Bid tab 110339

Let Jul 21, 2011 · Division 3 · Okfuskee Sign up free

‹ Jul 2011 results

BRIDGE REHABILITATION I-40: OVER NS-375, 7.4 MILES EAST OF THE SEMINOLE COUNTY LINE.

Let date
Thursday, July 21, 2011
Contract
110339
J/P numbers
27568(04)
District
Division 3
County
Okfuskee
Highway
Limits
BRIDGE REHABILITATION I-40: OVER NS-375, 7.4 MILES EAST OF THE SEMINOLE COUNTY LINE.
Project number
SBR-154N(161)SB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$909,086
1 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES Low bidder $783,537 -13.8%
2 C-P INTEGRATED SERVICES, INC. $809,000 -11.0% +3.2%
3 PBX Corporation $810,057 -10.9% +3.4%
4 GIBSON & ASSOCIATES, INC. $843,031 -7.3% +7.6%
5 C-GAWF CONSTRUCTION, INC. $895,672 -1.5% +14.3%
6 SCR CONSTRUCTION CO., INC. $1,083,284 +19.2% +38.3%

Bid tab: unit prices 49 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 WILDCAT CONSTRU…#2 C-P INTEGRATED …#3 PBX Corporation#4 GIBSON & ASSOCI…#5 C-GAWF CONSTRUC…#6 SCR CONSTRUCTIO…
1407(B) 0250 TACK COAT1,050GAL $2.00 $2.50 $4.75 $3.00 $2.75 $2.75 $8.00
2411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)855TON $80.00 $97.00 $123.93 $100.00 $106.00 $100.00 $190.00
3412 5267 COLD MILLING PAVEMENT6,760SY $5.00 $2.55 $6.03 $3.00 $2.80 $2.60 $4.25
4413(A) 4861 RUMBLE STRIP-METHOD HMA-CON3,200LF $2.00 $0.3700 $0.4600 $0.4000 $1.70 $1.50 $2.00
5619(B) 4780 REMOVAL OF GUARDRAIL80LF $8.00 $1.00 $1.25 $1.00 $1.10 $5.00 $5.00
6619(C) 0924 SAWING PAVEMENT152LF $4.00 $2.30 $5.14 $3.00 $4.00 $10.00 $10.00
7623 0100 (PL)GUARDRAIL CURBING4EA $600.00 $500.00 $624.67 $500.00 $550.00 $500.00 $50.00
8623(I) 8675 GUARDRAIL BRIDGE CONNECTION-TYPE A4EA $1,750.00 $1,400.00 $1,749.07 $1,400.00 $1,540.00 $1,850.00 $1,600.00
9625(D) 1254 REMOVE AND RECONSTRUCT GUARDRAIL800LF $10.00 $7.50 $9.37 $8.00 $8.25 $10.00 $32.00
10202(A) 0183 UNCLASSIFIED EXCAVATION95CY $15.00 $17.00 $11.51 $15.00 $60.00 $25.00 $60.00
11501(G) 6309 CLSM BACKFILL95CY $130.00 $135.00 $149.92 $180.00 $215.00 $75.00 $160.00
12504(A) 1304 APPROACH SLAB195SY $200.00 $220.00 $240.50 $225.00 $240.00 $175.00 $240.00
13504(C) 6250 SEALED EXPANSION JOINT88LF $280.00 $63.00 $287.35 $75.00 $96.00 $250.00 $80.00
14504(E) 6190 42" F-SHAPED PARAPET304LF $80.00 $140.00 $118.77 $115.00 $170.00 $145.00 $180.00
15505(A) 6065 BRIDGE DECK CONCRETE OVERLAY461SY $150.00 $105.00 $59.97 $125.00 $106.00 $160.00 $140.00
16505(E) 1000 HYDRODEMOLITION461SY $180.00 $110.00 $86.26 $110.00 $80.00 $175.00 $125.00
17511(B) 6010 EPOXY COATED REINFORCING STEEL1,800LB $1.25 $1.30 $1.25 $0.9000 $2.00 $1.20 $5.00
18515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)149SY $5.00 $4.30 $38.15 $5.00 $5.50 $12.50 $6.00
19520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER100LF $55.00 $28.57 $126.40 $29.00 $31.50 $35.00 $80.00
20520(C) 6060 EPOXY RESIN, ABOVE WATER4GAL $100.00 $70.00 $87.45 $70.00 $80.00 $100.00 $100.00
21521(A) 6210 PNEUMATICALLY PLACED MORTAR40SY $550.00 $631.00 $788.33 $631.00 $631.00 $750.00 $750.00
22523(A) 6550 SEALER CRACK PREPARATION88LF $7.00 $4.00 $8.75 $5.00 $5.50 $10.00 $6.00
23523(B) 6560 SEALER RESIN1GAL $175.00 $99.00 $343.57 $50.00 $110.00 $500.00 $210.00
24535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)5SY $80.00 $39.00 $87.45 $30.00 $100.00 $500.00 $10.00
25619(B) 6252 REMOVAL OF EXISTING PARAPET218LF $100.00 $105.00 $24.99 $50.00 $80.00 $20.00 $110.00
26202(A) 0183 UNCLASSIFIED EXCAVATION95CY $15.00 $17.00 $11.51 $15.00 $60.00 $25.00 $60.00
27501(G) 6309 CLSM BACKFILL95CY $130.00 $135.00 $149.92 $180.00 $215.00 $75.00 $160.00
28504(A) 1304 APPROACH SLAB195SY $200.00 $220.00 $193.65 $225.00 $240.00 $175.00 $240.00
29504(C) 6250 SEALED EXPANSION JOINT88LF $280.00 $63.00 $287.35 $75.00 $96.00 $250.00 $80.00
30504(E) 6190 42" F-SHAPED PARAPET304LF $80.00 $140.00 $118.77 $115.00 $170.00 $145.00 $180.00
31505(A) 6065 BRIDGE DECK CONCRETE OVERLAY461SY $150.00 $105.00 $59.97 $125.00 $106.00 $160.00 $140.00
32505(E) 1000 HYDRODEMOLITION461SY $180.00 $130.00 $98.38 $110.00 $107.00 $175.00 $125.00
33511(B) 6010 EPOXY COATED REINFORCING STEEL1,800LB $1.25 $1.30 $1.25 $0.9000 $2.00 $1.20 $5.00
34515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)149SY $5.00 $4.30 $4.37 $5.00 $5.50 $12.50 $6.00
35520(A) 6058 PREPARATION OF CRACKS, ABOVE WATER100LF $55.00 $28.57 $126.40 $29.00 $31.50 $35.00 $80.00
36520(C) 6060 EPOXY RESIN, ABOVE WATER4GAL $100.00 $70.00 $87.45 $70.00 $80.00 $100.00 $100.00
37521(A) 6210 PNEUMATICALLY PLACED MORTAR40SY $550.00 $631.00 $788.33 $631.00 $631.00 $750.00 $750.00
38523(A) 6550 SEALER CRACK PREPARATION88LF $7.00 $4.00 $15.62 $5.00 $5.50 $30.00 $6.00
39523(B) 6560 SEALER RESIN1GAL $175.00 $99.00 $249.87 $50.00 $110.00 $500.00 $210.00
40535 6130 (SP)CORROSION INHIBITOR(SURFACE APPLIED)5SY $80.00 $39.00 $87.45 $30.00 $100.00 $500.00 $10.00
41619(B) 6252 REMOVAL OF EXISTING PARAPET218LF $100.00 $105.00 $14.99 $50.00 $80.00 $30.00 $110.00
42855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)7,108LF $0.3000 $0.7500 $0.9400 $0.7400 $0.8000 $1.00 $0.8500
43870(A) 8485 SAND FILLED IMPACT ATTENUATION MODULE240SD $1.00 $8.90 $11.12 $9.00 $10.00 $5.00 $10.00
44877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER2,474LF $29.00 $16.00 $19.99 $25.00 $17.60 $22.50 $16.00
45877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER2,474LF $7.00 $3.50 $4.37 $10.00 $3.90 $5.00 $16.00
46880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $30,000.00 $14,020.00 $23,731.11 $37,661.00 $28,400.00 $22,500.00 $20,000.00
47882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN240SD $45.00 $10.00 $12.49 $10.00 $11.00 $30.00 $30.00
48642(A) 0095 CONSTRUCTION STAKING LEVEL I1LSUM $2,000.00 $770.00 $2,662.69 $3,000.00 $3,500.00 $5,000.00 $4,000.00
49641 1399 MOBILIZATION1LSUM $30,000.00 $64,500.00 $48,199.38 $39,000.00 $60,300.00 $30,000.00 $75,000.00