| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$42,500.00 |
$20,000.00 |
$29,226.53 |
| 2 | 221(F) 0100 |
TEMPORARY SILT DIKE | 400 | LF |
$7.50 |
$9.20 |
$12.00 |
$12.60 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 7,800 | SY |
$1.80 |
$2.14 |
$2.00 |
$2.01 |
| 4 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.62 | AC |
$450.00 |
$425.00 |
$1,000.00 |
$545.00 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 464 | CY |
$50.00 |
$57.00 |
$45.00 |
$59.65 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 13 | TON |
$28.00 |
$30.77 |
$50.00 |
$21.80 |
| 7 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 440 | TON |
$80.00 |
$111.63 |
$125.00 |
$97.66 |
| 8 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$400.00 |
$275.00 |
$300.00 |
$340.00 |
| 9 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 48 | LF |
$26.00 |
$28.09 |
$100.00 |
$80.67 |
| 10 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$1,250.00 |
$750.00 |
$1,735.00 |
| 11 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 250 | CY |
$12.00 |
$9.00 |
$30.00 |
$18.00 |
| 12 | 501(F) 6352 |
GRANULAR BACKFILL | 126 | CY |
$50.00 |
$62.50 |
$40.00 |
$50.00 |
| 13 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 378.67 | LF |
$190.00 |
$207.50 |
$200.00 |
$257.00 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 271.3 | LF |
$60.00 |
$73.50 |
$75.00 |
$81.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 702 | LB |
$2.50 |
$3.10 |
$5.00 |
$4.00 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$800.00 |
$1,325.00 |
$1,250.00 |
$1,511.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$800.00 |
$1,325.00 |
$1,250.00 |
$1,511.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 96.6 | CY |
$475.00 |
$557.50 |
$600.00 |
$540.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 91.6 | CY |
$500.00 |
$575.00 |
$600.00 |
$569.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 36,180 | LB |
$0.9000 |
$0.8900 |
$1.00 |
$0.8000 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 100 | LF |
$26.00 |
$32.20 |
$30.00 |
$40.00 |
| 22 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 280 | LF |
$32.00 |
$37.10 |
$40.00 |
$51.00 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 100 | LF |
$12.00 |
$13.80 |
$30.00 |
$22.00 |
| 24 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 280 | LF |
$12.00 |
$15.90 |
$30.00 |
$20.00 |
| 25 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,725 | TON |
$36.00 |
$39.52 |
$45.00 |
$42.00 |
| 26 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 575 | TON |
$28.00 |
$30.52 |
$35.00 |
$33.00 |
| 27 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 75 | LF |
$24.00 |
$28.00 |
$30.00 |
$7.00 |
| 28 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 28 | LF |
$26.00 |
$35.00 |
$30.00 |
$7.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$11,000.00 |
$25,000.00 |
$15,410.00 |
| 30 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,250.00 |
$2,392.00 |
$2,500.00 |
$2,050.00 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,583.00 |
$4,000.00 |
$2,200.00 |
| 32 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$7,475.00 |
$5,000.00 |
$6,900.00 |
| 33 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$4,250.00 |
$3,500.00 |
$2,000.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$15,000.00 |
$34,000.00 |
$25,000.00 |
$37,900.00 |