| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 200 | CY |
$10.00 |
$11.00 |
$11.00 |
$5.00 |
$30.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,200 | CY |
$12.00 |
$12.99 |
$14.00 |
$9.00 |
$30.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,000 | LF |
$1.50 |
$1.95 |
$2.30 |
$2.25 |
$2.30 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 4,000 | SY |
$3.50 |
$2.40 |
$2.00 |
$2.00 |
$2.00 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 152 | CY |
$45.00 |
$72.00 |
$37.00 |
$65.00 |
$100.00 |
| 6 | 407(A) 4659 |
FOG SEAL | 49.36 | GAL |
$6.00 |
$25.00 |
$15.00 |
$15.00 |
$16.00 |
| 7 | 407(B) 0250 |
TACK COAT | 185.13 | GAL |
$4.50 |
$4.00 |
$4.80 |
$5.00 |
$3.00 |
| 8 | 408 5774 |
PRIME COAT | 392 | GAL |
$6.00 |
$10.00 |
$4.80 |
$5.00 |
$9.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 660.37 | TON |
$80.00 |
$125.00 |
$175.00 |
$190.00 |
$115.00 |
| 10 | 412 5267 |
COLD MILLING PAVEMENT | 2,468.4 | SY |
$3.50 |
$11.00 |
$3.00 |
$9.00 |
$10.00 |
| 11 | 509(A) 0319 |
CLASS AA CONCRETE | 53.8 | CY |
$750.00 |
$495.00 |
$410.00 |
$500.00 |
$220.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 17.3 | CY |
$350.00 |
$525.00 |
$600.00 |
$900.00 |
$1,100.00 |
| 13 | 511(B) 4269 |
EPOXY COATED REINFORCING STEEL | 7,496 | LB |
$1.00 |
$1.05 |
$1.40 |
$1.25 |
$2.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 510 | LF |
$5.00 |
$3.50 |
$2.50 |
$3.00 |
$3.00 |
| 15 | 619(C) 0924 |
SAWING PAVEMENT | 910 | LF |
$3.50 |
$5.75 |
$4.50 |
$4.00 |
$9.00 |
| 16 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$200.00 |
$657.00 |
$500.00 |
$300.00 |
$400.00 |
| 17 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 945.5 | LF |
$20.00 |
$18.00 |
$14.00 |
$15.00 |
$15.00 |
| 18 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$1,000.00 |
$775.00 |
$600.00 |
$600.00 |
$600.00 |
| 19 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,500.00 |
$2,100.00 |
$2,100.00 |
$2,200.00 |
| 20 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 6 | EA |
$2,000.00 |
$1,500.00 |
$1,200.00 |
$1,200.00 |
$1,300.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 204.4 | SY |
$150.00 |
$205.00 |
$200.00 |
$250.00 |
$200.00 |
| 22 | 504(B) 1305 |
SAW-CUT GROOVING | 1,078.2 | SY |
$6.00 |
$4.00 |
$3.60 |
$4.00 |
$10.00 |
| 23 | 504(C) 6250 |
SEALED EXPANSION JOINT | 92 | LF |
$250.00 |
$305.00 |
$350.00 |
$350.00 |
$230.00 |
| 24 | 504(E) 1381 |
CONCRETE PARAPET | 652 | LF |
$75.00 |
$95.00 |
$85.00 |
$100.00 |
$155.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 1,280 | LB |
$1.80 |
$5.50 |
$5.00 |
$5.00 |
$5.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 241.8 | CY |
$600.00 |
$780.00 |
$770.00 |
$850.00 |
$650.00 |
| 27 | 510(C) 6137 |
SLOPE WALL (4") | 2,983.1 | SY |
$60.00 |
$65.50 |
$65.00 |
$90.00 |
$56.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 622 | LB |
$1.00 |
$1.05 |
$1.50 |
$1.00 |
$1.00 |
| 29 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 78,845 | LB |
$1.50 |
$1.09 |
$1.20 |
$1.30 |
$2.00 |
| 30 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$33,500.00 |
$30,000.00 |
$30,000.00 |
$27,000.00 |
| 31 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$15,000.00 |
$4,500.00 |
$3,000.00 |
$800.00 |
$3,000.00 |
| 32 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 340.2 | SY |
$4.50 |
$4.60 |
$4.00 |
$5.00 |
$5.00 |
| 33 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 65 | LF |
$5.00 |
$55.00 |
$50.00 |
$15.00 |
$60.00 |
| 34 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2.5 | GAL |
$80.00 |
$55.00 |
$50.00 |
$80.00 |
$50.00 |
| 35 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 11 | SY |
$600.00 |
$650.00 |
$565.00 |
$600.00 |
$600.00 |
| 36 | 523(A) 6550 |
SEALER CRACK PREPARATION | 186 | LF |
$5.00 |
$4.00 |
$3.00 |
$3.00 |
$5.00 |
| 37 | 523(B) 6560 |
SEALER RESIN | 1.9 | GAL |
$250.00 |
$200.00 |
$150.00 |
$45.00 |
$200.00 |
| 38 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 59.8 | SY |
$45.00 |
$25.00 |
$18.00 |
$40.00 |
$19.00 |
| 39 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 4 | EA |
$6,000.00 |
$1,100.00 |
$920.00 |
$800.00 |
$1,500.00 |
| 40 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 12 | EA |
$2,000.00 |
$1,800.00 |
$1,600.00 |
$800.00 |
$2,000.00 |
| 41 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$15,000.00 |
$140,000.00 |
$130,000.00 |
$52,000.00 |
$200,000.00 |
| 42 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 90 | SD |
$200.00 |
$150.00 |
$130.00 |
$125.00 |
$125.00 |
| 43 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,000 | LF |
$0.4000 |
$0.1000 |
$0.0800 |
$0.0800 |
$0.0800 |
| 44 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,144 | LF |
$0.3000 |
$0.1200 |
$0.1000 |
$0.1000 |
$0.1000 |
| 45 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 10,000 | LF |
$0.2000 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0500 |
| 46 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 360 | SD |
$5.00 |
$2.40 |
$2.00 |
$2.00 |
$2.00 |
| 47 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 180 | SD |
$15.00 |
$8.95 |
$8.00 |
$8.00 |
$8.00 |
| 48 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$25.00 |
$26.50 |
$20.00 |
$15.00 |
$42.00 |
| 49 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,000 | LF |
$3.50 |
$3.60 |
$3.00 |
$5.00 |
$10.00 |
| 50 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 180 | SD |
$10.00 |
$7.00 |
$5.00 |
$5.00 |
$5.00 |
| 51 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,120 | SD |
$1.00 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0500 |
| 52 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 720 | SD |
$1.50 |
$3.60 |
$3.00 |
$3.00 |
$3.00 |
| 53 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,960 | SD |
$2.00 |
$0.3000 |
$0.2500 |
$0.2500 |
$0.2500 |
| 54 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 14,520 | SD |
$0.5000 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0500 |
| 55 | 880(C) 8848 |
WING BARRICADES | 720 | SD |
$1.20 |
$0.1800 |
$0.1500 |
$0.1500 |
$0.1500 |
| 56 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,790 | SD |
$0.2000 |
$1.15 |
$0.8500 |
$0.8500 |
$0.8500 |
| 57 | 880(F) 8878 |
DRUMS | 12,240 | SD |
$0.3000 |
$0.4300 |
$0.3500 |
$0.3500 |
$0.3500 |
| 58 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$15,000.00 |
$7,500.00 |
$15,000.00 |
$2,500.00 |
$5,000.00 |
| 59 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$65,000.00 |
$105,000.00 |
$88,522.00 |
$94,000.00 |