Filtered by: District: Division 1 Clear all
| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 9, 2025 | 230283 SBR-4000(163)SB | McintoshDivision 1 | COUNTY ROADS (TEXANNA ROADE1120) | Bridge Painting COUNTY ROADS (TEXANNA ROAD/E1120): TEXANNA ROAD, OVER I-40 5.2 MILES EAST OF THE US-69 INTERCHANGE NEAR CHECOTAH. E1120, OVER US-69 4.8 MILES SOUTH OF THE I-40 INTERCHANGE NEAR CHECOTAH. | $497,445 | Let | OMEGA COATINGS & CONSTRUCTION, LLC $491,183 · -1.3% | |
| Jan 9, 2025 | 250021 SSR-268C(101)SR | SequoyahDivision 1 | SH-64B | Resurface (Asphalt) SH-64B: FROM 5.39 MILES NORTH OF THE I-40 JUNCTION, EXTEND NORTH NEAR MULDROW. | — | Let | McKenzie Asphalt, LLC $1,100,700 · | |
| Jan 16, 2025 | 240160 TAP-273D(099)IG | WagonerDivision 1 | CITY STREET (E. PECAN STREET) | Pedestrian Improvements (Sidewalk) CITY STREET (E. PECAN STREET): FROM SH-72, EXTEND EAST IN COWETA. | $563,889 | Let | R & L Construction, LLC $517,138 · -8.3% | |
| Jan 16, 2025 | 240262 NHPP-013N(242)PM / NHPP-013N(243)PM | WagonerDivision 1 | US-69 | Bridge And Pavement Rehabilitation US-69: FROM 1.8 MILES NORTH OF THE MUSKOGEE TURNPIKE (US-351) INTERCHANGE, EXTEND NORTH NEAR WAGONER. | — | Let | ||
| Jan 16, 2025 | 240282 NHPP-013N(247)PM | WagonerDivision 1 | US-69 | Resurface (Asphalt) US-69: FROM 0.15 MILES NORTH OF THE INTERSECTION OF SH-51B, EXTEND NORTH NEAR WAGONER. | — | Let | ||
| Jan 16, 2025 | 240283 NHPP-013N(242)PM / NHPP-013N(243)PM / NHPP-013N(247)PM | WagonerDivision 1 | US-69 | Bridge And Pavement Rehabilitation And Resurface (Asphalt) US-69: FROM 0.15 MILES NORTH OF THE INTERSECTION OF SH-51B, EXTEND NORTH NEAR WAGONER. | — | Let | Robinson Construction, LLC $29,438,602 · | |
| Feb 20, 2025 | 250050 SSR-201B(062)SR | AdairDivision 1 | US-62 | Resurface (Asphalt) US-62: FROM 5.0 MILES NORTHEAST OF THE SH-51 INTERSECTION, EXTEND EAST NEAR TAHLEQUAH. | $1,505,623 | Let | APAC-CENTRAL, INC. $1,434,456 · -4.7% | |
| Mar 13, 2025 | 250067 SSR-211B(104)SR | CherokeeDivision 1 | US-62 | Concrete Pavement Joint Seal US-62: FROM 10.8 MILES NORTHEAST OF THE SH-165 INTERSECTION, EXTEND NORTHEAST NEAR FORT GIBSON. | $423,940 | Let | DIAMOND SURFACE, INC. $376,312 · -11.2% | |
| Apr 10, 2025 | 240260 NHPP-168N(179)FP | SequoyahDivision 1 | US-59 | Grade, Drain, Bridge, And Surface US-59: OVER HOG CREEK, FROM THE INTERSECTION OF US-64, EXTEND NORTH IN SALLISAW. | $17,056,846 | Let | APAC-CENTRAL, INC. $16,194,999 · -5.1% | |
| Apr 10, 2025 | 250066 STP-211D(101)CI | CherokeeDivision 1 | COUNTY ROAD (EW-68SH-82B) | Bridge And Approaches COUNTY ROAD (EW-68/SH-82B): OVER FOURTEEN MILE CREEK, 1.98 MILES WEST OF SH-10 IN MOODYS. | $1,237,642 | Let | Treas Construction Inc $1,145,520 · -7.4% | |
| May 8, 2025 | 250109 STP-251B(179)3P | MuskogeeDivision 1 | US-62 (SH-16) | Resurface (Asphalt) US-62 (SH-16) : FROM 0.378 MILES EAST OF THE US-64 (SH-72) INTERSECTION, EXTEND EAST NEAR MUSKOGEE. | $2,164,351 | Let | APAC-CENTRAL, INC. $1,785,929 · -17.5% | |
| May 15, 2025 | 250076 STP-256B(091)AD | OkmulgeeDivision 1 | SH-56 (W. 6TH STREET) | Pedestrian Improvements (Sidewalk) SH-56 (W. 6TH STREET): FROM 1.35 MILES WEST OF US-75, EXTEND EAST IN OKMULGEE. | $652,033 | Let | R & L Construction, LLC $509,901 · -21.8% | |
| Jun 12, 2025 | 250086 SSP-251F(183)PM | McintoshMuskogeeOkmulgeeSequoyahDivision 1 | SH-101SH-72US-266US-75 | Bridge Waterproof Seal US-75/US-266/SH-72/SH-101: OVER ELK CREEK, SH-16, COAL CREEK, BIG SKIN BAYOU, AND UNNAMED CREEK AT MULTIPLE LOCATIONS IN DISTRICT I. | $89,727 | Let | GARY A. CRAIN, INC. $81,103 · -9.6% | |
| Jun 19, 2025 | 250082 STP-231C(059)3P | HaskellDivision 1 | SH-71 | Resurface (Asphalt) SH-71: FROM THE INTERSECTION OF SH-9, EXTEND NORTH NEAR WHITEFIELD. | — | Let | Robinson Construction, LLC $1,562,054 · | |
| Jul 10, 2025 | 250178 STP-246C(069)PM | McintoshDivision 1 | US-69B | Pavement Rehabilitation US-69B: FROM 0.20 MILES NORTH OF THE SH-9/US-69B INTERSECTION | $2,332,891 | Let | C3 Construction, Inc. $2,243,044 · -3.9% | |
| Aug 7, 2025 | 250204 SBR-4000(206)SB | SequoyahDivision 1 | I-40 | Bridge Rehabilitation I-40: OVER COUNTY ROAD NS 4670 | $1,420,825 | Let | B & B CONSTRUCTION SERVICE J.T., INC. $1,341,159 · -5.6% | |
| Aug 14, 2025 | 250216 STP-256F(114)3B | OkmulgeeSequoyahDivision 1 | I-40SH-82 | Joint Seal/Repair I-40/ SH-82: OVER BNSF RR | $574,647 | Let | Built Right Construction, LLC $524,867 · -8.7% | |
| Sep 11, 2025 | 250237 NHPP-014N(150)PM | OkmulgeeDivision 1 | US-75 | Interchange US-75: AT THE INTERSECTION OF PRESTON ROAD (WILL SAMPSON ROAD), 2.3 MILES SOUTH OF SH-16 IN PRESTON. | — | Let | ||
| Sep 18, 2025 | 250145 STP-249C(068)PM | CherokeeMayesDivision 1 | SH-82 | Grade, Drain, And Surface SH-82: FROM THE CHEROKEE COUNTY LINE, EXTEND NORTH NEAR LOCUST GROVE. | — | Let | ||
| Sep 18, 2025 | 250260 STP-251C(193)PM | MuskogeeDivision 1 | SH-71 | Bridge And Approaches SH-71: OVER BELLE STAR CREEK, 5.36 MILES SOUTHWEST OF THE SH-2 INTERSECTION NEAR THE EUFAULA DAM. | $3,560,784 | Let | Lopp Construction, LLC $2,536,981 · -28.8% | |
| Oct 9, 2025 | 250153 STP-211C(102)PM | CherokeeDivision 1 | SH-80 | Grade, Drain, Bridge, And Surface SH-80: FROM 0.85 MILES SOUTH OF SH-51, EXTEND NORTH NEAR HULBERT. | $10,733,956 | Let | SHERWOOD CONSTRUCTION CO., INC. $9,033,492 · -15.8% | |
| Oct 9, 2025 | 250271 STP-231D(055)CI | HaskellDivision 1 | COUNTY ROAD (NS-444) | Bridge And Approaches COUNTY ROAD (NS-444): OVER SAN BOIS CREEK, 4.29 MILES NORTH OF THE SH-31/SH-82 INTERSECTION NEAR LEQUIRE. | $1,145,523 | Let | K & R BUILDERS, INC. $1,179,729 · +3.0% | |
| Oct 9, 2025 | 250274 HSIPG-240F(126)TR | CherokeeLatimerLefloreMccurtain+4 moreDivision 1 | INTERSTATESTATE HWYUS HWY | Safety Improvement (Guardrail) INTERSTATE/US HWY/STATE HWY: AT MULTIPLE LOCATIONS IN DISTRICT I AND II. | $2,078,860 | Let | ACTION SAFETY SUPPLY CO., LLC $1,486,467 · -28.5% | |
| Oct 9, 2025 | 250275 BRO-240F(132)CB | HaskellLeflorePushmatahaDivision 1 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT I AND DISTRICT II. | $565,122 | Let | PBX Corporation $691,804 · +22.4% | |
| Oct 9, 2025 | 250279 SBR-251B(186)SB | MuskogeeDivision 1 | SH-16 | Bridge Rehabilitation SH-16: OVER ARKANSAS RIVER, 1.7 MILES NORTH OF THE US-69 JUNCTION NEAR MUSKOGEE. | $1,109,770 | Let | LOGOS CONSTRUCTION CO., LLC $899,510 · -18.9% | |
| Oct 9, 2025 | 250280 BRO-251F(190)CB | McintoshMuskogeeOkmulgeeWagonerDivision 1 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT I. | $496,365 | Let | PBX Corporation $295,913 · -40.4% | |
| Oct 9, 2025 | 250346 E-SAP-251B(199)ES | MuskogeeDivision 1 | SH-165 | Bridge Repair SH-165: REPAIR VEHICLE IMPACT DAMAGE OVER CHANDLER STREET, 2.1 MILES SOUTH OF THE US-62 INTERCHANGE IN MUSKOGEE. | — | Let | K & R BUILDERS, INC. $408,483 · | |
| Oct 16, 2025 | 250301 BRO-240F(131)CB | HaskellLefloreDivision 1 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT I AND DISTRICT II. | $99,196 | Let | PBX Corporation $212,237 · +114.0% | |
| Oct 16, 2025 | 250302 BRO-249F(093)CB / BRO-249F(094)CB | CherokeeDelawareMayesDivision 1 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT I AND DISTRICT VIII. | $1,081,465 | Let | Built Right Construction, LLC $587,370 · -45.7% | |
| Oct 16, 2025 | 250303 SBR-NBIP(549)SB | McintoshDivision 1 | COUNTY ROAD (N4190) | Bridge Painting COUNTY ROAD (N4190): OVER I-40, 0.73 MILES WEST OF THE I-40 / US-69 INTERCHANGE NEAR CHECOTAH. | $363,456 | Let | JK INDUSTRIES, INC. $219,795 · -39.5% | |
| Oct 16, 2025 | 250306 BRO-256F(109)CB | McintoshMuskogeeOkmulgeeDivision 1 | COUNTY ROADS | Bridge Repair COUNTY ROADS: AT MULTIPLE LOCATIONS IN DISTRICT I. | — | Let | K & R BUILDERS, INC. $497,424 · | |
| Nov 13, 2025 | 250354 NHPP-014N(150)PM | OkmulgeeDivision 1 | US-75 | Interchange US-75: AT THE INTERSECTION OF PRESTON ROAD (WILL SAMPSON ROAD), 2.3 MILES SOUTH OF SH-16 IN PRESTON. | $11,967,145 | Let | SHERWOOD CONSTRUCTION CO., INC. $11,121,868 · -7.1% | |
| Nov 20, 2025 | 250352 STP-249C(068)PM | CherokeeMayesDivision 1 | SH-82 | Grade, Drain, And Surface SH-82: FROM THE CHEROKEE COUNTY LINE, EXTEND NORTH NEAR LOCUST GROVE. | $18,976,851 | Let | Robinson Construction, LLC $15,440,915 · -18.6% | |
| Dec 11, 2025 | 250350 MU-MC-51B | WagonerDivision 1 | MUSKOGEE TURNPIKE (SH-351) | Pavement Rehabilitation MUSKOGEE TURNPIKE (SH-351): FROM 6.3 MILES SOUTHEAST OF THE SH-51 INTERCHANGE, EXTEND SOUTHEAST NEAR MUSKOGEE. | — | Let | EMERY SAPP & SONS, INC. $6,965,142 · |
1–34 of 34
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.