| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$35,000.00 |
$22,250.00 |
$20,470.00 |
$20,000.00 |
$31,000.00 |
$13,000.00 |
$35,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 200 | LF |
$3.00 |
$1.65 |
$3.00 |
$2.50 |
$2.50 |
$1.90 |
$1.55 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 550 | LF |
$8.00 |
$4.10 |
$5.00 |
$5.95 |
$5.95 |
$8.40 |
$7.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 6,805 | SY |
$2.25 |
$1.75 |
$2.40 |
$1.85 |
$1.85 |
$1.90 |
$1.55 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.41 | AC |
$600.00 |
$150.00 |
$700.00 |
$495.00 |
$495.00 |
$360.00 |
$300.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 465 | TON |
$32.00 |
$32.00 |
$36.50 |
$30.00 |
$29.00 |
$42.00 |
$15.00 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$212.50 |
$250.00 |
$200.00 |
$200.00 |
$350.00 |
$350.00 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 70 | LF |
$45.00 |
$20.50 |
$24.00 |
$23.00 |
$26.00 |
$54.00 |
$45.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,000.00 |
$900.00 |
$400.00 |
$1,000.00 |
$1,900.00 |
$1,350.00 |
$2,200.00 |
| 10 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10.36 | SF |
$15.00 |
$25.00 |
$39.00 |
$24.00 |
$25.00 |
$29.00 |
$24.00 |
| 11 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 24 | LF |
$18.00 |
$15.00 |
$25.00 |
$15.50 |
$20.00 |
$19.00 |
$15.50 |
| 12 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 80 | CY |
$10.00 |
$7.50 |
$10.00 |
$25.00 |
$15.00 |
$11.00 |
$60.00 |
| 13 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 50 | CY |
$15.00 |
$10.00 |
$12.00 |
$44.00 |
$25.00 |
$27.00 |
$50.00 |
| 14 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 430.01 | LF |
$165.00 |
$165.00 |
$160.00 |
$175.00 |
$190.00 |
$255.00 |
$200.00 |
| 15 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 277 | LF |
$60.00 |
$60.50 |
$60.00 |
$54.00 |
$60.00 |
$75.00 |
$85.00 |
| 16 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$3.00 |
$2.00 |
$3.13 |
$3.80 |
$3.00 |
$2.00 |
$3.50 |
| 17 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$700.00 |
$685.00 |
$555.00 |
$785.00 |
$480.00 |
$780.00 |
$650.00 |
| 18 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 4 | EA |
$700.00 |
$685.00 |
$556.00 |
$785.00 |
$580.00 |
$780.00 |
$650.00 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 83.4 | CY |
$435.00 |
$450.00 |
$400.00 |
$505.00 |
$590.00 |
$475.00 |
$925.00 |
| 20 | 509(B) 1328 |
CLASS A CONCRETE | 81.88 | CY |
$425.00 |
$472.50 |
$400.00 |
$505.00 |
$590.00 |
$475.00 |
$925.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 31,207 | LB |
$0.8500 |
$0.8600 |
$1.00 |
$0.9000 |
$0.9000 |
$0.9000 |
$1.40 |
| 22 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 468 | LF |
$22.00 |
$25.90 |
$26.25 |
$27.75 |
$33.00 |
$34.00 |
$34.00 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 468 | LF |
$10.00 |
$11.10 |
$12.00 |
$12.50 |
$7.00 |
$16.00 |
$12.00 |
| 24 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 90 | LF |
$450.00 |
$511.00 |
$637.42 |
$500.00 |
$670.00 |
$555.00 |
$500.00 |
| 25 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,143 | TON |
$36.00 |
$33.66 |
$39.00 |
$34.00 |
$35.50 |
$46.00 |
$35.05 |
| 26 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 343 | TON |
$34.00 |
$29.00 |
$33.68 |
$34.00 |
$34.00 |
$46.00 |
$31.35 |
| 27 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,500.00 |
$3,600.00 |
$6,000.00 |
$7,500.00 |
$3,000.00 |
$13,500.00 |
$10,000.00 |
| 28 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 102 | LF |
$30.00 |
$25.00 |
$22.00 |
$15.50 |
$17.50 |
$19.00 |
$15.50 |
| 29 | 623(F) 6030 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$550.00 |
$1,500.00 |
$875.00 |
$775.00 |
$800.00 |
$930.00 |
$775.00 |
| 30 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 2 | EA |
$2,200.00 |
$1,950.00 |
$1,925.00 |
$1,825.00 |
$1,850.00 |
$2,200.00 |
$1,825.00 |
| 31 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,000.00 |
$2,800.00 |
$1,750.00 |
$2,000.00 |
$2,500.00 |
$1,750.00 |
| 32 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,200.00 |
$5,000.00 |
$5,600.00 |
$5,600.00 |
$5,200.00 |
$1,100.00 |
$5,750.00 |
| 33 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,475.00 |
$1,800.00 |
$2,500.00 |
$3,000.00 |
$1,050.00 |
$4,000.00 |
| 34 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$18,000.00 |
$16,500.00 |
$16,862.68 |
$22,500.00 |
$26,300.00 |
$34,500.00 |
$50,350.00 |