| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,000 | CY |
$10.00 |
$6.75 |
$5.00 |
$6.72 |
$8.00 |
$6.50 |
$8.50 |
$15.92 |
$30.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$11.00 |
$12.50 |
$10.00 |
$10.08 |
$11.00 |
$7.50 |
$12.00 |
$20.66 |
$30.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 10,000 | LF |
$1.50 |
$1.22 |
$1.50 |
$1.12 |
$2.50 |
$2.30 |
$1.50 |
$1.84 |
$3.50 |
| 4 | 232(A) 2813 |
SEEDING METHOD A | 2 | AC |
$250.00 |
$750.00 |
$1,600.00 |
$2,240.00 |
$1,600.00 |
$750.00 |
$800.00 |
$1,958.40 |
$2,900.00 |
| 5 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 429 | CY |
$55.00 |
$48.90 |
$52.00 |
$89.19 |
$55.00 |
$60.00 |
$75.00 |
$28.00 |
$85.00 |
| 6 | 407(B) 0250 |
TACK COAT | 12.5 | GAL |
$4.00 |
$10.00 |
$4.00 |
$11.20 |
$10.00 |
$3.00 |
$10.00 |
$12.24 |
$4.00 |
| 7 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,014 | TON |
$75.00 |
$85.00 |
$80.00 |
$82.43 |
$73.60 |
$96.00 |
$75.00 |
$99.71 |
$100.00 |
| 8 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 28 | TON |
$80.00 |
$99.00 |
$100.00 |
$277.03 |
$247.35 |
$380.00 |
$250.00 |
$302.76 |
$100.00 |
| 9 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 608 | TON |
$80.00 |
$99.00 |
$80.00 |
$96.88 |
$86.50 |
$100.00 |
$90.00 |
$111.45 |
$100.00 |
| 10 | 412 5267 |
COLD MILLING PAVEMENT | 167 | SY |
$3.50 |
$52.00 |
$30.00 |
$47.04 |
$7.00 |
$60.00 |
$55.00 |
$33.62 |
$5.75 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 16.2 | CY |
$350.00 |
$325.00 |
$532.00 |
$332.00 |
$500.00 |
$300.00 |
$600.00 |
$141.31 |
$550.00 |
| 12 | 613(A) 0400 |
12" R.C.PIPE CLASS III | 150 | LF |
$100.00 |
$32.00 |
$60.00 |
$33.98 |
$100.00 |
$44.00 |
$50.00 |
$29.57 |
$45.00 |
| 13 | 613(L) 5722 |
12" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$1,000.00 |
$525.00 |
$756.00 |
$908.57 |
$1,000.00 |
$860.00 |
$1,100.00 |
$887.23 |
$1,200.00 |
| 14 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 265 | LF |
$5.00 |
$2.00 |
$1.25 |
$5.60 |
$1.00 |
$1.25 |
$3.00 |
$4.90 |
$5.00 |
| 15 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 512.5 | LF |
$20.00 |
$13.74 |
$14.35 |
$16.75 |
$17.40 |
$21.00 |
$18.00 |
$18.34 |
$26.00 |
| 16 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 4 | EA |
$1,000.00 |
$250.00 |
$1,500.00 |
$1,456.00 |
$1,250.00 |
$1,500.00 |
$1,750.00 |
$1,560.60 |
$2,000.00 |
| 17 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$500.00 |
$350.00 |
$2,500.00 |
$616.00 |
$800.00 |
$980.00 |
$500.00 |
$673.20 |
$800.00 |
| 18 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 2 | EA |
$2,000.00 |
$1,900.00 |
$2,100.00 |
$2,184.00 |
$2,100.00 |
$2,500.00 |
$2,500.00 |
$2,564.28 |
$2,700.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 6 | CY |
$150.00 |
$425.00 |
$198.00 |
$305.22 |
$100.00 |
$390.00 |
$200.00 |
$206.51 |
$700.00 |
| 20 | 504(A) 1304 |
APPROACH SLAB | 214.4 | SY |
$150.00 |
$158.58 |
$129.00 |
$136.74 |
$140.00 |
$161.00 |
$225.00 |
$183.86 |
$285.00 |
| 21 | 504(B) 1305 |
SAW-CUT GROOVING | 3,582.5 | SY |
$5.25 |
$5.02 |
$4.00 |
$3.62 |
$2.25 |
$4.00 |
$3.50 |
$0.9400 |
$5.75 |
| 22 | 504(C) 6250 |
SEALED EXPANSION JOINT | 128.7 | LF |
$250.00 |
$337.90 |
$287.00 |
$304.00 |
$215.00 |
$303.00 |
$375.00 |
$350.20 |
$295.00 |
| 23 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 2,149.5 | LF |
$75.00 |
$45.75 |
$47.00 |
$58.80 |
$65.00 |
$64.00 |
$80.00 |
$50.24 |
$100.00 |
| 24 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 32.2 | LF |
$25.00 |
$21.68 |
$3.00 |
$27.37 |
$25.00 |
$29.00 |
$45.00 |
$42.23 |
$60.00 |
| 25 | 506(A) 1322 |
STRUCTURAL STEEL | 41,790 | LB |
$6.00 |
$5.85 |
$4.00 |
$8.56 |
$5.00 |
$9.00 |
$5.50 |
$14.55 |
$28.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 929.2 | CY |
$550.00 |
$537.72 |
$465.00 |
$539.87 |
$575.00 |
$575.00 |
$785.00 |
$367.54 |
$1,900.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 12,865 | LB |
$0.8000 |
$1.02 |
$1.00 |
$1.67 |
$0.8000 |
$0.8500 |
$1.50 |
$0.8600 |
$6.00 |
| 28 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 360,346 | LB |
$1.00 |
$1.06 |
$1.10 |
$0.9800 |
$0.9500 |
$1.00 |
$1.00 |
$0.8200 |
$1.40 |
| 29 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$39,800.00 |
$52,500.00 |
$70,000.00 |
$32,050.50 |
$30,000.00 |
$34,000.00 |
$50,000.00 |
$91,800.00 |
$110,000.00 |
| 30 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$11,400.00 |
$16,000.00 |
$4,000.00 |
$2,104.50 |
$5,000.00 |
$2,200.00 |
$20,000.00 |
$42,840.00 |
$3,000.00 |
| 31 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,639.2 | SY |
$4.50 |
$3.40 |
$8.00 |
$3.91 |
$4.50 |
$4.00 |
$4.00 |
$31.42 |
$6.00 |
| 32 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$40.00 |
$35.30 |
$9.00 |
$28.75 |
$35.30 |
$30.00 |
$50.00 |
$43.21 |
$125.00 |
| 33 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2 | GAL |
$80.00 |
$70.00 |
$90.00 |
$57.50 |
$70.00 |
$61.00 |
$100.00 |
$85.68 |
$300.00 |
| 34 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$741.66 |
$953.00 |
$864.80 |
$741.66 |
$920.00 |
$750.00 |
$907.79 |
$3,000.00 |
| 35 | 523(A) 6550 |
SEALER CRACK PREPARATION | 418.2 | LF |
$5.00 |
$3.00 |
$9.00 |
$3.45 |
$5.00 |
$3.50 |
$4.00 |
$42.84 |
$12.00 |
| 36 | 523(B) 6560 |
SEALER RESIN | 4.2 | GAL |
$175.00 |
$100.00 |
$120.00 |
$115.00 |
$175.00 |
$120.00 |
$125.00 |
$183.60 |
$300.00 |
| 37 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 82.7 | SF |
$50.00 |
$93.42 |
$70.00 |
$78.20 |
$93.42 |
$80.00 |
$65.00 |
$114.35 |
$120.00 |
| 38 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 980 | EA |
$30.00 |
$62.53 |
$41.00 |
$63.07 |
$50.00 |
$67.00 |
$45.00 |
$44.68 |
$120.00 |
| 39 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 62 | EA |
$500.00 |
$312.19 |
$523.00 |
$736.00 |
$700.00 |
$780.00 |
$1,300.00 |
$4,674.89 |
$1,500.00 |
| 40 | 540 4535 |
(PL)REPAIR BRIDGE ITEM (TYPE C) | 4 | EA |
$400.00 |
$296.22 |
$280.00 |
$1,437.50 |
$600.00 |
$580.00 |
$1,400.00 |
$3,060.00 |
$3,300.00 |
| 41 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$261,000.00 |
$88,500.00 |
$350,000.00 |
$150,075.00 |
$300,000.00 |
$235,000.00 |
$220,000.00 |
$165,484.80 |
$457,000.00 |
| 42 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 9,070 | LF |
$1.00 |
$0.6700 |
$0.7000 |
$0.7700 |
$0.6700 |
$0.8000 |
$1.00 |
$0.8200 |
$0.7000 |
| 43 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 11,200 | LF |
$0.2500 |
$0.1500 |
$0.1200 |
$0.1300 |
$0.1500 |
$0.1800 |
$0.2000 |
$0.1800 |
$0.4000 |
| 44 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 17,550 | LF |
$0.2000 |
$0.1000 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1200 |
$0.0500 |
$0.1200 |
$0.4000 |
| 45 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,000 | LF |
$20.00 |
$22.00 |
$28.00 |
$11.44 |
$21.00 |
$26.00 |
$40.00 |
$32.69 |
$49.00 |
| 46 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 360 | SD |
$25.00 |
$2.00 |
$5.00 |
$3.85 |
$2.00 |
$2.45 |
$12.00 |
$2.45 |
$7.50 |
| 47 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 7,020 | SD |
$1.50 |
$0.1900 |
$0.0300 |
$0.0200 |
$0.1900 |
$0.2300 |
$0.1000 |
$0.2300 |
$0.6500 |
| 48 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,410 | SD |
$1.50 |
$0.1900 |
$2.00 |
$1.65 |
$0.1900 |
$0.2300 |
$1.50 |
$0.2300 |
$1.00 |
| 49 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,480 | SD |
$1.50 |
$2.00 |
$2.50 |
$2.20 |
$2.00 |
$2.45 |
$2.00 |
$2.45 |
$1.50 |
| 50 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,250 | SD |
$0.5000 |
$2.00 |
$0.3000 |
$0.2800 |
$2.00 |
$2.45 |
$0.8500 |
$2.45 |
$1.25 |
| 51 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,980 | SD |
$0.1000 |
$0.5500 |
$0.0600 |
$0.0600 |
$0.5500 |
$0.6700 |
$0.3500 |
$0.6700 |
$0.5000 |
| 52 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 22,200 | SD |
$0.1000 |
$0.0300 |
$0.0300 |
$0.0200 |
$0.0300 |
$0.0400 |
$0.0200 |
$0.0400 |
$0.6000 |
| 53 | 880(F) 8878 |
DRUMS | 22,200 | SD |
$0.5000 |
$0.0400 |
$0.1200 |
$0.1100 |
$0.0400 |
$0.0500 |
$0.1500 |
$0.0500 |
$0.1500 |
| 54 | 642(A) 0095 |
CONSTRUCTION STAKING LEVEL I | 1 | LSUM |
$10,000.00 |
$5,500.00 |
$5,000.00 |
$7,480.00 |
$10,000.00 |
$5,000.00 |
$5,000.00 |
$9,180.00 |
$10,000.00 |
| 55 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$102,596.76 |
$100,000.00 |
$129,801.28 |
$130,000.00 |
$40,000.00 |
$150,000.00 |
$91,800.00 |
$285,000.00 |