Bid tab 100553

Let Oct 21, 2010 · Division 8 · Craig Sign up free

‹ Oct 2010 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-25): OVER PAW PAW CREEK , 5.0 MILES WEST OF THE SH-2 JUNCTION. PROJECT LENGTH = 0.388 MILES

Let date
Thursday, October 21, 2010
Contract
100553
J/P numbers
23419(04)
District
Division 8
County
Craig
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-25): OVER PAW PAW CREEK , 5.0 MILES WEST OF THE SH-2 JUNCTION. PROJECT LENGTH = 0.388 MILES
Project number
CIRB-118D(071)RB

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,229,043
1 BELK BRIDGE, INC. Low bidder $1,052,146 -14.4%
2 BEACHNER CONSTRUCTION CO., INC. $1,112,012 -9.5% +5.7%
4 PLAINS BRIDGE CONTRACTING OF OK.,LLC & TREAS CONST. INC.(JV) $1,236,884 +0.6% +17.6%

Bid tab: unit prices 48 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BELK BRIDGE, IN…#2 BEACHNER CONSTR…#4 PLAINS BRIDGE C…
1201 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $8,000.00 $4,800.00 $4,785.00
2202(A) 0183 UNCLASSIFIED EXCAVATION6,252CY $5.00 $4.00 $4.00 $6.70
3202(C) 0184 UNCLASSIFIED BORROW8,248CY $5.00 $5.25 $5.00 $5.88
4205 4229 TYPE A-SALVAGED TOPSOIL1LSUM $6,000.00 $6,000.00 $3,000.00 $5,093.00
5223 2801 TEMPORARY SILT FENCE3,005LF $2.00 $0.7500 $1.20 $1.29
6227 0100 TEMPORARY SILT DIKE176LF $5.00 $3.00 $6.25 $8.42
7230(A) 2806 SOLID SLAB SODDING24,042SY $2.00 $1.40 $1.40 $1.58
8233(A) 2817 VEGETATIVE MULCHING4.41AC $600.00 $350.00 $350.00 $187.00
9303 0192 AGGREGATE BASE1,098CY $30.00 $37.00 $36.00 $41.49
10403(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E256TON $20.00 $23.00 $20.00 $17.81
11411(S3) 5945 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK)1,482TON $65.00 $75.00 $77.93 $85.72
12411(S4) 5960 (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK)751TON $70.00 $77.00 $79.03 $86.93
13501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED17CY $20.00 $40.00 $100.00 $22.00
14509(B) 1328 CLASS A CONCRETE49CY $420.00 $300.00 $500.00 $550.00
15509(D) 0325 CLASS C CONCRETE10CY $300.00 $100.00 $450.00 $660.00
16511(A) 1332 REINFORCING STEEL8,857LB $0.9000 $1.00 $1.00 $1.10
17601(A-1)1353 TYPE I-A PLAIN RIPRAP932TON $28.00 $23.00 $23.00 $29.83
18601(A-2)1355 TYPE I-A FILTER BLANKET187TON $25.00 $18.50 $20.00 $25.34
19601(E) 6312 FILTER FABRIC (RIPRAP)759SY $2.00 $1.00 $1.50 $1.16
20613(CC) 7186 TYPE A4 CULVERT END TREATMENT6EA $1,000.00 $650.00 $850.00 $880.00
21613(H) 0780 18" CORR. ALUMINUM PIPE104LF $40.00 $24.00 $23.00 $26.40
22619(B) 4728 REMOVAL OF ASPHALT PAVEMENT4,333SY $4.25 $0.2000 $2.30 $1.51
23855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)8,200LF $1.00 $0.5500 $0.5100 $0.5600
24501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON96CY $18.00 $15.00 $45.00 $13.20
25501(G) 6309 CLSM BACKFILL112CY $125.00 $85.00 $95.00 $110.58
26503(A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III)889LF $170.00 $174.00 $230.00 $194.26
27504(A) 1304 APPROACH SLAB184SY $170.00 $70.00 $145.00 $198.00
28504(E) 6239 CONCRETE RAIL (TR3)520LF $60.00 $80.00 $53.00 $56.70
29506(A) 1322 STRUCTURAL STEEL5,040LB $3.75 $4.00 $3.00 $2.75
30509(A) 1326 CLASS AA CONCRETE251CY $400.00 $213.00 $365.00 $454.12
31509(B) 1328 CLASS A CONCRETE111CY $420.00 $375.00 $365.00 $441.00
32511(A) 1332 REINFORCING STEEL74,084LB $0.8300 $1.13 $0.8000 $0.8700
33514(A) 6010 PILES, FURNISHED (HP 10X42)468LF $30.00 $16.00 $25.75 $25.27
34514(B) 6292 PILES, DRIVEN (HP 10X42)468LF $20.00 $8.00 $18.50 $11.00
35516(A) 6093 DRILLED SHAFTS 42" DIAMETER122LF $450.00 $655.00 $370.00 $376.03
36601(A-1)1353 TYPE I-A PLAIN RIPRAP2,690TON $28.00 $22.80 $23.00 $29.83
37601(A-2)1355 TYPE I-A FILTER BLANKET676TON $25.00 $18.35 $20.00 $25.34
38601(E) 6312 FILTER FABRIC (RIPRAP)79SY $2.00 $1.00 $3.50 $1.16
39613(P) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND70LF $25.00 $40.00 $30.00 $22.00
40613(Q) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.10LF $20.00 $40.00 $30.00 $22.00
41619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $10,000.00 $15,000.00 $22,000.00
42623(A) 0932 BEAM GUARD RAIL-W-BEAM-SINGLE50LF $20.00 $19.00 $15.00 $20.35
43623(F) 5686 GUARD RAIL ANCHOR UNIT (TYPE D-BF)4EA $1,500.00 $1,425.00 $1,200.00 $1,595.00
44623(H) 8571 (SP)G.E.T. GUARD RAIL END SECTION4EA $2,500.00 $2,300.00 $2,100.00 $2,557.50
45880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $4,000.00 $3,000.00 $3,300.00
46642 0098 STAKING1LSUM $7,500.00 $7,100.00 $12,500.00 $6,160.00
47220 2800 (SP)SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $2,000.00 $4,000.00 $3,850.00
48641 1399 MOBILIZATION1LSUM $48,000.00 $27,500.00 $18,500.00 $45,239.78