| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$17,395.00 |
$15,000.00 |
$2,436.00 |
$3,000.00 |
$10,000.00 |
$12,584.08 |
$10,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,900 | CY |
$5.00 |
$5.00 |
$9.00 |
$4.87 |
$6.50 |
$6.25 |
$10.37 |
$11.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$11,500.00 |
$15,000.00 |
$7,003.50 |
$4,000.00 |
$4,500.00 |
$12,736.18 |
$12,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,690 | LF |
$3.00 |
$1.70 |
$2.00 |
$1.50 |
$2.20 |
$2.20 |
$3.22 |
$1.50 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 4 | EA |
$200.00 |
$186.00 |
$200.00 |
$298.11 |
$250.00 |
$550.00 |
$591.66 |
$600.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 21 | LF |
$10.00 |
$9.50 |
$10.00 |
$7.16 |
$9.95 |
$9.90 |
$27.73 |
$30.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,875 | SY |
$1.50 |
$3.25 |
$5.00 |
$3.05 |
$3.00 |
$2.75 |
$2.69 |
$2.57 |
| 8 | 230(B) 2807 |
MULCH SODDING | 460 | SY |
$2.50 |
$3.25 |
$5.00 |
$3.05 |
$3.00 |
$6.00 |
$2.69 |
$2.56 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$1,000.00 |
$742.00 |
$2,000.00 |
$817.08 |
$3,500.00 |
$800.00 |
$3,188.35 |
$3,400.00 |
| 10 | 307(B) 4210 |
CEMENT KILN DUST | 216.4 | TON |
$50.00 |
$48.00 |
$55.00 |
$9.72 |
$49.00 |
$55.00 |
$74.70 |
$65.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 6,005 | SY |
$2.50 |
$1.90 |
$2.60 |
$3.97 |
$3.35 |
$3.15 |
$3.65 |
$6.75 |
| 12 | 408 5774 |
PRIME COAT | 2,102 | GAL |
$4.50 |
$3.50 |
$6.00 |
$6.14 |
$4.25 |
$4.00 |
$6.48 |
$4.00 |
| 13 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 5,682 | SY |
$16.00 |
$14.00 |
$12.00 |
$22.47 |
$24.00 |
$18.50 |
$18.26 |
$15.50 |
| 14 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,421.7 | CY |
$98.00 |
$105.00 |
$110.00 |
$124.97 |
$130.00 |
$108.00 |
$126.87 |
$115.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 15 | CY |
$275.00 |
$400.00 |
$500.00 |
$306.94 |
$260.00 |
$350.00 |
$474.17 |
$450.00 |
| 16 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 15 | TON |
$40.00 |
$129.12 |
$85.00 |
$45.84 |
$55.00 |
$50.00 |
$105.53 |
$121.00 |
| 17 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 2,894.1 | LF |
$14.00 |
$1.50 |
$3.25 |
$8.69 |
$7.00 |
$19.23 |
$4.87 |
$10.50 |
| 18 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 2 | EA |
$3,500.00 |
$4,000.00 |
$2,700.00 |
$4,414.44 |
$3,000.00 |
$2,200.00 |
$3,147.34 |
$1,890.00 |
| 19 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$3,000.00 |
$3,210.00 |
$2,800.00 |
$2,358.54 |
$2,000.00 |
$1,500.00 |
$2,895.77 |
$5,500.00 |
| 20 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 60 | LF |
$60.00 |
$68.00 |
$75.00 |
$49.54 |
$58.00 |
$60.00 |
$75.82 |
$85.00 |
| 21 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$15.00 |
$10.00 |
$5.00 |
$6.28 |
$10.00 |
$10.00 |
$10.65 |
$6.20 |
| 22 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$10.00 |
$10.00 |
$5.00 |
$6.28 |
$10.00 |
$10.00 |
$14.79 |
$5.65 |
| 23 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,000.00 |
$1,175.00 |
$1,000.00 |
$1,472.90 |
$450.00 |
$2,000.00 |
$1,294.99 |
$1,300.00 |
| 24 | 613(R) 1185 |
STANDARD BEDDING MATERIAL, CLASS A | 23.3 | CY |
$35.00 |
$45.00 |
$30.00 |
$30.33 |
$32.00 |
$70.00 |
$104.52 |
$150.00 |
| 25 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 20 | CY |
$35.00 |
$60.00 |
$50.00 |
$30.33 |
$35.00 |
$70.00 |
$88.09 |
$125.00 |
| 26 | 613(V) 1180 |
TRENCH EXCAVATION | 76 | CY |
$15.00 |
$11.00 |
$1.00 |
$12.18 |
$6.00 |
$10.00 |
$6.82 |
$47.00 |
| 27 | 625(B) 1252 |
REMOVE AND RECONSTRUCT FENCE | 1,340 | LF |
$8.00 |
$3.50 |
$8.00 |
$4.87 |
$10.00 |
$9.20 |
$5.78 |
$25.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,060.00 |
$1,000.00 |
$2,375.10 |
$2,500.00 |
$2,500.00 |
$2,431.79 |
$1,700.00 |
| 29 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 100 | CY |
$5.00 |
$4.50 |
$9.00 |
$4.87 |
$6.00 |
$10.00 |
$10.31 |
$12.00 |
| 30 | 307(B) 4210 |
CEMENT KILN DUST | 17.2 | TON |
$50.00 |
$48.00 |
$55.00 |
$51.98 |
$47.00 |
$88.00 |
$78.41 |
$65.00 |
| 31 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 480 | SY |
$2.50 |
$2.60 |
$2.60 |
$3.97 |
$3.25 |
$9.75 |
$3.65 |
$6.75 |
| 32 | 408 5774 |
PRIME COAT | 168 | GAL |
$4.50 |
$3.50 |
$6.00 |
$6.25 |
$4.15 |
$4.00 |
$6.48 |
$4.00 |
| 33 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 452 | SY |
$16.00 |
$14.00 |
$12.00 |
$21.10 |
$28.50 |
$20.23 |
$15.15 |
$15.50 |
| 34 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 113 | CY |
$98.00 |
$105.00 |
$110.00 |
$141.40 |
$130.00 |
$108.00 |
$126.86 |
$113.00 |
| 35 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 230 | LF |
$14.00 |
$1.50 |
$3.25 |
$8.77 |
$11.00 |
$22.50 |
$4.48 |
$10.00 |
| 36 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 200 | CY |
$5.00 |
$4.50 |
$9.00 |
$4.87 |
$6.00 |
$10.00 |
$10.37 |
$12.00 |
| 37 | 307(B) 4210 |
CEMENT KILN DUST | 17.2 | TON |
$50.00 |
$48.00 |
$55.00 |
$48.36 |
$47.00 |
$88.00 |
$74.73 |
$65.00 |
| 38 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 480 | SY |
$2.50 |
$2.60 |
$2.60 |
$3.97 |
$3.25 |
$9.75 |
$3.65 |
$6.75 |
| 39 | 408 5774 |
PRIME COAT | 168 | GAL |
$4.50 |
$3.50 |
$6.00 |
$6.03 |
$4.15 |
$4.00 |
$6.48 |
$4.00 |
| 40 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 452 | SY |
$16.00 |
$14.00 |
$12.00 |
$21.10 |
$28.50 |
$20.23 |
$15.15 |
$15.50 |
| 41 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 113 | CY |
$98.00 |
$105.00 |
$110.00 |
$142.73 |
$130.00 |
$108.00 |
$126.86 |
$115.00 |
| 42 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 230 | LF |
$14.00 |
$1.50 |
$3.25 |
$9.74 |
$11.00 |
$22.50 |
$4.48 |
$10.00 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$11,130.00 |
$6,000.00 |
$4,872.00 |
$4,000.00 |
$8,500.00 |
$7,025.18 |
$20,000.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,760.00 |
$1,000.00 |
$1,218.00 |
$3,100.00 |
$3,500.00 |
$4,300.22 |
$1,500.00 |
| 45 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$32,100.90 |
$26,000.00 |
$4,872.00 |
$10,000.00 |
$35,000.00 |
$46,989.51 |
$21,000.00 |