| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$2,500.00 |
$3,155.97 |
$15,000.00 |
$5,000.00 |
$10,000.00 |
$12,000.00 |
$135,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$1,800.00 |
$44,859.25 |
$2,200.00 |
$2,500.00 |
$80,000.00 |
$5,500.00 |
$40,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$1,000.00 |
$602.87 |
$2,200.00 |
$2,100.00 |
$1,700.00 |
$7,200.00 |
$12,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$6.00 |
$2.99 |
$2.00 |
$2.10 |
$3.50 |
$3.00 |
$2.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 100 | LF |
$8.00 |
$13.19 |
$8.80 |
$10.00 |
$10.00 |
$10.00 |
$8.40 |
| 6 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 60 | CY |
$50.00 |
$104.42 |
$90.00 |
$100.00 |
$35.00 |
$30.00 |
$60.00 |
| 7 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 2 | EA |
$200.00 |
$180.86 |
$250.00 |
$250.00 |
$425.00 |
$400.00 |
$400.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 930 | SY |
$5.00 |
$2.40 |
$2.20 |
$3.50 |
$5.00 |
$4.00 |
$3.15 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.2 | AC |
$3,000.00 |
$149.26 |
$1,000.00 |
$1,500.00 |
$1,000.00 |
$1,000.00 |
$1,050.00 |
| 10 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 820 | SY |
$10.00 |
$23.97 |
$15.20 |
$12.00 |
$14.00 |
$10.00 |
$10.00 |
| 11 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 758 | SY |
$22.00 |
$16.28 |
$25.55 |
$20.00 |
$30.00 |
$20.00 |
$70.00 |
| 12 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 211 | CY |
$115.00 |
$102.49 |
$95.00 |
$118.00 |
$145.00 |
$140.00 |
$110.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$250.00 |
$156.75 |
$250.20 |
$300.00 |
$300.00 |
$420.00 |
$280.00 |
| 14 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 210 | LF |
$22.00 |
$23.11 |
$19.20 |
$25.00 |
$24.00 |
$3.50 |
$10.00 |
| 15 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 203 | SY |
$55.00 |
$45.74 |
$41.20 |
$60.00 |
$65.00 |
$62.00 |
$48.00 |
| 16 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 1 | EA |
$1,200.00 |
$1,709.13 |
$1,600.00 |
$1,200.00 |
$4,000.00 |
$2,300.00 |
$4,000.00 |
| 17 | 611(G) 5122 |
INLET CI DES. 3 (D) | 2 | EA |
$2,800.00 |
$6,098.92 |
$4,500.00 |
$2,500.00 |
$8,000.00 |
$6,600.00 |
$500.00 |
| 18 | 611(G) 5125 |
INLET CI DES. 3 (2D) | 1 | EA |
$4,200.00 |
$7,354.99 |
$7,000.00 |
$3,500.00 |
$9,800.00 |
$8,000.00 |
$14,500.00 |
| 19 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 1 | EA |
$750.00 |
$1,748.32 |
$500.00 |
$500.00 |
$1,000.00 |
$1,500.00 |
$800.00 |
| 20 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 46 | LF |
$24.00 |
$44.23 |
$36.00 |
$35.00 |
$77.00 |
$72.00 |
$40.00 |
| 21 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 37 | LF |
$35.00 |
$58.33 |
$40.00 |
$38.00 |
$80.00 |
$88.00 |
$45.00 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 756 | SY |
$14.00 |
$4.31 |
$3.20 |
$10.00 |
$15.00 |
$5.50 |
$4.00 |
| 23 | 619(B) 4766 |
REMOVAL OF CONCRETE DRIVEWAY | 163 | SY |
$15.00 |
$9.19 |
$4.20 |
$10.00 |
$13.00 |
$13.00 |
$5.00 |
| 24 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 2 | EA |
$1,000.00 |
$602.87 |
$5,020.20 |
$500.00 |
$2,700.00 |
$1,500.00 |
$700.00 |
| 25 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,652.62 |
$2,220.20 |
$2,400.00 |
$2,600.00 |
$2,095.00 |
$2,310.00 |
| 26 | 623(I) 8675 |
GUARDRAIL BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,446.88 |
$1,450.00 |
$1,300.00 |
$1,650.00 |
$1,325.00 |
$1,260.00 |
| 27 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$200.00 |
$60.29 |
$275.00 |
$250.00 |
$375.00 |
$250.00 |
$105.00 |
| 28 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 710 | LF |
$0.3000 |
$1.39 |
$1.10 |
$1.25 |
$1.25 |
$1.00 |
$1.21 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$4,280.36 |
$8,800.00 |
$1,700.00 |
$3,000.00 |
$8,000.00 |
$3,728.00 |
| 30 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,490 | CY |
$10.00 |
$10.97 |
$9.20 |
$7.00 |
$14.50 |
$59.00 |
$25.00 |
| 31 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 440 | CY |
$48.00 |
$31.60 |
$37.20 |
$52.00 |
$55.00 |
$71.00 |
$49.00 |
| 32 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 894 | CY |
$20.00 |
$15.33 |
$8.20 |
$15.00 |
$29.00 |
$14.00 |
$35.00 |
| 33 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 109.5 | LF |
$100.00 |
$54.81 |
$80.20 |
$75.00 |
$71.00 |
$100.00 |
$140.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 915 | CY |
$450.00 |
$192.83 |
$351.20 |
$450.00 |
$490.00 |
$424.76 |
$473.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 152,550 | LB |
$0.9000 |
$0.7100 |
$0.7100 |
$1.00 |
$0.9200 |
$0.8000 |
$0.8000 |
| 36 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 51 | SY |
$4.00 |
$15.07 |
$20.20 |
$5.00 |
$6.00 |
$10.00 |
$6.50 |
| 37 | 602(C) 4205 |
FILTER FABRIC | 1,128 | SY |
$10.00 |
$6.92 |
$4.20 |
$2.50 |
$5.00 |
$6.50 |
$2.50 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$39,619.29 |
$30,200.00 |
$65,000.00 |
$52,000.00 |
$26,000.00 |
$190,000.00 |
| 39 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$2,486.83 |
$14,220.00 |
$2,200.00 |
$4,000.00 |
$11,000.00 |
$2,000.00 |
| 40 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$80,285.40 |
$30,143.41 |
$23,000.00 |
$30,000.00 |
$20,000.00 |
$160,700.00 |
$87,648.90 |
| 41 | 625(B) 1252 |
REMOVE AND RECONSTRUCT FENCE | 150 | LF |
$15.00 |
$12.06 |
$10.00 |
$10.00 |
$25.00 |
$75.00 |
$30.00 |
| 42 | 882(A) 8303 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$15,800.00 |
$19,894.65 |
$14,420.00 |
$17,500.00 |
$21,500.00 |
$14,000.00 |
$16,900.00 |