| 1 | 201 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$22,000.00 |
$15,500.00 |
$3,684.33 |
$26,384.51 |
$3,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,829 | CY |
$5.00 |
$3.15 |
$3.05 |
$5.26 |
$5.11 |
$5.00 |
| 3 | 202(C) 0184 |
UNCLASSIFIED BORROW | 4,181 | CY |
$7.00 |
$5.50 |
$5.10 |
$8.42 |
$8.18 |
$8.00 |
| 4 | 205 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$15,225.00 |
$14,737.32 |
$14,309.98 |
$14,000.00 |
| 5 | 224 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$250.00 |
$200.00 |
$203.00 |
$159.50 |
$309.74 |
$150.00 |
| 6 | 227 0100 |
TEMPORARY SILT DIKE | 266 | LF |
$7.00 |
$15.00 |
$9.05 |
$6.38 |
$7.23 |
$6.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 51,053 | SY |
$2.50 |
$1.35 |
$1.26 |
$1.28 |
$1.29 |
$1.20 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 9 | AC |
$450.00 |
$300.00 |
$101.50 |
$212.66 |
$309.74 |
$200.00 |
| 9 | 241 2832 |
MOWING | 18 | AC |
$60.00 |
$45.00 |
$101.50 |
$79.75 |
$25.81 |
$75.00 |
| 10 | 303 0192 |
AGGREGATE BASE | 4,969 | CY |
$45.00 |
$54.00 |
$62.30 |
$71.45 |
$51.45 |
$66.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 19,920 | SY |
$1.50 |
$1.30 |
$1.05 |
$1.19 |
$0.8400 |
$1.55 |
| 12 | 327(K) 4300 |
(SP)STABILIZED SUBGRADE | 23,966 | SY |
$5.00 |
$4.75 |
$2.00 |
$4.39 |
$4.89 |
$5.00 |
| 13 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 4,707 | TON |
$25.00 |
$28.65 |
$35.20 |
$27.37 |
$25.60 |
$26.00 |
| 14 | 407 0250 |
TACK COAT | 14,874 | GAL |
$3.00 |
$2.00 |
$2.65 |
$3.25 |
$2.14 |
$2.75 |
| 15 | 408 5774 |
PRIME COAT | 7,226 | GAL |
$5.00 |
$4.80 |
$4.85 |
$4.00 |
$5.46 |
$3.50 |
| 16 | 411(S3) 5935 |
(SP)ASPHALT CONCRETE TYPE S3(PG 76-28 OK) | 2,681 | TON |
$67.00 |
$61.70 |
$57.15 |
$64.81 |
$64.30 |
$73.00 |
| 17 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 4,592 | TON |
$58.00 |
$51.70 |
$48.28 |
$50.35 |
$57.20 |
$67.00 |
| 18 | 411(S4) 5950 |
(SP)ASPHALT CONCRETE TYPE S4(PG 76-28 OK) | 37,868 | TON |
$60.00 |
$64.50 |
$69.15 |
$74.67 |
$78.44 |
$74.10 |
| 19 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 628 | TON |
$60.00 |
$59.00 |
$66.80 |
$49.10 |
$65.59 |
$70.00 |
| 20 | 417 5267 |
COLD MILLING PAVEMENT | 253,715 | SY |
$2.50 |
$0.7500 |
$1.13 |
$0.7100 |
$0.5700 |
$0.8300 |
| 21 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 56 | CY |
$12.00 |
$21.00 |
$8.25 |
$31.58 |
$30.66 |
$30.00 |
| 22 | 509(A) 0319 |
CLASS AA CONCRETE | 26 | CY |
$450.00 |
$475.00 |
$305.00 |
$1,126.35 |
$1,093.69 |
$1,070.00 |
| 23 | 509(D) 0325 |
CLASS C CONCRETE | 1,079 | CY |
$250.00 |
$210.00 |
$196.25 |
$204.22 |
$198.30 |
$194.00 |
| 24 | 511(A) 0332 |
REINFORCING STEEL | 3,908 | LB |
$1.00 |
$0.8000 |
$1.00 |
$0.7900 |
$0.7700 |
$0.7500 |
| 25 | 611(E) 6002 |
INLET (SMD-TYPE 2) | 1 | EA |
$1,700.00 |
$1,400.00 |
$660.00 |
$2,105.33 |
$2,044.28 |
$2,000.00 |
| 26 | 613(D) 0689 |
18" CORR. GALV. STEEL PIPE | 126 | LF |
$20.00 |
$15.00 |
$19.00 |
$25.26 |
$24.53 |
$24.00 |
| 27 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 14,957 | SY |
$3.00 |
$2.30 |
$0.1500 |
$1.45 |
$2.50 |
$3.45 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 1,498 | LF |
$2.40 |
$2.00 |
$4.05 |
$4.42 |
$2.12 |
$4.00 |
| 29 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,587.5 | LF |
$3.53 |
$5.00 |
$4.30 |
$5.05 |
$5.21 |
$4.80 |
| 30 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,875 | LF |
$21.61 |
$30.00 |
$21.25 |
$29.21 |
$28.62 |
$27.75 |
| 31 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 9,000 | LF |
$0.1500 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.2600 |
$0.1000 |
| 32 | 856(G) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 9,240 | EA |
$0.4200 |
$1.00 |
$0.4100 |
$0.4300 |
$0.4100 |
$0.4000 |
| 33 | 870(A) 8490 |
(PL)SAND FILLED IMPACT ATTENUATION SYSTEM | 240 | SD |
$3.91 |
$10.50 |
$10.15 |
$10.63 |
$10.32 |
$10.00 |
| 34 | 876(C) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$24.98 |
$75.00 |
$127.00 |
$132.91 |
$129.06 |
$125.00 |
| 35 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 120 | SD |
$6.25 |
$5.25 |
$5.10 |
$5.32 |
$5.16 |
$5.00 |
| 36 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 8,850 | SD |
$0.2300 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 37 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,090 | SD |
$0.6800 |
$1.05 |
$1.05 |
$1.06 |
$1.03 |
$1.00 |
| 38 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,390 | SD |
$1.00 |
$1.57 |
$1.50 |
$1.60 |
$1.55 |
$1.50 |
| 39 | 880(C) 8842 |
BARRICADES(TYPE III) | 1,890 | SD |
$0.5100 |
$0.2600 |
$0.2500 |
$0.2700 |
$0.2600 |
$0.2500 |
| 40 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$0.6600 |
$2.10 |
$2.00 |
$2.13 |
$2.06 |
$2.00 |
| 41 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,870 | SD |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 42 | 880(E) 8872 |
WARNING LIGHTS(TYPE C) | 27,000 | SD |
$0.0500 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
| 43 | 880(F) 8878 |
DRUMS | 16,200 | SD |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 44 | 880(G) 8890 |
CHANNELIZER CONES | 10,750 | SD |
$0.1200 |
$0.1100 |
$0.1000 |
$0.1100 |
$0.1000 |
$0.1000 |
| 45 | 882(B) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 240 | SD |
$13.58 |
$13.00 |
$12.70 |
$13.29 |
$15.49 |
$12.50 |
| 46 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 101.6 | SF |
$15.35 |
$12.60 |
$12.18 |
$12.76 |
$12.39 |
$12.00 |
| 47 | 851(C) 8324 |
2" SQUARE TUBE POST | 224 | LF |
$7.50 |
$8.40 |
$8.15 |
$8.51 |
$8.26 |
$8.00 |
| 48 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 153,958 | LF |
$0.4500 |
$0.3500 |
$0.3300 |
$0.3500 |
$0.3600 |
$0.3300 |
| 49 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 23,568 | LF |
$0.6000 |
$0.4600 |
$0.4500 |
$0.4700 |
$0.5200 |
$0.4400 |
| 50 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 28 | EA |
$78.50 |
$78.75 |
$76.15 |
$79.75 |
$77.43 |
$75.00 |
| 51 | 890A/B 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 60 | EA |
$155.00 |
$78.75 |
$76.15 |
$79.75 |
$129.06 |
$75.00 |
| 52 | 642 0098 |
STAKING | 1 | LSUM |
$10,000.00 |
$40,000.00 |
$18,500.00 |
$21,053.31 |
$16,354.26 |
$7,000.00 |
| 53 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$15,225.00 |
$1,949.50 |
$613.29 |
$5,000.00 |
| 54 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$140,000.00 |
$190,000.00 |
$200,000.00 |
$161,000.00 |
$263,300.00 |