(15B-1)BP,BRR;(14HB-1)BRR
- Let date
- Friday, June 13, 2025
- Contract
- 68E44
- District
- District 4
- County
- Peoria, Tazewell
- Highway
- Classification
- ·
- Project number
Bidders 2
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | William Charles Construction Company, LLC Low bidder | $69,915,000 | ||
| 2 | ICC Group Inc. | $73,694,000 | +5.4% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 William Charles… | #2 ICC Group Inc. |
|---|---|---|---|---|---|---|---|
| 1 | X0322559 | BOLT REPLACEMENT | 65 | EACH | $700.00 | $560.00 | |
| 2 | X0322938 | TEMPORARY END SECTION | 1 | EACH | $3,200.00 | $2,871.00 | |
| 3 | X0325734 | SLOTTED DRAIN REMOVAL | 244 | FOOT | $160.00 | $60.00 | |
| 4 | X0325941 | ACCESS LADDER | 5 | EACH | $15,300.00 | $28,750.00 | |
| 5 | X0327739 | MISC ELECTRICAL WORK | 1 | L SUM | $49,337.75 | $49,337.75 | |
| 6 | X2840110 | FILTER MATTRESS | 2,420 | SQ YD | $485.00 | $475.00 | |
| 7 | X4401198 | HMA SURF REM VAR DP | 929 | SQ YD | $23.74 | $23.74 | |
| 8 | X5030250 | BR DECK GROOVING LONG | 19,921 | SQ YD | $7.40 | $4.69 | |
| 9 | X5051204 | STRUCTURAL STL REMOVL | 27,760 | POUND | $1.00 | $7.75 | |
| 10 | X5051206 | STRUCT STEEL REPAIR | 113,210 | POUND | $5.10 | $35.00 | |
| 11 | X5060601 | C&D N-LEAD PT C RS N1 | 1 | L SUM | $48,500.00 | $48,000.00 | |
| 12 | X5060602 | C&D N-LEAD PT C RS N2 | 1 | L SUM | $561,200.00 | $555,589.96 | |
| 13 | X5080530 | BAR TERMINATORS | 1,101 | EACH | $30.10 | $33.49 | |
| 14 | X5211610 | HLMRB DISC G EXP 200K | 30 | EACH | $8,200.00 | $17,500.00 | |
| 15 | X5211625 | HLMRB DISC G EXP 500K | 2 | EACH | $11,000.00 | $30,500.00 | |
| 16 | X5211630 | HLMRB DISC G EXP 600K | 19 | EACH | $11,500.00 | $27,500.00 | |
| 17 | X5211645 | HLMRB DISC G EXP 900K | 2 | EACH | $13,300.00 | $32,500.00 | |
| 18 | X5211655 | HLMRB DISC G EXP 1250K | 4 | EACH | $21,400.00 | $27,500.00 | |
| 19 | X5211660 | HLMRB DISC G EXP 1500K | 2 | EACH | $17,500.00 | $38,500.00 | |
| 20 | X5211665 | HLMRB DISC G EXP 1750K | 2 | EACH | $17,500.00 | $37,500.00 | |
| 21 | X5230152 | CLEAN DRAINAGE SYSTEM | 1 | L SUM | $50,000.00 | $25,000.00 | |
| 22 | X5230174 | DRAINAGE SCUPPR DS-11 | 120 | EACH | $4,400.00 | $3,250.00 | |
| 23 | X5230190 | DRAINAGE SCUPPR DS-33 | 2 | EACH | $6,300.00 | $5,250.00 | |
| 24 | X5427602 | REMOV EX FLAR END SEC | 1 | EACH | $1,225.00 | $610.50 | |
| 25 | X5510011 | PRO SS CONN TO EX MAN | 3 | EACH | $1,400.00 | $3,267.00 | |
| 26 | X6010003 | PIPE DRAIN REMOVAL | 8 | FOOT | $147.00 | $60.00 | |
| 27 | X6024875 | TEMPORARY INLET | 1 | EACH | $4,150.00 | $4,092.00 | |
| 28 | X6061460 | PAVED DITCH SPEC | 34 | FOOT | $375.00 | $180.00 | |
| 29 | X6350204 | LINEAR DELIN PANELS 4 | 14 | EACH | $200.00 | $200.00 | |
| 30 | X6370048 | CONC BARRIER BASE SPL | 491 | FOOT | $230.00 | $200.00 | |
| 31 | X6640108 | FENCE REM & REINSTALL | 15 | FOOT | $120.00 | $300.00 | |
| 32 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $138,000.00 | $750,000.00 | |
| 33 | X7830050 | RRPM REFLECTOR REMOVL | 585 | EACH | $17.00 | $15.00 | |
| 34 | X8260112 | MAINT NAV LT SYSTEM | 24 | CAL MO | $6,848.88 | $6,694.93 | |
| 35 | X8440128 | REM EX LIGHTING SYSTM | 1 | L SUM | $67,875.08 | $67,875.08 | |
| 36 | X8950130 | MOD EX LTG CONTROLLER | 1 | EACH | $4,829.27 | $4,829.27 | |
| 37 | Z0001002 | GDRL AGG EROS CONT | 225 | TON | $165.00 | $60.00 | |
| 38 | Z0001899 | JACK & REM EX BEARING | 81 | EACH | $35,000.00 | $45,000.00 | |
| 39 | Z0007101 | C&D LEAD PT CL RS N1 | 1 | L SUM | $2,244,600.00 | $2,222,359.84 | |
| 40 | Z0010501 | CLEAN & PT STL BR N1 | 1 | L SUM | $194,000.00 | $192,000.00 | |
| 41 | Z0010502 | CLEAN & PT STL BR N2 | 1 | L SUM | $14,105,000.00 | $11,253,299.19 | |
| 42 | Z0012754 | STR REP CON DP = < 5 | 1,830 | SQ FT | $170.00 | $174.45 | |
| 43 | Z0012755 | STR REP CON DP OVER 5 | 83 | SQ FT | $210.00 | $190.00 | |
| 44 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $532,772.39 | $500,000.00 | |
| 45 | Z0029090 | DIAMOND GRIND BR SEC | 21,520 | SQ YD | $12.50 | $6.68 | |
| 46 | Z0034396 | MODULAR EXPAN JT 12 | 43 | FOOT | $5,500.00 | $7,495.00 | |
| 47 | Z0048665 | RR PROT LIABILITY INS | 1 | L SUM | $15,500.00 | $7,125.00 | |
| 48 | Z0062456 | TEMP PAVEMENT | 642 | SQ YD | $145.00 | $146.31 | |
| 49 | Z0076600 | TRAINEES | 2,000 | HOUR | $0.8000 | $0.8000 | |
| 50 | Z0076604 | TRAINEES TPG | 2,000 | HOUR | $15.00 | $15.00 | |
| 51 | 20100500 | TREE REMOV ACRES | 0.25 | ACRE | $80,000.00 | $25,000.00 | |
| 52 | 20101000 | TEMPORARY FENCE | 1,587 | FOOT | $36.00 | $20.00 | |
| 53 | 20101400 | NITROGEN FERT NUTR | 90 | POUND | $4.00 | $4.00 | |
| 54 | 20101500 | PHOSPHORUS FERT NUTR | 90 | POUND | $4.00 | $4.00 | |
| 55 | 20101600 | POTASSIUM FERT NUTR | 90 | POUND | $4.00 | $4.00 | |
| 56 | 20200100 | EARTH EXCAVATION | 2,701 | CU YD | $48.00 | $51.93 | |
| 57 | 20300100 | CHANNEL EXCAVATION | 2,633 | CU YD | $165.00 | $375.00 | |
| 58 | 20800150 | TRENCH BACKFILL | 10 | CU YD | $220.00 | $125.00 | |
| 59 | 21101615 | TOPSOIL F & P 4 | 5,682 | SQ YD | $12.00 | $16.35 | |
| 60 | 21400100 | GRADING & SHAP DITCH | 382 | FOOT | $22.00 | $45.00 | |
| 61 | 25000210 | SEEDING CL 2A | 1 | ACRE | $3,000.00 | $3,000.00 | |
| 62 | 25000750 | MOWING | 5 | ACRE | $400.00 | $400.00 | |
| 63 | 25100115 | MULCH METHOD 2 | 1 | ACRE | $1,775.00 | $1,775.00 | |
| 64 | 25100635 | HD EROS CONTR BLANKET | 1,375 | SQ YD | $3.00 | $3.00 | |
| 65 | 28000250 | TEMP EROS CONTR SEED | 24 | POUND | $12.00 | $30.00 | |
| 66 | 28000305 | TEMP DITCH CHECKS | 95 | FOOT | $33.00 | $30.00 | |
| 67 | 28000400 | PERIMETER EROS BAR | 1,402 | FOOT | $13.00 | $7.00 | |
| 68 | 28000500 | INLET & PIPE PROTECT | 25 | EACH | $575.00 | $250.00 | |
| 69 | 28000510 | INLET FILTERS | 25 | EACH | $815.00 | $195.00 | |
| 70 | 28100801 | STONE DUMP RIP CL A1 | 15 | TON | $2,100.00 | $1,100.00 | |
| 71 | 28100811 | STONE DUMP RIP CL A6 | 4,120 | TON | $270.00 | $225.00 | |
| 72 | 30300011 | AGG SUBGRADE IMPROVE | 2,378 | TON | $51.00 | $34.81 | |
| 73 | 40600295 | P BIT MATLS TACK CT | 4,919 | POUND | $2.92 | $2.92 | |
| 74 | 40603208 | P HMA BC IL-9.5 N70 | 83 | TON | $436.00 | $436.00 | |
| 75 | 40604172 | P HMA SC IL-9.5 E N70 | 104 | TON | $395.00 | $395.00 | |
| 76 | 42000080 | PVT CON PCC BR APP SL | 207 | SQ YD | $525.00 | $330.00 | |
| 77 | 42000411 | PCC PVT 9 1/2 JOINTD | 365 | SQ YD | $370.00 | $258.89 | |
| 78 | 42001300 | PROTECTIVE COAT | 1,678 | SQ YD | $5.50 | $1.00 | |
| 79 | 44000100 | PAVEMENT REM | 2,628 | SQ YD | $55.00 | $22.54 | |
| 80 | 44000500 | COMB CURB GUTTER REM | 110 | FOOT | $59.00 | $5.00 | |
| 81 | 44004000 | PAVED DITCH REMOVAL | 34 | FOOT | $165.00 | $15.00 | |
| 82 | 44004250 | PAVED SHLD REMOVAL | 440 | SQ YD | $24.00 | $20.85 | |
| 83 | 48101500 | AGGREGATE SHLDS B 6 | 32 | SQ YD | $64.00 | $50.00 | |
| 84 | 48203029 | HMA SHOULDERS 8 | 2,152 | SQ YD | $127.13 | $127.13 | |
| 85 | 48300300 | PCC SHOULDERS 8 | 70 | SQ YD | $200.00 | $258.89 | |
| 86 | 50102400 | CONC REM | 84.7 | CU YD | $1,800.00 | $550.00 | |
| 87 | 50104701 | REM EX CONC DECK N1 | 1 | EACH | $498,991.56 | $1,424,500.00 | |
| 88 | 50104702 | REM EX CONC DECK N2 | 1 | EACH | $5,460,000.00 | $12,159,390.00 | |
| 89 | 50105220 | PIPE CULVERT REMOV | 256 | FOOT | $47.00 | $60.00 | |
| 90 | 50157300 | PROTECTIVE SHIELD | 4,459 | SQ YD | $21.00 | $1.00 | |
| 91 | 50200100 | STRUCTURE EXCAVATION | 184 | CU YD | $75.00 | $125.00 | |
| 92 | 50300100 | FLOOR DRAINS | 173 | EACH | $1,600.00 | $850.00 | |
| 93 | 50300225 | CONC STRUCT | 101.5 | CU YD | $2,750.00 | $2,650.00 | |
| 94 | 50300255 | CONC SUP-STR | 8,501.2 | CU YD | $2,100.00 | $1,305.00 | |
| 95 | 50300300 | PROTECTIVE COAT | 28,350 | SQ YD | $3.30 | $2.75 | |
| 96 | 50301350 | CONC SUPSTR APP SLAB | 356.2 | CU YD | $820.00 | $945.00 | |
| 97 | 50500405 | F & E STRUCT STEEL | 37,300 | POUND | $11.50 | $35.00 | |
| 98 | 50500505 | STUD SHEAR CONNECTORS | 100,637 | EACH | $8.00 | $4.11 | |
| 99 | 50800205 | REINF BARS, EPOXY CTD | 2,254,820 | POUND | $1.69 | $1.68 | |
| 100 | 50800515 | BAR SPLICERS | 17,274 | EACH | $49.00 | $40.00 | |
| 101 | 50800530 | MECHANICAL SPLICERS | 53 | EACH | $176.00 | $140.00 | |
| 102 | 50900805 | PEDESTRIAN RAIL | 519 | FOOT | $166.00 | $157.00 | |
| 103 | 51500100 | NAME PLATES | 2 | EACH | $1,000.00 | $2,005.00 | |
| 104 | 52000110 | PREF JT STRIP SEAL | 504 | FOOT | $383.00 | $442.46 | |
| 105 | 52000216 | FINGER PLT EXP JT 5 | 203.5 | FOOT | $5,500.00 | $6,500.00 | |
| 106 | 52000220 | FINGER PLT EXP JT 6 | 39.5 | FOOT | $6,050.00 | $7,250.00 | |
| 107 | 52000600 | FAB REINF ELAS TROUGH | 270 | FOOT | $913.00 | $950.00 | |
| 108 | 52100010 | ELAST BEARING ASSY T1 | 20 | EACH | $1,925.00 | $6,500.00 | |
| 109 | 52100510 | ANCHOR BOLTS 3/4 | 80 | EACH | $160.00 | $210.00 | |
| 110 | 52100520 | ANCHOR BOLTS 1 | 144 | EACH | $209.00 | $250.00 | |
| 111 | 52100530 | ANCHOR BOLTS 1 1/4 | 68 | EACH | $246.00 | $350.00 | |
| 112 | 52100540 | ANCHOR BOLTS 1 1/2 | 16 | EACH | $315.00 | $550.00 | |
| 113 | 52100560 | ANCHOR BOLTS 2 | 16 | EACH | $432.00 | $1,000.00 | |
| 114 | 52200010 | TEMP SHT PILING | 335 | SQ FT | $120.00 | $100.00 | |
| 115 | 52318802 | DRAINAGE SYSTEM FOR STRUCTURES | 1 | L SUM | $115,000.00 | $70,000.00 | |
| 116 | 5422C012 | P CUL CL C 2 12 TEMP | 241 | FOOT | $110.00 | $249.60 | |
| 117 | 54262712 | METAL FL END SEC 12" | 1 | EACH | $1,000.00 | $2,260.50 | |
| 118 | 550A0340 | STORM SEW CL A 2 12 | 53 | FOOT | $80.00 | $145.36 | |
| 119 | 55100500 | STORM SEWER REM 12 | 52 | FOOT | $83.00 | $60.00 | |
| 120 | 58600101 | GRANULAR BACKFILL STR | 184 | CU YD | $160.00 | $115.00 | |
| 121 | 58700300 | CONCRETE SEALER | 7,023 | SQ FT | $15.00 | $2.00 | |
| 122 | 59000200 | EPOXY CRACK INJECTION | 270 | FOOT | $90.00 | $90.00 | |
| 123 | 59100100 | GEOCOMPOSITE WALL DR | 107 | SQ YD | $83.00 | $65.00 | |
| 124 | 60100060 | CONC HDWL FOR P DRAIN | 2 | EACH | $575.00 | $1,435.50 | |
| 125 | 60100945 | PIPE DRAINS 12 | 8 | FOOT | $146.00 | $171.85 | |
| 126 | 60146304 | P UNDR FOR STRUCT 4 | 269 | FOOT | $53.00 | $45.00 | |
| 127 | 60237420 | INLETS TA T20F&G | 1 | EACH | $2,000.00 | $2,260.50 | |
| 128 | 60240324 | INLETS TB T20F&G | 1 | EACH | $2,125.00 | $3,360.50 | |
| 129 | 60250200 | CB ADJUST | 2 | EACH | $1,025.00 | $885.50 | |
| 130 | 60260100 | INLETS ADJUST | 8 | EACH | $1,850.00 | $885.50 | |
| 131 | 60500040 | REMOV MANHOLES | 1 | EACH | $2,000.00 | $610.50 | |
| 132 | 60500060 | REMOV INLETS | 2 | EACH | $1,200.00 | $610.50 | |
| 133 | 60605100 | COMB CC&G TB6.24 AEP | 110 | FOOT | $160.00 | $110.00 | |
| 134 | 61000050 | CONC THRUST BLOCKS | 1 | EACH | $1,000.00 | $3,360.50 | |
| 135 | 61000335 | TY G INLET BOX 610001 | 1 | EACH | $6,550.00 | $7,392.00 | |
| 136 | 63000001 | SPBGR TY A 6FT POSTS | 987.5 | FOOT | $34.00 | $34.00 | |
| 137 | 63100085 | TRAF BAR TERM T6 | 3 | EACH | $3,900.00 | $4,250.00 | |
| 138 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $3,200.00 | $3,200.00 | |
| 139 | 63100169 | TR BAR TRM T1 SPL FLR | 1 | EACH | $3,200.00 | $3,200.00 | |
| 140 | 63200310 | GUARDRAIL REMOV | 757 | FOOT | $6.00 | $6.00 | |
| 141 | 63700380 | CONC BAR VX 44HT | 800 | FOOT | $465.00 | $291.31 | |
| 142 | 64300770 | IMP ATTEN SU NAR TL3 | 1 | EACH | $34,000.00 | $34,000.00 | |
| 143 | 66900200 | NON SPL WASTE DISPOSL | 2,826 | CU YD | $95.00 | $116.70 | |
| 144 | 66900530 | SOIL DISPOSAL ANALY | 1 | EACH | $1,450.00 | $1,500.00 | |
| 145 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,200.00 | $2,000.00 | |
| 146 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,200.00 | $2,000.00 | |
| 147 | 66901006 | REG SUB MON | 28 | CAL DA | $1,250.00 | $1,000.00 | |
| 148 | 67000400 | ENGR FIELD OFFICE A | 36 | CAL MO | $3,700.00 | $3,850.00 | |
| 149 | 67000600 | ENGR FIELD LAB | 36 | CAL MO | $2,700.00 | $1,550.00 | |
| 150 | 67100100 | MOBILIZATION | 1 | L SUM | $4,175,000.00 | $4,258,848.08 | |
| 151 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $0.1000 | $900.00 | |
| 152 | 70107025 | CHANGEABLE MESSAGE SN | 2,100 | CAL DA | $25.00 | $24.00 | |
| 153 | 70300100 | SHORT TERM PAVT MKING | 13,096 | FOOT | $1.20 | $1.25 | |
| 154 | 70300150 | SHRT TRM PAVT MK REM | 70,788 | SQ FT | $1.00 | $0.4000 | |
| 155 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 795 | SQ FT | $12.00 | $3.90 | |
| 156 | 70307120 | TEMP PVT MK L4 T4 TAPE | 99,730 | FOOT | $1.75 | $1.34 | |
| 157 | 70307140 | TEMP PVT MK L8 T4 TAPE | 23,124 | FOOT | $3.00 | $2.60 | |
| 158 | 70307160 | TEMP PVT MK L12 T4 TAPE | 6,814 | FOOT | $6.00 | $3.90 | |
| 159 | 70307210 | TEMP PVT MK L24 T4 TAPE | 492 | FOOT | $12.00 | $8.00 | |
| 160 | 70400100 | TEMP CONC BARRIER | 7,112.5 | FOOT | $38.25 | $40.00 | |
| 161 | 70400125 | PIN TEMP CONC BARRIER | 900 | EACH | $27.00 | $30.00 | |
| 162 | 70400200 | REL TEMP CONC BARRIER | 5,765.5 | FOOT | $10.50 | $12.90 | |
| 163 | 70500100 | TEMP SPBGR TY A | 150 | FOOT | $40.00 | $40.00 | |
| 164 | 70500615 | TEMP TR BAR TERM T1 | 1 | EACH | $4,600.00 | $4,600.00 | |
| 165 | 70500665 | TEMP TR BAR TERM T6 | 1 | EACH | $4,800.00 | $4,800.00 | |
| 166 | 70600255 | IMP ATTN TEMP FRN TL2 | 2 | EACH | $12,000.00 | $20,613.09 | |
| 167 | 70600260 | IMP ATTN TEMP FRN TL3 | 3 | EACH | $12,000.00 | $25,689.22 | |
| 168 | 70600322 | IMP ATTN REL FRN TL2 | 6 | EACH | $7,500.00 | $6,822.87 | |
| 169 | 70600332 | IMP ATTN REL FRN TL3 | 8 | EACH | $7,500.00 | $6,822.87 | |
| 170 | 70600370 | IMP ATTN REL SUN TL3 | 1 | EACH | $7,500.00 | $6,822.88 | |
| 171 | 72000100 | SIGN PANEL T1 | 12 | SQ FT | $16.75 | $16.75 | |
| 172 | 72000300 | SIGN PANEL T3 | 824 | SQ FT | $29.75 | $29.75 | |
| 173 | 72400330 | REMOV SIGN PANEL T3 | 918 | SQ FT | $5.50 | $5.50 | |
| 174 | 72400710 | RELOC SIGN PANEL T1 | 55 | SQ FT | $24.25 | $24.25 | |
| 175 | 72501000 | TERMINAL MARKER - DA | 4 | EACH | $50.00 | $50.00 | |
| 176 | 72900100 | METAL POST TY A | 17 | FOOT | $11.00 | $11.00 | |
| 177 | 73300100 | OVHD SIN STR-SPAN T1A | 50.4 | FOOT | $1,350.00 | $1,350.00 | |
| 178 | 73302170 | OSS CANT 2CA 3-0X5-6 | 27.5 | FOOT | $2,225.00 | $2,225.00 | |
| 179 | 73304000 | OVHD SIN STR BR MT | 24.5 | FOOT | $1,125.00 | $1,125.00 | |
| 180 | 73400200 | DRILL SHAFT CONC FDN | 9.3 | CU YD | $4,500.00 | $6,043.52 | |
| 181 | 73500020 | REM OH SIN STR MONO | 2 | EACH | $3,425.00 | $3,425.00 | |
| 182 | 73602000 | REM OVHD SN STR-BR MT | 1 | EACH | $2,150.00 | $2,150.00 | |
| 183 | 73700100 | REM GR MT SIN SUPPORT | 1 | EACH | $855.00 | $855.00 | |
| 184 | 78003101 | PREF PL PM TB STNRD LTR-SYM | 63 | SQ FT | $48.00 | $48.00 | |
| 185 | 78003111 | PREF PL PM TB STD L4 | 1,767 | FOOT | $4.50 | $4.50 | |
| 186 | 78003131 | PREF PL PM TB STD L6 | 21,831 | FOOT | $6.75 | $6.75 | |
| 187 | 78003141 | PREF PL PM TB STD L8 | 9,837 | FOOT | $9.90 | $9.90 | |
| 188 | 78003151 | PREF PL PM TB STD L12 | 3,094 | FOOT | $13.75 | $13.75 | |
| 189 | 78009000 | MOD URETH PM LTR-SYM | 156 | SQ FT | $20.00 | $20.00 | |
| 190 | 78009004 | MOD URETH PM LINE 4 | 6,659 | FOOT | $1.00 | $1.00 | |
| 191 | 78009006 | MOD URETH PM LINE 6 | 12,714 | FOOT | $1.35 | $1.35 | |
| 192 | 78009008 | MOD URETH PM LINE 8 | 2,680 | FOOT | $3.25 | $3.25 | |
| 193 | 78009012 | MOD URETH PM LINE 12 | 1,068 | FOOT | $7.15 | $7.15 | |
| 194 | 78009024 | MOD URETH PM LINE 24 | 90 | FOOT | $20.00 | $20.00 | |
| 195 | 78011025 | GRV RCSD PVT MRKG 5 | 8,425 | FOOT | $0.7000 | $0.7000 | |
| 196 | 78011035 | GRV RCSD PVT MRKG 7 | 34,545 | FOOT | $0.9000 | $0.9000 | |
| 197 | 78011045 | GRV RCSD PVT MRKG 9 | 12,517 | FOOT | $2.00 | $2.00 | |
| 198 | 78011065 | GRV RCSD PVT MRKG 13 | 4,162 | FOOT | $5.00 | $5.00 | |
| 199 | 78011125 | GRV RCSD PVT MRKG 25 | 90 | FOOT | $15.00 | $15.00 | |
| 200 | 78100100 | RAISED REFL PAVT MKR | 20 | EACH | $425.00 | $375.00 | |
| 201 | 78100300 | REPLACEMENT REFLECTOR | 585 | EACH | $20.00 | $20.00 | |
| 202 | 78300200 | RAISED REF PVT MK REM | 20 | EACH | $126.34 | $65.00 | |
| 203 | 78300202 | PVT MKG REM WTR BLAST | 32,988 | SQ FT | $1.00 | $1.40 | |
| 204 | 81028350 | UNDRGRD C PVC 2 | 720 | FOOT | $53.84 | $53.84 | |
| 205 | 81100300 | CON AT ST 1 GALVS | 615 | FOOT | $123.97 | $123.97 | |
| 206 | 81200220 | CON EMB STR 1.5 PVC | 4,843 | FOOT | $64.83 | $64.83 | |
| 207 | 81300220 | JUN BX SS AS 6X6X4 | 7 | EACH | $2,131.79 | $2,131.79 | |
| 208 | 81300320 | JUN BX SS AS 8X8X6 | 7 | EACH | $2,754.55 | $2,754.55 | |
| 209 | 81300600 | JUN BX SS AS 14X8X6 | 7 | EACH | $3,798.13 | $3,798.13 | |
| 210 | 81603035 | UD 2#6 #6G XLPUSE 1 | 1,121 | FOOT | $40.89 | $40.89 | |
| 211 | 81702120 | EC C XLP USE 1C 8 | 6,572 | FOOT | $5.62 | $5.62 | |
| 212 | 81702130 | EC C XLP USE 1C 6 | 16,322 | FOOT | $6.47 | $6.47 | |
| 213 | 82110007 | LUM LED RDWY G | 26 | EACH | $1,759.61 | $1,759.61 | |
| 214 | 82200608 | WWOWL LED 180 D R | 4 | EACH | $57,698.33 | $57,698.33 | |
| 215 | 82200609 | WWOWL LED 360 D G | 2 | EACH | $57,698.33 | $57,698.33 | |
| 216 | 83060450 | LT P GS 45MH 15MA | 16 | EACH | $12,075.39 | $12,075.39 | |
| 217 | 83060550 | LT P GS 50MH 15MA | 3 | EACH | $12,050.90 | $12,050.90 | |
| 218 | 83600356 | LP F M 15BC 8 5/8X6 | 2 | EACH | $2,547.91 | $2,547.81 | |
| 219 | 83600358 | LP F M 15BC 8 5/8X8 | 3 | EACH | $2,690.91 | $2,690.91 | |
| 220 | 87900100 | DRILL EX FOUNDATION | 1 | EACH | $2,640.72 | $2,640.72 |