| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$7,416.00 |
$4,883.00 |
$6,500.00 |
$5,000.00 |
$5,200.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$64,000.00 |
$47,225.50 |
$48,000.00 |
$23,000.00 |
$72,000.00 |
$56,300.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,000 | LF |
$2.00 |
$1.03 |
$1.25 |
$1.20 |
$1.10 |
$1.30 |
| 4 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$350.00 |
$270.89 |
$200.00 |
$220.00 |
$500.00 |
$150.00 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$8.00 |
$4.94 |
$4.80 |
$5.20 |
$5.30 |
$5.95 |
| 6 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 10 | CY |
$100.00 |
$105.34 |
$78.09 |
$80.00 |
$100.00 |
$115.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 19,900 | SY |
$1.50 |
$1.14 |
$1.26 |
$1.30 |
$1.22 |
$1.35 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.2 | AC |
$400.00 |
$283.25 |
$150.00 |
$350.00 |
$305.00 |
$500.00 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,371 | TON |
$30.00 |
$21.95 |
$22.90 |
$23.00 |
$21.00 |
$32.00 |
| 10 | 408 5774 |
PRIME COAT | 990 | GAL |
$7.50 |
$10.30 |
$13.25 |
$6.00 |
$14.00 |
$12.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$280.00 |
$515.00 |
$267.00 |
$330.00 |
$300.00 |
$235.00 |
| 12 | 613(A) 4515 |
51" X 31" R.C.PIPE ARCH CLASS A-IV | 32 | LF |
$170.00 |
$149.32 |
$235.00 |
$125.00 |
$162.00 |
$170.00 |
| 13 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 98 | LF |
$35.00 |
$27.20 |
$27.00 |
$50.00 |
$28.00 |
$115.00 |
| 14 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 6 | EA |
$200.00 |
$257.27 |
$262.50 |
$1,500.00 |
$155.00 |
$400.00 |
| 15 | 613(O) 4816 |
SPECIAL END SECTION OF 51" X 31" RCP ARCH | 2 | EA |
$1,300.00 |
$1,941.75 |
$2,100.00 |
$2,200.00 |
$2,300.00 |
$1,970.00 |
| 16 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$10.00 |
$8.24 |
$8.00 |
$10.00 |
$10.00 |
$25.00 |
| 17 | 501(F) 6352 |
GRANULAR BACKFILL | 102 | CY |
$20.00 |
$30.90 |
$38.00 |
$20.00 |
$30.00 |
$38.00 |
| 18 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$190.00 |
$250.29 |
$217.50 |
$235.00 |
$246.00 |
$288.00 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 291.3 | LF |
$60.00 |
$63.86 |
$67.67 |
$65.00 |
$70.00 |
$75.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 420 | LB |
$2.50 |
$3.09 |
$3.00 |
$2.00 |
$4.00 |
$2.00 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$400.00 |
$751.90 |
$1,725.00 |
$700.00 |
$1,200.00 |
$682.00 |
| 22 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$400.00 |
$772.50 |
$1,725.00 |
$700.00 |
$1,200.00 |
$711.00 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 86.1 | CY |
$450.00 |
$412.00 |
$503.33 |
$520.00 |
$500.00 |
$612.00 |
| 24 | 509(B) 1328 |
CLASS A CONCRETE | 80.2 | CY |
$425.00 |
$412.00 |
$528.33 |
$550.00 |
$500.00 |
$487.00 |
| 25 | 511(A) 1332 |
REINFORCING STEEL | 33,510 | LB |
$0.8000 |
$0.8300 |
$0.8700 |
$0.9000 |
$1.00 |
$0.8000 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 124 | LF |
$20.00 |
$36.77 |
$29.50 |
$30.00 |
$25.00 |
$37.00 |
| 27 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 364 | LF |
$25.00 |
$41.20 |
$36.50 |
$35.00 |
$28.50 |
$48.00 |
| 28 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 124 | LF |
$10.00 |
$14.42 |
$8.15 |
$30.00 |
$11.00 |
$7.00 |
| 29 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 364 | LF |
$10.00 |
$14.42 |
$8.15 |
$35.00 |
$13.50 |
$7.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,600 | TON |
$35.00 |
$31.93 |
$31.65 |
$38.00 |
$30.00 |
$39.00 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 715 | TON |
$30.00 |
$24.72 |
$24.95 |
$20.00 |
$24.00 |
$33.00 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 62 | LF |
$25.00 |
$15.45 |
$27.00 |
$15.00 |
$25.00 |
$6.00 |
| 33 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$25.00 |
$15.45 |
$31.50 |
$15.00 |
$25.00 |
$6.00 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$5,150.00 |
$4,100.00 |
$8,500.00 |
$5,000.00 |
$5,000.00 |
| 35 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,500.00 |
$1,776.75 |
$2,100.00 |
$2,000.00 |
$2,255.00 |
$2,025.00 |
| 36 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,781.00 |
$2,400.00 |
$3,500.00 |
$2,500.00 |
$1,900.00 |
| 37 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$10,000.00 |
$3,708.00 |
$4,600.00 |
$1,200.00 |
$4,000.00 |
$4,100.00 |
| 38 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,090.00 |
$2,950.00 |
$1,200.00 |
$2,000.00 |
$2,500.00 |
| 39 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$28,827.11 |
$19,250.00 |
$20,000.00 |
$17,500.00 |
$30,600.00 |