| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$6,300.00 |
$25,000.00 |
$39,600.00 |
$15,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$8,000.00 |
$22,000.00 |
$30,000.00 |
$14,400.00 |
$40,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,200.00 |
$13,000.00 |
$7,200.00 |
$8,000.00 |
| 4 | 221(B) 2801 |
TEMPORARY BALE BARRIER | 140 | LF |
$5.00 |
$6.00 |
$5.00 |
$8.40 |
$19.05 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 854 | LF |
$2.00 |
$2.50 |
$2.00 |
$3.60 |
$4.40 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 1,473 | SY |
$2.00 |
$2.50 |
$2.00 |
$3.60 |
$2.58 |
| 7 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 1 | EA |
$2,000.00 |
$3,000.00 |
$350.00 |
$1,200.00 |
$3,000.00 |
| 8 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 525 | CY |
$45.00 |
$68.00 |
$65.00 |
$69.74 |
$55.00 |
| 9 | 310(B) 0149 |
SUBGRADE, METHOD B | 2,499 | SY |
$2.50 |
$5.75 |
$2.50 |
$4.20 |
$5.00 |
| 10 | 325 5271 |
SEPARATOR FABRIC | 2,499 | SY |
$2.00 |
$3.50 |
$1.40 |
$2.16 |
$10.00 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 47 | TON |
$30.00 |
$32.00 |
$32.00 |
$44.53 |
$45.00 |
| 12 | 408 5774 |
PRIME COAT | 306 | GAL |
$5.00 |
$7.70 |
$5.90 |
$8.40 |
$5.90 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 674 | TON |
$80.00 |
$102.00 |
$91.57 |
$110.88 |
$91.57 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 275 | TON |
$98.00 |
$126.00 |
$106.41 |
$137.40 |
$106.41 |
| 15 | 619(B) 4725 |
REMOVAL OF FENCE | 498 | LF |
$2.00 |
$3.50 |
$1.00 |
$2.40 |
$5.00 |
| 16 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 1,045 | SY |
$5.00 |
$17.25 |
$9.00 |
$6.90 |
$25.00 |
| 17 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 601 | LF |
$2.00 |
$3.00 |
$3.00 |
$2.40 |
$3.00 |
| 18 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 512.5 | LF |
$15.00 |
$16.68 |
$15.70 |
$18.00 |
$15.00 |
| 19 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$700.00 |
$795.00 |
$1,600.00 |
$600.00 |
$500.00 |
| 20 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,500.00 |
$2,300.00 |
$1,770.00 |
$2,502.00 |
$2,350.00 |
| 21 | 623(I) 8680 |
GUARDRAIL BRIDGE CONNECTION-TYPE B | 4 | EA |
$2,000.00 |
$892.00 |
$1,400.00 |
$1,560.00 |
$1,350.00 |
| 22 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 416 | LF |
$6.00 |
$6.00 |
$5.00 |
$7.32 |
$18.00 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 287 | CY |
$10.00 |
$7.00 |
$20.00 |
$24.06 |
$25.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 216 | CY |
$120.00 |
$135.00 |
$150.00 |
$162.83 |
$175.00 |
| 25 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 876 | LF |
$200.00 |
$215.00 |
$240.00 |
$242.91 |
$350.00 |
| 26 | 504(A) 1304 |
APPROACH SLAB | 379 | SY |
$170.00 |
$159.00 |
$250.00 |
$155.21 |
$250.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 1,248.6 | SY |
$5.00 |
$4.14 |
$3.60 |
$4.50 |
$4.00 |
| 28 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 610.3 | LF |
$70.00 |
$70.00 |
$75.00 |
$86.05 |
$80.00 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$5.00 |
$3.25 |
$2.00 |
$4.15 |
$5.00 |
| 30 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$2,300.00 |
$2,900.00 |
$3,250.00 |
$3,415.48 |
$2,900.00 |
| 31 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$2,400.00 |
$2,900.00 |
$3,800.00 |
$3,456.46 |
$2,900.00 |
| 32 | 509(A) 1326 |
CLASS AA CONCRETE | 263.9 | CY |
$545.00 |
$542.00 |
$570.00 |
$650.00 |
$550.00 |
| 33 | 509(B) 1328 |
CLASS A CONCRETE | 212.8 | CY |
$500.00 |
$510.00 |
$380.00 |
$600.00 |
$500.00 |
| 34 | 509(D) 1331 |
CLASS C CONCRETE | 25 | CY |
$350.00 |
$455.00 |
$500.00 |
$544.80 |
$850.00 |
| 35 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 113,750 | LB |
$1.10 |
$1.09 |
$1.25 |
$1.16 |
$1.20 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 204 | LF |
$35.00 |
$25.90 |
$36.00 |
$27.99 |
$45.00 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 846 | LF |
$40.00 |
$29.40 |
$44.00 |
$35.43 |
$51.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 204 | LF |
$28.00 |
$11.10 |
$33.00 |
$15.00 |
$10.00 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 846 | LF |
$30.00 |
$12.60 |
$27.00 |
$15.00 |
$10.00 |
| 40 | 514(F) 6354 |
PILE LOAD TEST (DYNAMIC) | 18 | EA |
$1,000.00 |
$600.00 |
$620.00 |
$650.00 |
$550.00 |
| 41 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,201 | SY |
$6.00 |
$4.03 |
$3.50 |
$4.38 |
$3.50 |
| 42 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 208.6 | LF |
$600.00 |
$550.00 |
$720.00 |
$750.00 |
$850.00 |
| 43 | 523(A) 6550 |
SEALER CRACK PREPARATION | 47.8 | LF |
$4.00 |
$4.60 |
$4.00 |
$5.00 |
$4.00 |
| 44 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$300.00 |
$172.50 |
$150.00 |
$187.50 |
$150.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,127 | TON |
$40.00 |
$31.90 |
$40.00 |
$36.63 |
$50.00 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 218 | TON |
$35.00 |
$27.27 |
$38.00 |
$31.38 |
$50.00 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 96 | LF |
$30.00 |
$25.00 |
$44.00 |
$40.08 |
$50.00 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 64 | LF |
$30.00 |
$33.59 |
$32.00 |
$27.79 |
$50.00 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$40,000.00 |
$35,000.00 |
$116,686.23 |
$125,000.00 |
| 50 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1 | CY |
$450.00 |
$1,100.00 |
$250.00 |
$300.00 |
$250.00 |
| 51 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$25.00 |
$30.00 |
$50.00 |
$60.00 |
$50.00 |
| 52 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$150.00 |
$265.00 |
$250.00 |
$300.00 |
$250.00 |
| 53 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,940 | LF |
$2.00 |
$1.00 |
$0.7800 |
$0.9400 |
$1.50 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$50,000.00 |
$9,600.00 |
$8,150.00 |
$9,780.00 |
$17,500.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$5,000.00 |
$4,000.00 |
$12,000.00 |
$3,850.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$4,500.00 |
$1,000.00 |
$2,580.00 |
$9,000.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$114,208.00 |
$61,000.00 |
$73,518.16 |
$94,888.33 |
$110,000.00 |