| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 10 | CY |
$15.00 |
$100.00 |
$25.00 |
$15.97 |
$28.66 |
$150.00 |
$55.00 |
$30.00 |
$323.42 |
| 20 | 221(B)2300 |
TEMPORARY SILT FENCE | 800 | LF |
$4.00 |
$6.75 |
$4.00 |
$6.23 |
$6.00 |
$4.80 |
$5.95 |
$4.00 |
$6.55 |
| 30 | 230(A)7200 |
SOLID SLAB SODDING | 400 | SY |
$20.00 |
$11.25 |
$5.00 |
$10.37 |
$10.00 |
$24.00 |
$9.95 |
$11.00 |
$10.95 |
| 40 | 233(A)0200 |
VEGETATIVE MULCHING | 0.5 | AC |
$6,000.00 |
$10,000.00 |
$2,000.00 |
$940.06 |
$9,100.00 |
$6,000.00 |
$9,000.00 |
$500.00 |
$9,900.00 |
| 50 | 408 8100 |
PRIME COAT | 505 | GAL |
$20.00 |
$4.55 |
$5.00 |
$4.19 |
$7.05 |
$4.00 |
$4.00 |
$4.00 |
$4.40 |
| 60 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 323 | TON |
$200.00 |
$153.00 |
$200.00 |
$141.13 |
$176.02 |
$135.00 |
$135.00 |
$135.00 |
$148.50 |
| 70 | 412 3100 |
COLD MILLING PAVEMENT | 1,947 | SY |
$8.00 |
$14.00 |
$25.00 |
$14.96 |
$26.12 |
$12.20 |
$12.00 |
$10.20 |
$19.89 |
| 80 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 880 | SY |
$10.00 |
$11.00 |
$15.00 |
$17.87 |
$19.37 |
$25.71 |
$12.00 |
$5.00 |
$16.08 |
| 90 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 2,339 | LF |
$6.00 |
$3.00 |
$11.00 |
$8.18 |
$4.84 |
$4.00 |
$4.00 |
$2.00 |
$4.40 |
| 100 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,775 | LF |
$35.00 |
$31.64 |
$30.00 |
$22.94 |
$33.90 |
$28.00 |
$28.00 |
$32.40 |
$30.80 |
| 110 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$3,000.00 |
$3,300.00 |
$4,500.00 |
$3,791.16 |
$3,571.86 |
$2,950.00 |
$2,950.00 |
$4,650.00 |
$3,245.00 |
| 120 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 12 | EA |
$3,500.00 |
$3,300.00 |
$20.00 |
$3,378.23 |
$3,571.86 |
$2,950.00 |
$2,950.00 |
$3,840.00 |
$3,245.00 |
| 130 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 53 | EA |
$20.00 |
$22.50 |
$20.00 |
$16.06 |
$24.22 |
$20.00 |
$20.00 |
$30.00 |
$22.00 |
| 140 | 501(G)1800 |
CLSM BACKFILL | 70 | CY |
$250.00 |
$304.46 |
$400.00 |
$280.37 |
$216.67 |
$333.00 |
$530.00 |
$310.00 |
$304.90 |
| 150 | 504(A)5200 |
APPROACH SLAB | 183 | SY |
$275.00 |
$307.55 |
$350.00 |
$276.91 |
$311.63 |
$415.00 |
$475.00 |
$320.00 |
$519.79 |
| 160 | 504(B)5300 |
SAW-CUT GROOVING | 612 | SY |
$6.00 |
$6.82 |
$10.00 |
$6.48 |
$7.51 |
$6.20 |
$6.20 |
$7.25 |
$6.82 |
| 170 | 504(E)5520 |
42" F-SHAPED PARAPET | 283 | LF |
$150.00 |
$181.46 |
$135.00 |
$177.18 |
$219.42 |
$169.50 |
$315.00 |
$420.00 |
$243.95 |
| 180 | 505(A)6210 |
BRIDGE DECK CONCRETE OVERLAY | 54 | CY |
$850.00 |
$1,192.76 |
$1,200.00 |
$1,292.73 |
$1,458.62 |
$1,220.00 |
$1,700.00 |
$920.00 |
$2,471.13 |
| 190 | 505(E)6600 |
HYDRODEMOLITION | 477 | SY |
$160.00 |
$175.00 |
$200.00 |
$90.89 |
$131.88 |
$165.00 |
$180.00 |
$78.25 |
$205.92 |
| 200 | 509(A)0210 |
CLASS AA CONCRETE | 1 | CY |
$1,000.00 |
$2,000.00 |
$1,000.00 |
$2,214.42 |
$3,418.40 |
$5,500.00 |
$500.00 |
$2,500.00 |
$5,574.46 |
| 210 | 509(D)0510 |
CLASS C CONCRETE | 5 | CY |
$800.00 |
$1,000.00 |
$850.00 |
$1,339.79 |
$714.18 |
$1,655.00 |
$2,800.00 |
$2,500.00 |
$1,919.77 |
| 220 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 7,550 | LB |
$2.00 |
$3.05 |
$2.00 |
$2.35 |
$1.58 |
$6.71 |
$3.50 |
$4.10 |
$2.42 |
| 230 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$425.00 |
$394.52 |
$350.00 |
$578.57 |
$161.21 |
$330.00 |
$265.00 |
$620.00 |
$960.71 |
| 240 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 136.8 | SY |
$8.00 |
$6.00 |
$5.00 |
$6.28 |
$7.26 |
$8.26 |
$10.00 |
$7.50 |
$6.60 |
| 250 | 517 9110 |
ELASTOMERIC COATING | 212 | SF |
$20.00 |
$21.00 |
$30.00 |
$16.76 |
$19.37 |
$30.20 |
$15.00 |
$19.20 |
$17.60 |
| 260 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 360 | LF |
$30.00 |
$23.00 |
$35.00 |
$22.94 |
$22.00 |
$46.25 |
$16.00 |
$26.40 |
$38.31 |
| 270 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$40.00 |
$44.00 |
$35.00 |
$41.79 |
$40.00 |
$71.00 |
$18.00 |
$48.00 |
$44.00 |
| 280 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$100.00 |
$140.00 |
$150.00 |
$130.66 |
$151.35 |
$50.00 |
$175.00 |
$150.00 |
$137.50 |
| 290 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$900.00 |
$700.00 |
$1,000.00 |
$757.03 |
$735.00 |
$1,375.00 |
$850.00 |
$8,845.00 |
$797.50 |
| 300 | 523(A)3200 |
SEALER CRACK PREPARATION | 427 | LF |
$6.00 |
$3.00 |
$4.00 |
$5.24 |
$6.05 |
$7.10 |
$2.50 |
$6.05 |
$5.50 |
| 310 | 523(B)3300 |
SEALER RESIN | 6 | GAL |
$100.00 |
$40.00 |
$135.00 |
$193.00 |
$224.00 |
$50.00 |
$35.00 |
$229.00 |
$203.50 |
| 320 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$50.00 |
$40.00 |
$60.00 |
$39.70 |
$46.01 |
$54.00 |
$25.00 |
$46.74 |
$41.80 |
| 330 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 10 | TON |
$80.00 |
$150.00 |
$85.00 |
$92.60 |
$128.39 |
$254.00 |
$300.00 |
$350.00 |
$274.91 |
| 340 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 20 | SY |
$20.00 |
$60.00 |
$65.00 |
$40.13 |
$52.46 |
$195.00 |
$32.00 |
$150.00 |
$34.22 |
| 350 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$75,000.00 |
$44,662.52 |
$5,000.00 |
$92,415.88 |
$57,333.21 |
$65,000.00 |
$74,000.00 |
$45,000.00 |
$197,920.70 |
| 360 | 501(G)1800 |
CLSM BACKFILL | 70 | CY |
$250.00 |
$304.46 |
$400.00 |
$280.37 |
$216.67 |
$333.00 |
$530.00 |
$310.00 |
$304.90 |
| 370 | 504(A)5200 |
APPROACH SLAB | 183 | SY |
$275.00 |
$307.55 |
$350.00 |
$276.91 |
$312.03 |
$415.00 |
$475.00 |
$320.00 |
$463.39 |
| 380 | 504(B)5300 |
SAW-CUT GROOVING | 612 | SY |
$6.00 |
$6.82 |
$10.00 |
$6.48 |
$7.51 |
$6.20 |
$6.20 |
$7.75 |
$6.82 |
| 390 | 504(E)5520 |
42" F-SHAPED PARAPET | 283 | LF |
$150.00 |
$181.46 |
$135.00 |
$177.18 |
$218.18 |
$169.50 |
$315.00 |
$420.00 |
$243.95 |
| 400 | 505(A)6210 |
BRIDGE DECK CONCRETE OVERLAY | 67 | CY |
$850.00 |
$1,021.71 |
$1,200.00 |
$1,100.02 |
$1,486.16 |
$1,220.00 |
$1,700.00 |
$920.00 |
$2,159.17 |
| 410 | 505(E)6600 |
HYDRODEMOLITION | 477 | SY |
$160.00 |
$175.00 |
$200.00 |
$90.89 |
$119.17 |
$165.00 |
$180.00 |
$82.55 |
$187.79 |
| 420 | 509(A)0210 |
CLASS AA CONCRETE | 1 | CY |
$1,000.00 |
$2,000.00 |
$1,000.00 |
$2,214.42 |
$3,418.40 |
$5,500.00 |
$500.00 |
$2,500.00 |
$10,588.05 |
| 430 | 509(D)0510 |
CLASS C CONCRETE | 5 | CY |
$800.00 |
$1,000.00 |
$850.00 |
$1,339.79 |
$719.31 |
$1,655.00 |
$2,800.00 |
$2,500.00 |
$2,904.09 |
| 440 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 7,550 | LB |
$2.00 |
$3.05 |
$2.00 |
$2.35 |
$1.57 |
$6.71 |
$3.50 |
$4.10 |
$2.42 |
| 450 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$425.00 |
$394.52 |
$350.00 |
$578.57 |
$77.69 |
$330.00 |
$265.00 |
$620.00 |
$805.37 |
| 460 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 136.8 | SY |
$8.00 |
$6.00 |
$5.00 |
$6.28 |
$7.26 |
$8.26 |
$10.00 |
$7.50 |
$6.60 |
| 470 | 517 9110 |
ELASTOMERIC COATING | 212 | SF |
$20.00 |
$21.00 |
$30.00 |
$16.76 |
$19.37 |
$30.20 |
$15.00 |
$19.20 |
$43.92 |
| 480 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 360 | LF |
$30.00 |
$23.00 |
$35.00 |
$22.94 |
$43.48 |
$46.25 |
$16.00 |
$26.40 |
$34.62 |
| 490 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$40.00 |
$44.00 |
$35.00 |
$41.79 |
$48.43 |
$71.00 |
$18.00 |
$48.00 |
$44.00 |
| 500 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 1 | GAL |
$100.00 |
$140.00 |
$150.00 |
$130.66 |
$151.35 |
$50.00 |
$175.00 |
$150.00 |
$137.50 |
| 510 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$900.00 |
$700.00 |
$1,000.00 |
$757.03 |
$735.00 |
$1,375.00 |
$850.00 |
$8,845.00 |
$797.50 |
| 520 | 523(A)3200 |
SEALER CRACK PREPARATION | 427 | LF |
$6.00 |
$3.00 |
$4.00 |
$5.24 |
$6.05 |
$7.10 |
$2.50 |
$6.05 |
$5.50 |
| 530 | 523(B)3300 |
SEALER RESIN | 6 | GAL |
$100.00 |
$40.00 |
$135.00 |
$193.00 |
$224.00 |
$50.00 |
$35.00 |
$229.00 |
$203.50 |
| 540 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$50.00 |
$40.00 |
$60.00 |
$39.70 |
$46.01 |
$54.00 |
$25.00 |
$46.74 |
$41.80 |
| 550 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 10 | TON |
$80.00 |
$150.00 |
$85.00 |
$92.60 |
$135.66 |
$254.00 |
$300.00 |
$350.00 |
$432.86 |
| 560 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 20 | SY |
$20.00 |
$60.00 |
$65.00 |
$40.13 |
$37.07 |
$195.00 |
$32.00 |
$150.00 |
$68.06 |
| 570 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$75,000.00 |
$44,662.52 |
$5,000.00 |
$92,415.88 |
$72,000.00 |
$65,000.00 |
$74,000.00 |
$65,000.00 |
$180,717.37 |
| 580 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 8,600 | LF |
$2.00 |
$2.00 |
$3.20 |
$2.79 |
$2.42 |
$2.00 |
$2.00 |
$2.10 |
$2.20 |
| 590 | 857(E)9620 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-1 | 600 | EA |
$2.00 |
$1.00 |
$0.0100 |
$1.05 |
$1.21 |
$1.00 |
$1.00 |
$1.20 |
$1.10 |
| 600 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 4,630 | LF |
$1.50 |
$0.3500 |
$1.25 |
$1.05 |
$0.4200 |
$0.3500 |
$0.3500 |
$0.2400 |
$0.3900 |
| 610 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 480 | SD |
$20.00 |
$15.00 |
$20.00 |
$20.85 |
$18.16 |
$15.00 |
$15.00 |
$12.00 |
$16.50 |
| 620 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 60 | SD |
$50.00 |
$15.00 |
$12.00 |
$12.57 |
$18.16 |
$15.00 |
$15.00 |
$18.00 |
$16.50 |
| 630 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,550 | LF |
$35.00 |
$25.00 |
$25.00 |
$22.24 |
$34.91 |
$15.00 |
$45.00 |
$55.00 |
$40.08 |
| 640 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,550 | LF |
$10.00 |
$3.00 |
$6.00 |
$5.24 |
$3.24 |
$3.00 |
$4.00 |
$55.00 |
$6.97 |
| 650 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 480 | SD |
$20.00 |
$8.00 |
$2.00 |
$2.09 |
$9.69 |
$8.00 |
$8.00 |
$18.00 |
$8.80 |
| 660 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,960 | SD |
$0.8000 |
$0.5000 |
$0.0500 |
$0.0500 |
$0.6100 |
$0.5000 |
$0.5000 |
$0.1200 |
$0.5500 |
| 670 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,400 | SD |
$1.20 |
$1.50 |
$1.00 |
$1.05 |
$1.82 |
$1.50 |
$1.50 |
$1.20 |
$1.65 |
| 680 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 17,760 | SD |
$1.80 |
$1.50 |
$0.0200 |
$0.0200 |
$1.82 |
$1.50 |
$1.50 |
$0.1200 |
$1.65 |
| 690 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 1,920 | SD |
$3.00 |
$1.50 |
$9.50 |
$9.92 |
$1.82 |
$1.50 |
$1.50 |
$1.80 |
$1.65 |
| 700 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 22,560 | SD |
$0.8000 |
$0.0500 |
$1.65 |
$1.75 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.1200 |
$0.0600 |
| 705 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 32,640 | SD |
$0.8000 |
$0.2500 |
$0.0200 |
$0.0200 |
$0.3000 |
$0.2500 |
$0.2500 |
$0.1200 |
$0.2800 |
| 710 | 880(F)6700 |
DRUMS | 32,640 | SD |
$0.7000 |
$0.4000 |
$0.0200 |
$0.0200 |
$0.4800 |
$0.4000 |
$0.4000 |
$0.1200 |
$0.4400 |
| 720 | 880(I)7000 |
FLAGGER | 30 | SD |
$250.00 |
$250.00 |
$5.00 |
$1,168.36 |
$187.88 |
$115.00 |
$400.00 |
$50.00 |
$571.34 |
| 730 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$20.00 |
$30.00 |
$21.00 |
$21.94 |
$36.32 |
$30.00 |
$30.00 |
$18.00 |
$33.00 |
| 740 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 25 | SF |
$100.00 |
$25.00 |
$155.00 |
$141.13 |
$30.27 |
$25.00 |
$25.00 |
$60.00 |
$27.50 |
| 750 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 24 | LF |
$15.00 |
$15.00 |
$10.00 |
$7.33 |
$18.16 |
$15.00 |
$15.00 |
$14.45 |
$16.50 |
| 760 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 9,176 | LF |
$2.00 |
$0.8500 |
$2.00 |
$1.65 |
$1.03 |
$0.8500 |
$0.8500 |
$1.80 |
$0.9400 |
| 770 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 50 | LF |
$2.25 |
$3.00 |
$3.80 |
$3.29 |
$3.63 |
$3.00 |
$3.00 |
$24.00 |
$3.30 |
| 780 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$6,780.00 |
$8,500.00 |
$14,983.73 |
$7,970.97 |
$5,500.00 |
$4,000.00 |
$35,000.00 |
$8,690.00 |
| 790 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$125,000.00 |
$130,000.00 |
$92,405.90 |
$95,000.00 |
$98,988.22 |
$176,166.60 |
$117,900.00 |
$150,051.44 |