| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$7,000.00 |
$5,000.00 |
$10,300.00 |
$14,000.00 |
$2,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$28,500.00 |
$27,500.00 |
$67,589.00 |
$36,050.00 |
$39,000.00 |
$30,600.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$3,100.00 |
$2,400.00 |
$9,000.00 |
$3,090.00 |
$3,300.00 |
$2,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 100 | LF |
$3.00 |
$3.00 |
$4.40 |
$3.00 |
$4.12 |
$4.00 |
$4.20 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,200 | LF |
$3.50 |
$3.00 |
$5.50 |
$4.00 |
$5.15 |
$5.00 |
$5.25 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 3,200 | SY |
$3.50 |
$1.50 |
$2.20 |
$2.12 |
$2.06 |
$2.25 |
$2.10 |
| 7 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 97 | TON |
$30.00 |
$28.50 |
$25.00 |
$32.00 |
$26.07 |
$29.00 |
$24.00 |
| 8 | 407(B) 0250 |
TACK COAT | 130 | GAL |
$1.50 |
$2.35 |
$3.30 |
$2.00 |
$2.32 |
$2.50 |
$2.40 |
| 9 | 408 5774 |
PRIME COAT | 504 | GAL |
$1.50 |
$5.00 |
$6.00 |
$3.00 |
$7.73 |
$7.50 |
$7.90 |
| 10 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 576 | TON |
$75.00 |
$78.00 |
$72.00 |
$75.00 |
$73.13 |
$81.00 |
$74.60 |
| 11 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 290 | TON |
$75.00 |
$82.00 |
$78.00 |
$85.00 |
$76.22 |
$84.00 |
$77.70 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 107.2 | CY |
$350.00 |
$275.00 |
$209.00 |
$242.00 |
$291.22 |
$285.00 |
$285.00 |
| 13 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$20.00 |
$16.00 |
$15.00 |
$14.00 |
$10.30 |
$15.00 |
$14.70 |
| 14 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 29 | LF |
$10.00 |
$10.00 |
$9.00 |
$7.00 |
$29.87 |
$8.00 |
$7.35 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$25.00 |
$7.00 |
$7.00 |
$11.00 |
$21.60 |
$10.00 |
$20.00 |
| 16 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$25.00 |
$46.00 |
$60.00 |
$36.00 |
$80.34 |
$55.00 |
$32.00 |
| 17 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$300.00 |
$194.50 |
$192.00 |
$239.00 |
$242.67 |
$225.00 |
$275.00 |
| 18 | 504(B) 1305 |
SAW-CUT GROOVING | 298 | SY |
$3.80 |
$9.00 |
$4.00 |
$6.75 |
$7.29 |
$8.00 |
$7.09 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 266.4 | LF |
$50.00 |
$58.00 |
$50.00 |
$76.00 |
$58.49 |
$66.00 |
$150.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 290 | LB |
$3.00 |
$3.00 |
$3.00 |
$4.00 |
$6.80 |
$2.50 |
$5.00 |
| 21 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$2,000.00 |
$3,500.00 |
$3,200.00 |
$3,619.00 |
$3,748.20 |
$3,650.00 |
$3,000.00 |
| 22 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$2,000.00 |
$3,500.00 |
$3,300.00 |
$3,619.00 |
$3,748.20 |
$3,700.00 |
$3,000.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 80.1 | CY |
$450.00 |
$450.00 |
$500.00 |
$485.00 |
$489.32 |
$580.00 |
$440.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 70.4 | CY |
$425.00 |
$475.00 |
$500.00 |
$402.00 |
$483.46 |
$500.00 |
$420.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 29,786 | LB |
$1.00 |
$0.8300 |
$0.9000 |
$0.8000 |
$1.05 |
$0.9000 |
$1.00 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 262 | LF |
$30.00 |
$25.00 |
$23.00 |
$32.00 |
$38.40 |
$31.60 |
$32.00 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 862 | LF |
$30.00 |
$31.00 |
$28.00 |
$42.00 |
$45.75 |
$37.90 |
$35.00 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 262 | LF |
$30.00 |
$7.00 |
$11.00 |
$7.00 |
$10.80 |
$14.20 |
$22.00 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 862 | LF |
$30.00 |
$7.00 |
$12.00 |
$7.00 |
$11.00 |
$17.05 |
$25.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 950 | TON |
$35.00 |
$35.50 |
$35.00 |
$47.00 |
$42.96 |
$46.00 |
$41.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 280 | TON |
$35.00 |
$28.50 |
$28.00 |
$36.00 |
$32.25 |
$38.00 |
$35.00 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$10.00 |
$32.00 |
$24.00 |
$6.00 |
$24.84 |
$20.00 |
$30.00 |
| 33 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$10.00 |
$25.00 |
$24.00 |
$6.00 |
$12.96 |
$20.00 |
$30.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$3,200.00 |
$4,000.00 |
$7,000.00 |
$3,780.00 |
$8,800.00 |
$15,000.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 28.12 | LF |
$30.00 |
$30.00 |
$38.00 |
$20.25 |
$21.87 |
$23.00 |
$21.00 |
| 36 | 623(F) 4453 |
GUARDRAIL ANCHOR UNIT (TYPE GE) | 1 | EA |
$1,500.00 |
$600.00 |
$600.00 |
$1,735.00 |
$513.00 |
$550.00 |
$499.00 |
| 37 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,500.00 |
$2,000.00 |
$2,300.00 |
$475.00 |
$1,873.80 |
$2,000.00 |
$1,821.75 |
| 38 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,250.00 |
$2,150.00 |
$1,950.00 |
$2,106.00 |
$2,300.00 |
$2,048.00 |
| 39 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$5,000.00 |
$3,300.00 |
$3,200.00 |
$2,950.00 |
$4,620.00 |
$6,700.00 |
$3,098.00 |
| 40 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$2,150.00 |
$1,000.00 |
$2,000.00 |
$2,550.00 |
$4,700.00 |
$1,000.00 |
| 41 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$20,000.00 |
$14,500.00 |
$15,000.00 |
$18,000.00 |
$27,164.56 |
$9,000.00 |
$31,000.00 |