Pedestrian Improvements (Sidewalk)
- Let date
- Thursday, January 16, 2025
- Contract
- 240160 · job page
- J/P numbers
- 35446(04)
- District
- Division 1
- County
- Wagoner
- Highway
- CITY STREET (E. PECAN STREET)
- Limits
- CITY STREET (E. PECAN STREET): FROM SH-72, EXTEND EAST IN COWETA.
- Classification
- Pedestrian Improvements (Sidewalk) ·
- Project number
- TAP-273D(099)IG
- Working days
- 150
Bidders 9
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | $563,889 | | |
| 1 |
R & L Construction, LLC Low bidder |
$517,138 |
-8.3% |
|
| 2 |
Grade Line Construction, LLC |
$573,512 |
+1.7% |
+10.9% |
| 3 |
Rosscon, LLC |
$579,689 |
+2.8% |
+12.1% |
| 4 |
Treas Construction Inc |
$619,560 |
+9.9% |
+19.8% |
| 5 |
RUDY CONSTRUCTION CO. |
$698,847 |
+23.9% |
+35.1% |
| 6 |
SCHIRALLI CONSTRUCTION CORP. |
$777,246 |
+37.8% |
+50.3% |
| 7 |
BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
$787,769 |
+39.7% |
+52.3% |
| 8 |
Built Right Construction, LLC |
$859,619 |
+52.4% |
+66.2% |
| 9 |
C3 Construction, Inc. |
$1,142,158 |
+102.6% |
+120.9% |
Bid tab: unit prices 47 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 R & L Construct… | #2 Grade Line Cons… | #3 Rosscon, LLC | #4 Treas Construct… | #5 RUDY CONSTRUCTI… | #6 SCHIRALLI CONST… | #7 BRIGHT LIGHTING… | #8 Built Right Con… |
| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$12,000.00 |
$30,000.00 |
$38,500.00 |
$15,000.00 |
$10,369.16 |
$12,059.61 |
$10,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 137 | CY |
$10.00 |
$25.00 |
$35.00 |
$22.00 |
$16.50 |
$35.00 |
$119.58 |
$88.03 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 195 | CY |
$15.00 |
$25.00 |
$45.00 |
$35.00 |
$40.37 |
$50.00 |
$132.38 |
$93.27 |
$20.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 3,367 | LF |
$4.00 |
$2.50 |
$3.00 |
$3.50 |
$2.47 |
$5.00 |
$2.75 |
$2.44 |
$6.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 33 | LF |
$15.00 |
$20.00 |
$20.00 |
$10.00 |
$20.84 |
$15.00 |
$8.80 |
$15.22 |
$30.00 |
| 60 | 221(G)2800 |
TEMPORARY FIBER LOG | 112 | LF |
$20.00 |
$6.25 |
$6.00 |
$10.00 |
$6.54 |
$5.00 |
$5.50 |
$3.99 |
$10.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 2,246 | SY |
$7.50 |
$9.50 |
$6.50 |
$6.00 |
$9.84 |
$7.50 |
$4.95 |
$11.08 |
$6.00 |
| 80 | 233(A)0200 |
VEGETATIVE MULCHING | 0.2 | AC |
$1,200.00 |
$1,500.00 |
$1,250.00 |
$5,000.00 |
$1,375.00 |
$8,500.00 |
$1,320.00 |
$1,392.50 |
$2,500.00 |
| 90 | 303(A)1200 |
AGGREGATE BASE TYPE A | 187 | CY |
$115.00 |
$60.00 |
$110.00 |
$60.00 |
$153.48 |
$85.00 |
$124.74 |
$112.78 |
$55.00 |
| 100 | 407(B)7300 |
TACK COAT | 43 | GAL |
$5.00 |
$10.00 |
$15.00 |
$3.50 |
$5.50 |
$8.00 |
$19.18 |
$11.14 |
$6.00 |
| 110 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 95 | TON |
$115.00 |
$135.00 |
$250.00 |
$150.00 |
$246.85 |
$250.00 |
$325.93 |
$249.07 |
$150.00 |
| 120 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 64 | TON |
$115.00 |
$145.00 |
$265.00 |
$150.00 |
$263.62 |
$350.00 |
$453.36 |
$281.85 |
$150.00 |
| 130 | 509(D)0500 |
CLASS C CONCRETE | 20 | CY |
$450.00 |
$500.00 |
$600.00 |
$450.00 |
$495.00 |
$650.00 |
$757.96 |
$803.50 |
$1,000.00 |
| 140 | 609(C)4400 |
CONCRETE HEADER CURB (6"X 16") | 155 | LF |
$35.00 |
$30.00 |
$60.00 |
$50.00 |
$38.50 |
$30.00 |
$86.91 |
$93.37 |
$55.00 |
| 150 | 610(A)5200 |
4" CONCRETE SIDEWALK | 2,433 | SY |
$70.00 |
$65.00 |
$81.00 |
$70.00 |
$68.75 |
$100.00 |
$91.08 |
$117.01 |
$125.00 |
| 160 | 610(B)5300 |
6" CONCRETE DRIVEWAY (H.E.S.) | 189 | SY |
$80.00 |
$95.00 |
$110.00 |
$100.00 |
$81.40 |
$115.00 |
$184.61 |
$316.49 |
$200.00 |
| 170 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 160 | SF |
$35.00 |
$35.00 |
$40.00 |
$40.00 |
$38.50 |
$50.00 |
$47.53 |
$48.66 |
$50.00 |
| 180 | 611(G)7700 |
SPECIAL INLET DRAIN | 8 | EA |
$6,000.00 |
$4,150.00 |
$2,000.00 |
$6,000.00 |
$6,600.00 |
$5,000.00 |
$2,205.87 |
$3,391.77 |
$13,500.00 |
| 190 | 613(A)5216 |
24" R.C.PIPE CLASS III | 20 | LF |
$50.00 |
$100.00 |
$130.00 |
$125.00 |
$100.11 |
$130.00 |
$176.01 |
$340.76 |
$300.00 |
| 200 | 613(A)5236 |
54" R.C.PIPE CLASS III | 18 | LF |
$70.00 |
$500.00 |
$450.00 |
$370.00 |
$313.85 |
$500.00 |
$664.17 |
$855.65 |
$400.00 |
| 210 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$750.00 |
$1,500.00 |
$1,600.00 |
$2,500.00 |
$2,679.97 |
$2,500.00 |
$2,412.96 |
$2,945.66 |
$2,200.00 |
| 220 | 613(L)6740 |
54" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$800.00 |
$5,000.00 |
$9,500.00 |
$6,500.00 |
$9,218.32 |
$10,000.00 |
$8,092.51 |
$12,268.30 |
$20,000.00 |
| 230 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$4,000.00 |
$20,000.00 |
$22,000.00 |
$15,000.00 |
$13,825.55 |
$9,044.71 |
$25,000.00 |
| 240 | 619(B)6356 |
REMOVAL OF CURB AND GUTTER | 7 | LF |
$10.00 |
$10.00 |
$20.00 |
$10.00 |
$22.00 |
$20.00 |
$19.00 |
$172.28 |
$15.00 |
| 250 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 71 | SY |
$10.00 |
$25.00 |
$20.00 |
$25.00 |
$13.20 |
$20.00 |
$38.12 |
$84.93 |
$15.00 |
| 260 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 518 | SY |
$10.00 |
$25.00 |
$15.00 |
$15.00 |
$13.20 |
$20.00 |
$20.90 |
$34.92 |
$15.00 |
| 270 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 124 | SY |
$10.00 |
$15.00 |
$15.00 |
$10.00 |
$13.20 |
$20.00 |
$15.85 |
$24.31 |
$15.00 |
| 280 | 619(B)6404 |
REMOVAL OF SIDEWALK | 486 | SY |
$10.00 |
$15.00 |
$15.00 |
$15.00 |
$13.20 |
$20.00 |
$16.18 |
$49.63 |
$15.00 |
| 290 | 619(C)6600 |
SAWING PAVEMENT | 993 | LF |
$7.00 |
$10.00 |
$7.00 |
$5.00 |
$11.00 |
$5.00 |
$6.69 |
$3.06 |
$15.00 |
| 300 | 622(A)0200 |
PIPE RAILING | 10 | LF |
$200.00 |
$300.00 |
$325.00 |
$325.00 |
$137.50 |
$250.00 |
$355.22 |
$459.06 |
$750.00 |
| 310 | 625(B)4300 |
REMOVE AND RECONSTRUCT FENCE | 8 | LF |
$50.00 |
$200.00 |
$65.00 |
$350.00 |
$110.00 |
$150.00 |
$1,037.85 |
$188.43 |
$50.00 |
| 320 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
| 330 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,140 | SD |
$0.7500 |
$0.1500 |
$1.25 |
$0.1100 |
$1.37 |
$0.0500 |
$0.1100 |
$0.1100 |
$1.25 |
| 340 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,623 | SD |
$1.25 |
$0.1500 |
$1.25 |
$0.1100 |
$1.37 |
$0.0500 |
$0.1100 |
$0.1100 |
$1.25 |
| 350 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 3,450 | SD |
$2.50 |
$0.1500 |
$0.0500 |
$0.1100 |
$0.0500 |
$0.0500 |
$0.1100 |
$0.1100 |
$0.0500 |
| 370 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 6,210 | SD |
$0.1500 |
$0.1500 |
$0.0500 |
$0.1100 |
$0.0500 |
$0.0500 |
$0.1100 |
$0.1100 |
$0.0500 |
| 380 | 880(G)6805 |
CHANNELIZER CONES | 30,533 | SD |
$0.7500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0500 |
$0.0400 |
$0.0400 |
$0.0500 |
| 390 | 880(I)7000 |
FLAGGER | 75 | SD |
$100.00 |
$200.00 |
$100.00 |
$350.00 |
$55.00 |
$300.00 |
$540.00 |
$288.56 |
$5.00 |
| 400 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$20.00 |
$10.50 |
$30.00 |
$11.00 |
$33.00 |
$45.00 |
$11.00 |
$45.49 |
$30.00 |
| 410 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$25.00 |
$52.50 |
$275.00 |
$55.00 |
$275.00 |
$65.00 |
$55.00 |
$55.70 |
$500.00 |
| 420 | 836 7100 |
REGULATORY OR WARNING SIGN ASSEMBLY | 2 | EA |
$10,500.00 |
$8,925.00 |
$10,000.00 |
$9,350.00 |
$8,250.00 |
$15,000.00 |
$9,350.00 |
$14,621.49 |
$12,000.00 |
| 430 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 33 | SF |
$25.00 |
$36.75 |
$22.00 |
$38.50 |
$22.00 |
$30.00 |
$38.50 |
$38.99 |
$30.00 |
| 440 | 851(C)2415 |
2" SQUARE TUBE POST | 12 | LF |
$10.00 |
$12.60 |
$16.00 |
$11.00 |
$16.50 |
$70.00 |
$11.00 |
$11.14 |
$25.00 |
| 450 | 856(A)8218 |
(SP) TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 412 | LF |
$20.00 |
$24.10 |
$20.00 |
$25.30 |
$19.80 |
$35.00 |
$25.30 |
$25.62 |
$25.00 |
| 460 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$13,000.00 |
$12,750.00 |
$20,000.00 |
$18,810.00 |
$7,500.00 |
$14,537.19 |
$14,203.73 |
$25,000.00 |
| 470 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$1,350.00 |
$5,000.00 |
$5,500.00 |
$2,500.00 |
$5,532.63 |
$1,519.12 |
$5,000.00 |
| 480 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$44,000.00 |
$56,000.00 |
$45,000.00 |
$48,024.12 |
$57,500.00 |
$113,666.52 |
$18,291.38 |
$80,000.00 |
Showing the first 8 bidders. The Excel and CSV downloads include all 9.