| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$5,500.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$60,000.00 |
$55,000.00 |
$66,281.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,600 | LF |
$2.50 |
$1.80 |
$1.48 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 600 | LF |
$8.00 |
$8.00 |
$6.75 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 16,400 | SY |
$2.00 |
$1.50 |
$2.09 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.5 | AC |
$450.00 |
$500.00 |
$350.00 |
| 7 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 860 | CY |
$32.00 |
$40.00 |
$55.00 |
| 8 | 408 5774 |
PRIME COAT | 1,135 | GAL |
$5.00 |
$6.00 |
$8.50 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$200.00 |
$250.00 |
| 10 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 170 | TON |
$35.00 |
$38.00 |
$44.61 |
| 11 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 44 | LF |
$170.00 |
$130.00 |
$155.00 |
| 12 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 46 | LF |
$30.00 |
$18.00 |
$21.75 |
| 13 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$510.00 |
$140.00 |
$290.00 |
| 14 | 613(O) 4383 |
SPECIAL END SECTION OF 48" RCP ROUND | 2 | EA |
$1,250.00 |
$1,400.00 |
$1,750.00 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$15.00 |
$9.00 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 70 | CY |
$50.00 |
$50.00 |
$59.44 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$195.00 |
$240.00 |
$220.00 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 244.6 | LF |
$60.00 |
$82.00 |
$71.50 |
| 19 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$2.00 |
$4.00 |
$3.05 |
| 20 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$550.00 |
$650.00 |
$500.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 93.8 | CY |
$400.00 |
$575.00 |
$540.00 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 41.8 | CY |
$450.00 |
$575.00 |
$587.50 |
| 23 | 511(A) 1332 |
REINFORCING STEEL | 23,730 | LB |
$1.00 |
$0.9500 |
$0.9300 |
| 24 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 966 | LF |
$30.00 |
$44.00 |
$29.75 |
| 25 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 966 | LF |
$10.00 |
$20.00 |
$12.75 |
| 26 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,365 | TON |
$40.00 |
$36.00 |
$38.02 |
| 27 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 400 | TON |
$30.00 |
$30.00 |
$29.03 |
| 28 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$20.00 |
$20.00 |
$28.00 |
| 29 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$20.00 |
$20.00 |
$30.00 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$5,000.00 |
| 31 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$20.00 |
$14.00 |
$13.85 |
| 32 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,200.00 |
$1,175.00 |
$1,160.00 |
| 33 | 623(F) 6030 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 3 | EA |
$600.00 |
$550.00 |
$950.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,700.00 |
$2,575.00 |
| 35 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$9,200.00 |
$5,000.00 |
$5,381.00 |
| 36 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$500.00 |
$3,250.00 |
| 37 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$47,200.00 |
$18,000.00 |
$23,283.33 |