Bid tab 110411

Let Oct 20, 2011 · Division 6 · Alfalfa Sign up free

‹ Oct 2011 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-030): OVER EAGLE CHIEF CREEK 1.0 MI NORTH OF SH-45 AND 5.7 MI WEST OF SH -8, WEST OF CARMEN . PROJECT LENGTH = 0.274 MILES

Let date
Thursday, October 20, 2011
Contract
110411
J/P numbers
25910(04)
District
Division 6
County
Alfalfa
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-030): OVER EAGLE CHIEF CREEK 1.0 MI NORTH OF SH-45 AND 5.7 MI WEST OF SH -8, WEST OF CARMEN . PROJECT LENGTH = 0.274 MILES
Project number
BRO-102D(136)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$950,290
1 SEWELL BROS., INC. Low bidder $875,762 -7.8%
2 BELK BRIDGE, INC. $889,948 -6.3% +1.6%
3 BRIDGECO CONTRACTORS, INC. $933,984 -1.7% +6.6%
4 K & R BUILDERS, INC. $955,337 +0.5% +9.1%
5 B & B BRIDGE COMPANY, LLC $1,046,113 +10.1% +19.5%
6 L & M Contractors, Inc. $1,165,802 +22.7% +33.1%

Bid tab: unit prices 33 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 BELK BRIDGE, IN…#3 BRIDGECO CONTRA…#4 K & R BUILDERS,…#5 B & B BRIDGE CO…#6 L & M Contracto…
1202(H) 0185 EARTHWORK1LSUM $50,000.00 $30,000.00 $39,000.00 $41,500.00 $46,000.00 $46,000.00 $49,000.00
2221(C) 2801 TEMPORARY SILT FENCE200LF $3.00 $2.00 $2.00 $2.00 $2.25 $2.00 $2.00
3221(F) 0100 TEMPORARY SILT DIKE1,100LF $8.00 $5.50 $6.00 $6.00 $4.50 $6.00 $6.00
4230(A) 2806 SOLID SLAB SODDING14,446SY $2.25 $1.60 $1.39 $1.80 $1.66 $1.45 $1.45
5233(A) 2817 VEGETATIVE MULCHING2.98AC $550.00 $500.00 $500.00 $700.00 $400.00 $600.00 $600.00
6402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E629TON $35.00 $35.55 $36.34 $39.65 $41.28 $45.00 $40.00
7509(D) 0325 CLASS C CONCRETE10CY $275.00 $300.00 $100.00 $250.00 $257.50 $300.00 $200.00
8613(B) 0692 36" CORR. GALV. STEEL PIPE166LF $45.00 $38.00 $35.00 $33.25 $31.00 $35.00 $35.00
9613(B) 0693 42" CORR. GALV. STEEL PIPE148LF $55.00 $46.00 $40.00 $40.00 $81.50 $40.00 $40.00
10613(M) 7189 TYPE D4 CULVERT END TREATMENT4EA $1,200.00 $950.00 $1,000.00 $1,000.00 $1,500.00 $1,200.00 $2,100.00
11613(M) 7194 TYPE DD4 CULVERT END TREATMENT2EA $1,600.00 $1,100.00 $1,750.00 $1,600.00 $2,500.00 $1,600.00 $2,600.00
12501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON96CY $15.00 $7.00 $15.00 $10.00 $7.50 $35.50 $15.00
13501(D) 6353 UNCLASSIFIED BACKFILL114CY $13.00 $7.00 $15.00 $10.00 $10.00 $55.00 $25.00
14503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,128.5LF $195.00 $175.00 $200.00 $189.00 $186.00 $215.00 $213.00
15504(C) 6250 SEALED EXPANSION JOINT33.97LF $250.00 $235.00 $150.00 $210.00 $210.50 $405.00 $500.00
16504(D) 6239 CONCRETE RAIL (TR3)643.16LF $55.00 $55.00 $80.00 $61.00 $64.50 $52.50 $67.00
17506(A) 1322 STRUCTURAL STEEL530LB $2.75 $3.50 $4.00 $2.00 $3.11 $5.00 $3.50
18507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY12EA $750.00 $800.00 $500.00 $745.50 $1,150.00 $1,400.00 $950.00
19507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $750.00 $800.00 $500.00 $745.50 $1,150.00 $1,400.00 $950.00
20509(A) 1326 CLASS AA CONCRETE215.8CY $475.00 $450.00 $350.00 $430.00 $492.00 $500.00 $635.00
21509(B) 1328 CLASS A CONCRETE95.8CY $450.00 $450.00 $350.00 $425.00 $502.00 $500.00 $635.00
22511(A) 1332 REINFORCING STEEL61,459LB $0.9000 $0.9000 $1.00 $0.9600 $0.8900 $0.9500 $0.9100
23514(A) 6010 PILES, FURNISHED (HP 10X42)979LF $25.00 $24.00 $16.00 $26.10 $25.90 $27.50 $49.00
24514(B) 6292 PILES, DRIVEN (HP 10X42)979LF $12.00 $11.00 $8.00 $10.00 $11.10 $15.00 $6.00
25516(A) 6093 DRILLED SHAFTS 42" DIAMETER218LF $475.00 $400.00 $550.00 $511.00 $472.00 $550.00 $665.00
26601(B) 1353 TYPE I-A PLAIN RIPRAP2,386TON $38.00 $44.00 $39.53 $42.75 $43.61 $45.00 $46.00
27601(C) 1355 TYPE I-A FILTER BLANKET720TON $35.00 $39.00 $36.65 $38.00 $39.76 $42.50 $41.00
28619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $10,000.00 $7,500.00 $6,000.00 $7,500.00 $5,660.00 $10,000.00 $10,000.00
29623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)4EA $2,200.00 $2,200.00 $2,000.00 $2,100.00 $2,428.50 $2,000.00 $2,200.00
30880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,000.00 $2,000.00 $3,150.00 $2,800.00 $1,900.00 $1,800.00 $2,000.00
31642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,200.00 $7,500.00 $4,500.00 $6,800.00 $7,485.00 $6,800.00 $7,500.00
32220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $3,500.00 $1,000.00 $1,500.00 $2,500.00 $3,100.00 $3,500.00 $3,000.00
33641 1399 MOBILIZATION1LSUM $35,000.00 $30,000.00 $22,000.00 $34,000.00 $23,750.00 $39,500.00 $82,000.00