110.00 $124.97 $130.00 $108.00 $126.87 $115.00
15509(D) 0325 CLASS C CONCRETE15CY $275.00 $400.00 $500.00 $306.94 $260.00 $350.00 $474.17 $450.00
16601(B) 0536 TYPE I-A PLAIN RIPRAP15TON $40.00 $129.12 $85.00 $45.84 $55.00 $50.00 $105.53 $121.00
17609(A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL)2,894.1LF $14.00 $1.50 $3.25 $8.69 $7.00 $19.23 $4.87 $10.50
18611(G) 5112 INLET CI DES. 2 (STD)2EA $3,500.00 $4,000.00 $2,700.00 $4,414.44 $3,000.00 $2,200.00 $3,147.34 $1,890.00
19611(G) 6002 INLET (SMD-TYPE 2)1EA $3,000.00 $3,210.00 $2,800.00 $2,358.54 $2,000.00 $1,500.00 $2,895.77 $5,500.00
20613(A) 0492 24" R.C.PIPE CLASS III60LF $60.00 $68.00 $75.00 $49.54 $58.00 $60.00 $75.82 $85.00
21613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND100LF $15.00 $10.00 $5.00 $6.28 $10.00 $10.00 $10.65 $6.20
22613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.100LF $10.00 $10.00 $5.00 $6.28 $10.00 $10.00 $14.79 $5.65
23613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND1EA $1,000.00 $1,175.00 $1,000.00 $1,472.90 $450.00 $2,000.00 $1,294.99 $1,300.00
24613(R) 1185 STANDARD BEDDING MATERIAL, CLASS A23.3CY $35.00 $45.00 $30.00 $30.33 $32.00 $70.00 $104.52 $150.00
25613(U) 1100 PIPE UNDERDRAIN COVER MAT'L.20CY $35.00 $60.00 $50.00 $30.33 $35.00 $70.00 $88.09 $125.00
26613(V) 1180 TRENCH EXCAVATION76CY $15.00 $11.00 $1.00 $12.18 $6.00 $10.00 $6.82 $47.00
27625(B) 1252 REMOVE AND RECONSTRUCT FENCE1,340LF $8.00 $3.50 $8.00 $4.87 $10.00 $9.20 $5.78 $25.00
28880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $1,060.00 $1,000.00 $2,375.10 $2,500.00 $2,500.00 $2,431.79 $1,700.00
29202(A) 0183 UNCLASSIFIED EXCAVATION100CY $5.00 $4.50 $9.00 $4.87 $6.00 $10.00 $10.31 $12.00
30307(B) 4210 CEMENT KILN DUST17.2TON $50.00 $48.00 $55.00 $51.98 $47.00 $88.00 $78.41 $65.00
31307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE480SY $2.50 $2.60 $2.60 $3.97 $3.25 $9.75 $3.65 $6.75
32408 5774 PRIME COAT168GAL $4.50 $3.50 $6.00 $6.25 $4.15 $4.00 $6.48 $4.00
33414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )452SY $16.00 $14.00 $12.00 $21.10 $28.50 $20.23 $15.15 $15.50
34414(G) 5275 P.C. CONCRETE FOR PAVEMENT113CY $98.00 $105.00 $110.00 $141.40 $130.00 $108.00 $126.86 $113.00
35609(A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL)230LF $14.00 $1.50 $3.25 $8.77 $11.00 $22.50 $4.48 $10.00
36202(A) 0183 UNCLASSIFIED EXCAVATION200CY $5.00 $4.50 $9.00 $4.87 $6.00 $10.00 $10.37 $12.00
37307(B) 4210 CEMENT KILN DUST17.2TON $50.00 $48.00 $55.00 $48.36 $47.00 $88.00 $74.73 $65.00
38307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE480SY $2.50 $2.60 $2.60 $3.97 $3.25 $9.75 $3.65 $6.75
39408 5774 PRIME COAT168GAL $4.50 $3.50 $6.00 $6.03 $4.15 $4.00 $6.48 $4.00
40414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )452SY $16.00 $14.00 $12.00 $21.10 $28.50 $20.23 $15.15 $15.50
41414(G) 5275 P.C. CONCRETE FOR PAVEMENT113CY $98.00 $105.00 $110.00 $142.73 $130.00 $108.00 $126.86 $115.00
42609(A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL)230LF $14.00 $1.50 $3.25 $9.74 $11.00 $22.50 $4.48 $10.00
43642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $11,130.00 $6,000.00 $4,872.00 $4,000.00 $8,500.00 $7,025.18 $20,000.00
44220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,760.00 $1,000.00 $1,218.00 $3,100.00 $3,500.00 $4,300.22 $1,500.00
45641 1552 MOBILIZATION1LSUM $35,000.00 $32,100.90 $26,000.00 $4,872.00 $10,000.00 $35,000.00 $46,989.51 $21,000.00