| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,420 | CY |
$9.00 |
$7.00 |
$10.00 |
$7.50 |
$16.00 |
$15.00 |
$18.00 |
$20.00 |
| 2 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,000.00 |
$5,000.00 |
$2,250.00 |
$5,000.00 |
$5,200.00 |
$4,000.00 |
$14,000.00 |
$15,000.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,710 | LF |
$2.00 |
$1.85 |
$1.15 |
$2.40 |
$3.00 |
$2.00 |
$2.00 |
$4.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 1,776 | SY |
$2.00 |
$1.99 |
$2.25 |
$2.30 |
$3.00 |
$2.00 |
$2.15 |
$4.00 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 503 | CY |
$40.00 |
$48.00 |
$76.00 |
$51.00 |
$47.00 |
$65.00 |
$98.00 |
$55.00 |
| 6 | 407(B) 0250 |
TACK COAT | 307 | GAL |
$3.00 |
$3.75 |
$2.50 |
$2.75 |
$3.00 |
$3.00 |
$8.00 |
$10.00 |
| 7 | 408 5774 |
PRIME COAT | 281 | GAL |
$8.00 |
$6.00 |
$10.85 |
$11.00 |
$10.00 |
$10.00 |
$8.00 |
$10.00 |
| 8 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 310 | TON |
$85.00 |
$113.00 |
$97.50 |
$99.00 |
$89.00 |
$90.00 |
$172.00 |
$150.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 487 | TON |
$90.00 |
$115.00 |
$104.00 |
$105.00 |
$95.00 |
$100.00 |
$172.00 |
$150.00 |
| 10 | 412 5267 |
COLD MILLING PAVEMENT | 2,272 | SY |
$5.00 |
$12.00 |
$5.75 |
$5.75 |
$6.00 |
$5.00 |
$8.00 |
$50.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 5 | CY |
$300.00 |
$400.00 |
$400.00 |
$300.00 |
$910.00 |
$500.00 |
$2,900.00 |
$300.00 |
| 12 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$4,500.00 |
$10,000.00 |
$5,000.00 |
$4,000.00 |
$7,000.00 |
$40,000.00 |
| 13 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,516 | SY |
$5.00 |
$3.00 |
$12.00 |
$6.00 |
$7.00 |
$5.00 |
$8.00 |
$15.00 |
| 14 | 619(B) 4741 |
REMOVAL OF DRAINAGE INLETS | 4 | EA |
$250.00 |
$200.00 |
$300.00 |
$600.00 |
$500.00 |
$200.00 |
$800.00 |
$50.00 |
| 15 | 619(B) 4791 |
REMOVAL OF CURB | 60 | LF |
$10.00 |
$3.00 |
$9.00 |
$6.00 |
$8.00 |
$10.00 |
$30.00 |
$25.00 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 1,736 | LF |
$3.00 |
$3.75 |
$3.00 |
$5.00 |
$4.00 |
$3.40 |
$4.00 |
$12.00 |
| 17 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 838 | LF |
$18.00 |
$13.95 |
$16.00 |
$16.00 |
$14.00 |
$18.00 |
$15.00 |
$18.00 |
| 18 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$1,875.00 |
$2,250.00 |
$2,100.00 |
$1,900.00 |
$2,200.00 |
$2,000.00 |
$2,000.00 |
| 19 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$1,600.00 |
$1,375.00 |
$1,800.00 |
$1,500.00 |
$1,400.00 |
$1,400.00 |
$1,600.00 |
$1,500.00 |
| 20 | 501(G) 6309 |
CLSM BACKFILL | 48 | CY |
$150.00 |
$126.15 |
$198.00 |
$195.00 |
$123.00 |
$375.00 |
$225.00 |
$250.00 |
| 21 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$7,850.00 |
$10,000.00 |
$10,000.00 |
$25,000.00 |
$50,000.00 |
$9,000.00 |
$125,000.00 |
| 22 | 504(A) 1304 |
APPROACH SLAB | 137.8 | SY |
$175.00 |
$200.00 |
$200.00 |
$205.00 |
$159.00 |
$250.00 |
$205.00 |
$150.00 |
| 23 | 504(B) 1305 |
SAW-CUT GROOVING | 1,420.4 | SY |
$6.00 |
$3.60 |
$4.00 |
$5.00 |
$5.00 |
$4.00 |
$5.00 |
$5.00 |
| 24 | 504(C) 6250 |
SEALED EXPANSION JOINT | 64 | LF |
$250.00 |
$315.00 |
$245.00 |
$290.00 |
$325.00 |
$350.00 |
$200.00 |
$90.00 |
| 25 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 886.6 | LF |
$80.00 |
$58.00 |
$68.00 |
$65.00 |
$57.00 |
$115.00 |
$125.00 |
$80.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 6,000 | LB |
$3.50 |
$5.25 |
$5.75 |
$6.00 |
$9.00 |
$4.00 |
$5.00 |
$10.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 323.2 | CY |
$500.00 |
$600.00 |
$675.00 |
$975.00 |
$782.00 |
$850.00 |
$850.00 |
$600.00 |
| 28 | 509(B) 1328 |
CLASS A CONCRETE | 3.2 | CY |
$1,200.00 |
$1,200.00 |
$1,500.00 |
$1,100.00 |
$2,400.00 |
$2,000.00 |
$3,000.00 |
$550.00 |
| 29 | 511 6306 |
MECHANICAL SPLICES | 1,396 | EA |
$10.00 |
$18.00 |
$18.00 |
$20.00 |
$17.00 |
$25.00 |
$10.00 |
$12.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 450 | LB |
$0.9000 |
$2.25 |
$1.25 |
$0.8000 |
$1.60 |
$0.9000 |
$1.00 |
$2.50 |
| 31 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,700 | LB |
$1.00 |
$1.00 |
$0.9600 |
$0.9500 |
$1.20 |
$1.50 |
$1.00 |
$1.50 |
| 32 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$10,000.00 |
$7,058.00 |
$10,000.00 |
$8,000.00 |
$24,000.00 |
$50,000.00 |
$10,000.00 |
$55,000.00 |
| 33 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$500.00 |
$490.00 |
$550.00 |
$565.00 |
$1,600.00 |
$325.00 |
$800.70 |
$300.00 |
| 34 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 676 | SY |
$4.50 |
$3.50 |
$4.00 |
$4.00 |
$5.00 |
$4.00 |
$3.25 |
$5.00 |
| 35 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 65 | LF |
$30.00 |
$25.00 |
$30.00 |
$28.00 |
$9.00 |
$48.00 |
$100.00 |
$20.00 |
| 36 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 6 | GAL |
$200.00 |
$60.00 |
$66.00 |
$69.00 |
$94.00 |
$70.00 |
$80.00 |
$100.00 |
| 37 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 17 | SY |
$500.00 |
$420.00 |
$462.00 |
$484.00 |
$787.00 |
$665.00 |
$1,000.00 |
$850.00 |
| 38 | 523(A) 6550 |
SEALER CRACK PREPARATION | 527 | LF |
$7.00 |
$3.00 |
$3.30 |
$3.45 |
$4.00 |
$2.00 |
$5.00 |
$10.00 |
| 39 | 523(B) 6560 |
SEALER RESIN | 7 | GAL |
$200.00 |
$100.00 |
$115.00 |
$115.00 |
$75.00 |
$50.00 |
$155.00 |
$125.00 |
| 40 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 3 | EA |
$2,000.00 |
$1,300.00 |
$1,430.00 |
$1,500.00 |
$1,500.00 |
$2,000.00 |
$2,000.00 |
$350.00 |
| 41 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 18 | EA |
$3,000.00 |
$1,750.00 |
$1,925.00 |
$2,000.00 |
$2,700.00 |
$1,800.00 |
$2,500.00 |
$850.00 |
| 42 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 5 | EA |
$7,500.00 |
$6,340.00 |
$7,000.00 |
$7,300.00 |
$6,100.00 |
$4,000.00 |
$5,000.00 |
$1,250.00 |
| 43 | 540 4545 |
(PL)REPAIR BRIDGE ITEM (TYPE D) | 2 | EA |
$15,000.00 |
$15,900.00 |
$17,600.00 |
$18,000.00 |
$12,600.00 |
$15,000.00 |
$20,000.00 |
$3,000.00 |
| 44 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$125,000.00 |
$115,000.00 |
$58,000.00 |
$173,000.00 |
$117,000.00 |
$128,000.00 |
$55,000.00 |
| 45 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 100 | SD |
$150.00 |
$100.00 |
$220.00 |
$115.00 |
$100.00 |
$100.00 |
$110.00 |
$500.00 |
| 46 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,500 | LF |
$1.00 |
$0.6100 |
$0.3000 |
$0.7000 |
$0.6100 |
$0.6100 |
$0.6500 |
$1.00 |
| 47 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 220 | SD |
$10.00 |
$12.50 |
$5.50 |
$14.00 |
$13.00 |
$12.50 |
$13.50 |
$250.00 |
| 48 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,419 | LF |
$15.00 |
$28.00 |
$23.00 |
$29.00 |
$28.00 |
$20.00 |
$20.00 |
$40.00 |
| 49 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,419 | LF |
$3.00 |
$3.00 |
$4.00 |
$9.00 |
$3.00 |
$5.00 |
$20.00 |
$10.00 |
| 50 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$20,000.00 |
$16,000.00 |
$18,500.00 |
$18,500.00 |
$16,000.00 |
$30,000.00 |
$25,000.00 |
$42,000.00 |
| 51 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$7,500.00 |
$6,000.00 |
$6,000.00 |
$5,500.00 |
$6,000.00 |
$15,000.00 |
| 52 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$45,500.00 |
$35,000.00 |
$14,000.00 |
$60,000.00 |
$52,973.00 |
$94,000.00 |
$129,000.00 |