| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$4,800.00 |
$4,785.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 6,252 | CY |
$5.00 |
$4.00 |
$4.00 |
$6.70 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 8,248 | CY |
$5.00 |
$5.25 |
$5.00 |
$5.88 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$6,000.00 |
$6,000.00 |
$3,000.00 |
$5,093.00 |
| 5 | 223 2801 |
TEMPORARY SILT FENCE | 3,005 | LF |
$2.00 |
$0.7500 |
$1.20 |
$1.29 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 176 | LF |
$5.00 |
$3.00 |
$6.25 |
$8.42 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 24,042 | SY |
$2.00 |
$1.40 |
$1.40 |
$1.58 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.41 | AC |
$600.00 |
$350.00 |
$350.00 |
$187.00 |
| 9 | 303 0192 |
AGGREGATE BASE | 1,098 | CY |
$30.00 |
$37.00 |
$36.00 |
$41.49 |
| 10 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 256 | TON |
$20.00 |
$23.00 |
$20.00 |
$17.81 |
| 11 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 1,482 | TON |
$65.00 |
$75.00 |
$77.93 |
$85.72 |
| 12 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 751 | TON |
$70.00 |
$77.00 |
$79.03 |
$86.93 |
| 13 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 17 | CY |
$20.00 |
$40.00 |
$100.00 |
$22.00 |
| 14 | 509(B) 1328 |
CLASS A CONCRETE | 49 | CY |
$420.00 |
$300.00 |
$500.00 |
$550.00 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$100.00 |
$450.00 |
$660.00 |
| 16 | 511(A) 1332 |
REINFORCING STEEL | 8,857 | LB |
$0.9000 |
$1.00 |
$1.00 |
$1.10 |
| 17 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 932 | TON |
$28.00 |
$23.00 |
$23.00 |
$29.83 |
| 18 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 187 | TON |
$25.00 |
$18.50 |
$20.00 |
$25.34 |
| 19 | 601(E) 6312 |
FILTER FABRIC (RIPRAP) | 759 | SY |
$2.00 |
$1.00 |
$1.50 |
$1.16 |
| 20 | 613(CC) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,000.00 |
$650.00 |
$850.00 |
$880.00 |
| 21 | 613(H) 0780 |
18" CORR. ALUMINUM PIPE | 104 | LF |
$40.00 |
$24.00 |
$23.00 |
$26.40 |
| 22 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,333 | SY |
$4.25 |
$0.2000 |
$2.30 |
$1.51 |
| 23 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 8,200 | LF |
$1.00 |
$0.5500 |
$0.5100 |
$0.5600 |
| 24 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 96 | CY |
$18.00 |
$15.00 |
$45.00 |
$13.20 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 112 | CY |
$125.00 |
$85.00 |
$95.00 |
$110.58 |
| 26 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 889 | LF |
$170.00 |
$174.00 |
$230.00 |
$194.26 |
| 27 | 504(A) 1304 |
APPROACH SLAB | 184 | SY |
$170.00 |
$70.00 |
$145.00 |
$198.00 |
| 28 | 504(E) 6239 |
CONCRETE RAIL (TR3) | 520 | LF |
$60.00 |
$80.00 |
$53.00 |
$56.70 |
| 29 | 506(A) 1322 |
STRUCTURAL STEEL | 5,040 | LB |
$3.75 |
$4.00 |
$3.00 |
$2.75 |
| 30 | 509(A) 1326 |
CLASS AA CONCRETE | 251 | CY |
$400.00 |
$213.00 |
$365.00 |
$454.12 |
| 31 | 509(B) 1328 |
CLASS A CONCRETE | 111 | CY |
$420.00 |
$375.00 |
$365.00 |
$441.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 74,084 | LB |
$0.8300 |
$1.13 |
$0.8000 |
$0.8700 |
| 33 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 468 | LF |
$30.00 |
$16.00 |
$25.75 |
$25.27 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 468 | LF |
$20.00 |
$8.00 |
$18.50 |
$11.00 |
| 35 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 122 | LF |
$450.00 |
$655.00 |
$370.00 |
$376.03 |
| 36 | 601(A-1)1353 |
TYPE I-A PLAIN RIPRAP | 2,690 | TON |
$28.00 |
$22.80 |
$23.00 |
$29.83 |
| 37 | 601(A-2)1355 |
TYPE I-A FILTER BLANKET | 676 | TON |
$25.00 |
$18.35 |
$20.00 |
$25.34 |
| 38 | 601(E) 6312 |
FILTER FABRIC (RIPRAP) | 79 | SY |
$2.00 |
$1.00 |
$3.50 |
$1.16 |
| 39 | 613(P) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 70 | LF |
$25.00 |
$40.00 |
$30.00 |
$22.00 |
| 40 | 613(Q) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 10 | LF |
$20.00 |
$40.00 |
$30.00 |
$22.00 |
| 41 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$15,000.00 |
$22,000.00 |
| 42 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 50 | LF |
$20.00 |
$19.00 |
$15.00 |
$20.35 |
| 43 | 623(F) 5686 |
GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,425.00 |
$1,200.00 |
$1,595.00 |
| 44 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,500.00 |
$2,300.00 |
$2,100.00 |
$2,557.50 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$3,000.00 |
$3,300.00 |
| 46 | 642 0098 |
STAKING | 1 | LSUM |
$7,500.00 |
$7,100.00 |
$12,500.00 |
$6,160.00 |
| 47 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$2,000.00 |
$4,000.00 |
$3,850.00 |
| 48 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$48,000.00 |
$27,500.00 |
$18,500.00 |
$45,239.78 |