| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$40,000.00 |
$44,000.00 |
$39,500.00 |
$20,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 840 | LF |
$2.25 |
$2.20 |
$1.90 |
$2.00 |
$2.00 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,050 | LF |
$6.00 |
$7.00 |
$3.00 |
$6.60 |
$6.60 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 4,450 | SY |
$1.75 |
$2.00 |
$1.66 |
$1.80 |
$1.80 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.75 | AC |
$500.00 |
$400.00 |
$600.00 |
$360.00 |
$360.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 658 | TON |
$35.00 |
$31.50 |
$35.30 |
$33.50 |
$32.00 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$300.00 |
$255.00 |
$294.00 |
$300.00 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 162 | LF |
$30.00 |
$30.00 |
$25.00 |
$24.00 |
$30.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,000.00 |
$1,000.00 |
$1,075.00 |
$1,630.00 |
$250.00 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 86 | CY |
$12.00 |
$10.00 |
$10.00 |
$17.00 |
$45.00 |
| 11 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 68 | CY |
$12.00 |
$10.00 |
$11.35 |
$17.00 |
$40.00 |
| 12 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 548.51 | LF |
$195.00 |
$185.00 |
$173.25 |
$217.00 |
$190.00 |
| 13 | 504(C) 6250 |
SEALED EXPANSION JOINT | 66.96 | LF |
$250.00 |
$250.00 |
$238.00 |
$240.00 |
$150.00 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 345.17 | LF |
$55.00 |
$65.00 |
$75.50 |
$84.00 |
$50.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 540 | LB |
$3.75 |
$4.00 |
$2.75 |
$3.10 |
$3.00 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$700.00 |
$620.00 |
$970.00 |
$925.00 |
$600.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$700.00 |
$620.00 |
$970.00 |
$925.00 |
$600.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 107.8 | CY |
$510.00 |
$550.00 |
$545.00 |
$647.00 |
$750.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 102.84 | CY |
$500.00 |
$550.00 |
$570.00 |
$703.00 |
$750.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 39,872 | LB |
$0.9000 |
$1.00 |
$0.9000 |
$0.8000 |
$1.15 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 620 | LF |
$28.00 |
$28.00 |
$26.60 |
$41.00 |
$32.00 |
| 22 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 620 | LF |
$15.00 |
$12.00 |
$11.40 |
$6.00 |
$12.00 |
| 23 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 150 | LF |
$475.00 |
$500.00 |
$474.00 |
$592.00 |
$650.00 |
| 24 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,283 | TON |
$43.00 |
$40.50 |
$46.15 |
$45.00 |
$50.00 |
| 25 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 641 | TON |
$38.00 |
$33.50 |
$38.06 |
$38.50 |
$45.00 |
| 26 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$12,000.00 |
$10,000.00 |
$8,350.00 |
$8,000.00 |
$20,000.00 |
| 27 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,000.00 |
$2,150.00 |
$2,532.00 |
$2,110.00 |
$2,110.00 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,200.00 |
$3,020.00 |
$2,100.00 |
$1,400.00 |
$1,400.00 |
| 29 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,500.00 |
$5,500.00 |
$5,750.00 |
$5,000.00 |
$8,200.00 |
| 30 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,500.00 |
$2,500.00 |
$4,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$25,000.00 |
$30,000.00 |
$31,300.00 |
$50,000.00 |