20-00224-00-BT
- Let date
- Friday, January 20, 2023
- Contract
- 61J19 · job page
- District
- District 1
- County
- Cook
- Highway
- Limits
- HMA resurfacing and contruction of HMA shared-use path with pavement narrowing and widening, sidewalks, concrete curb and gutter, landscaping, retaining wall, and traffic signal enhancements along Oakton Street in Des Plaines.
Bidders 4
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | Dunnet Bay Construction Company Low bidder | $2,137,222 | ||
| 2 | Alliance Contractors, Inc. | $2,260,250 | +5.8% | |
| 3 | Lorig Construction Company | $2,280,021 | +6.7% | |
| 4 | Areatha Construction Co., Inc. | $2,581,706 | +20.8% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 Dunnet Bay Cons… | #2 Alliance Contra… | #3 Lorig Construct… | #4 Areatha Constru… |
|---|---|---|---|---|---|---|---|---|---|
| 1 | X0326806 | WASHOUT BASIN | 1 | L SUM | $1,500.00 | $1,500.00 | $100.00 | $2,489.56 | |
| 2 | X0326898 | CENTERLN RUM STRIP 16 | 1,603 | FOOT | $1.41 | $1.40 | $6.00 | $3.95 | |
| 3 | X1400326 | R R FL BEACON A COMP | 3 | EACH | $12,800.00 | $17,373.00 | $13,000.00 | $13,564.00 | |
| 4 | X2010400 | STUMP REMOVAL ONLY | 219 | UNIT | $3.75 | $9.00 | $9.00 | $31.80 | |
| 5 | X2510635 | HD EROS CONT BLANK SP | 202 | SQ YD | $2.20 | $3.00 | $2.00 | $3.20 | |
| 6 | X2511630 | EROS CONT BLANKET SPL | 1,410 | SQ YD | $1.70 | $7.00 | $1.75 | $7.40 | |
| 7 | X7010216 | TRAF CONT & PROT SPL | 1 | L SUM | $25,860.00 | $25,860.00 | $175,000.00 | $30,201.10 | |
| 8 | Z0004552 | APPROACH SLAB REM | 88 | SQ YD | $63.00 | $200.00 | $65.00 | $58.60 | |
| 9 | Z0012136 | BR DECK SCAR 1 1/2 | 304 | SQ YD | $40.00 | $10.00 | $95.00 | $126.01 | |
| 10 | Z0013797 | STAB CONSTR ENTRANCE | 20 | SQ YD | $55.00 | $10.00 | $3.00 | $173.45 | |
| 11 | Z0013798 | CONSTRUCTION LAYOUT | 1 | L SUM | $2,000.00 | $9,675.00 | $45,000.00 | $26,460.40 | |
| 12 | Z0030850 | TEMP INFO SIGNING | 52 | SQ FT | $14.00 | $14.00 | $14.00 | $23.30 | |
| 13 | Z0073510 | TEMP TR SIGNAL TIMING | 1 | EACH | $1,200.00 | $1,050.00 | $1,200.00 | $1,271.60 | |
| 14 | Z0076600 | TRAINEES | 500 | HOUR | $0.8000 | $0.8000 | $0.8000 | $0.8000 | |
| 15 | Z0076604 | TRAINEES TPG | 500 | HOUR | $15.00 | $15.00 | $15.00 | $15.00 | |
| 16 | 20101100 | TREE TRUNK PROTECTION | 14 | EACH | $100.00 | $125.00 | $300.00 | $175.00 | |
| 17 | 20101200 | TREE ROOT PRUNING | 14 | EACH | $105.00 | $130.00 | $130.00 | $211.95 | |
| 18 | 20101300 | TREE PRUN 1-10 | 11 | EACH | $50.00 | $200.00 | $200.00 | $211.95 | |
| 19 | 20101350 | TREE PRUN OVER 10 | 3 | EACH | $125.00 | $300.00 | $300.00 | $211.95 | |
| 20 | 20200100 | EARTH EXCAVATION | 665 | CU YD | $68.00 | $20.00 | $57.00 | $50.70 | |
| 21 | 20201200 | REM & DISP UNS MATL | 475 | CU YD | $55.00 | $20.00 | $60.00 | $71.80 | |
| 22 | 20800150 | TRENCH BACKFILL | 149 | CU YD | $79.00 | $60.00 | $80.00 | $74.20 | |
| 23 | 20900110 | POROUS GRAN BACKFILL | 70 | CU YD | $100.00 | $55.00 | $110.00 | $72.05 | |
| 24 | 21001000 | GEOTECH FAB F/GR STAB | 100 | SQ YD | $5.00 | $5.00 | $5.00 | $7.90 | |
| 25 | 21101615 | TOPSOIL F & P 4 | 1,612 | SQ YD | $7.00 | $0.1000 | $7.00 | $0.1000 | |
| 26 | 25000210 | SEEDING CL 2A | 0.5 | ACRE | $3,324.00 | $2,420.00 | $2,800.00 | $2,564.45 | |
| 27 | 25000300 | SEEDING CL 3 | 0.25 | ACRE | $4,329.00 | $3,630.00 | $3,000.00 | $3,846.65 | |
| 28 | 25000350 | SEEDING CL 7 | 0.5 | ACRE | $1,336.00 | $100.00 | $1,500.00 | $105.95 | |
| 29 | 25000400 | NITROGEN FERT NUTR | 32 | POUND | $3.00 | $1.00 | $4.00 | $1.05 | |
| 30 | 25000600 | POTASSIUM FERT NUTR | 32 | POUND | $3.00 | $1.00 | $4.00 | $1.05 | |
| 31 | 28000400 | PERIMETER EROS BAR | 2,558 | FOOT | $2.00 | $2.75 | $2.10 | $2.90 | |
| 32 | 28000510 | INLET FILTERS | 66 | EACH | $151.00 | $50.00 | $50.00 | $238.45 | |
| 33 | 28001100 | TEMP EROS CONTR BLANK | 1,151 | SQ YD | $0.9000 | $0.1000 | $1.00 | $0.1000 | |
| 34 | 28001200 | TEMP HD EROS CONTR BL | 311 | SQ YD | $1.70 | $0.1000 | $2.00 | $0.1000 | |
| 35 | 30300001 | AGG SUBGRADE IMPROVE | 50 | CU YD | $75.00 | $65.00 | $100.00 | $67.70 | |
| 36 | 30300112 | AGG SUBGRADE IMPR 12 | 1,007 | SQ YD | $35.00 | $21.00 | $36.00 | $41.70 | |
| 37 | 35101600 | AGG BASE CSE B 4 | 1,057 | SQ YD | $15.00 | $6.00 | $18.00 | $20.81 | |
| 38 | 35101800 | AGG BASE CSE B 6 | 1,359 | SQ YD | $18.00 | $9.00 | $17.00 | $27.75 | |
| 39 | 40600275 | BIT MATLS PR CT | 2,564 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 40 | 40600290 | BIT MATLS TACK CT | 7,521 | POUND | $0.0100 | $0.0100 | $0.0100 | $0.0100 | |
| 41 | 40600370 | LONG JOINT SEALANT | 6,513 | FOOT | $3.10 | $2.60 | $2.75 | $3.20 | |
| 42 | 40600982 | HMA SURF REM BUTT JT | 113 | SQ YD | $25.00 | $22.80 | $23.00 | $26.50 | |
| 43 | 40603085 | HMA BC IL-19.0 N70 | 37 | TON | $165.00 | $153.90 | $165.00 | $165.00 | |
| 44 | 40603200 | P HMA BC IL-4.75 N50 | 468 | TON | $101.00 | $167.10 | $175.00 | $107.05 | |
| 45 | 40604060 | HMA SC IL-9.5 D N50 | 192 | TON | $150.00 | $176.40 | $200.00 | $150.00 | |
| 46 | 40604062 | HMA SC IL-9.5 D N70 | 936 | TON | $78.00 | $111.90 | $115.00 | $82.65 | |
| 47 | 42000060 | WELDED WIRE REINF | 269 | SQ YD | $16.00 | $10.00 | $17.00 | $17.30 | |
| 48 | 42001300 | PROTECTIVE COAT | 1,830 | SQ YD | $1.00 | $0.0100 | $2.00 | $2.15 | |
| 49 | 42300400 | PCC DRIVEWAY PAVT 8 | 109 | SQ YD | $72.00 | $100.00 | $115.00 | $128.75 | |
| 50 | 42400200 | PC CONC SIDEWALK 5 | 1,497 | SQ FT | $8.10 | $9.00 | $9.75 | $9.95 | |
| 51 | 42400800 | DETECTABLE WARNINGS | 80 | SQ FT | $37.00 | $30.00 | $35.00 | $48.40 | |
| 52 | 44000100 | PAVEMENT REM | 817 | SQ YD | $36.00 | $40.00 | $21.00 | $34.90 | |
| 53 | 44000158 | HMA SURF REM 2 1/4 | 11,141 | SQ YD | $3.00 | $3.00 | $3.00 | $3.20 | |
| 54 | 44000200 | DRIVE PAVEMENT REM | 52 | SQ YD | $40.00 | $30.00 | $24.00 | $29.55 | |
| 55 | 44000500 | COMB CURB GUTTER REM | 1,920 | FOOT | $8.00 | $30.00 | $11.00 | $9.75 | |
| 56 | 44000600 | SIDEWALK REM | 2,563 | SQ FT | $2.00 | $3.00 | $2.50 | $2.50 | |
| 57 | 48203009 | HMA SHOULDERS 3 | 102 | SQ YD | $50.00 | $42.10 | $45.00 | $53.00 | |
| 58 | 50102400 | CONC REM | 48.2 | CU YD | $2,300.00 | $2,400.00 | $1,100.00 | $1,527.45 | |
| 59 | 50104000 | BRIDGE RAIL REMOVAL | 199 | FOOT | $24.00 | $1.00 | $20.00 | $28.80 | |
| 60 | 50200100 | STRUCTURE EXCAVATION | 185 | CU YD | $90.00 | $40.00 | $30.00 | $75.10 | |
| 61 | 50300225 | CONC STRUCT | 300.6 | CU YD | $800.00 | $460.00 | $500.00 | $572.00 | |
| 62 | 50300255 | CONC SUP-STR | 88 | CU YD | $1,340.00 | $1,500.00 | $1,000.00 | $1,139.20 | |
| 63 | 50300300 | PROTECTIVE COAT | 587 | SQ YD | $2.75 | $0.0100 | $1.00 | $3.25 | |
| 64 | 50301350 | CONC SUPSTR APP SLAB | 45.2 | CU YD | $750.00 | $800.00 | $575.00 | $615.80 | |
| 65 | 50800205 | REINF BARS, EPOXY CTD | 41,910 | POUND | $2.00 | $1.75 | $2.00 | $1.85 | |
| 66 | 50901720 | BICYCLE RAILING | 879 | FOOT | $156.00 | $156.00 | $160.00 | $165.30 | |
| 67 | 50901750 | PARAPET RAILING | 264 | FOOT | $86.00 | $86.00 | $90.00 | $91.15 | |
| 68 | 52000110 | PREF JT STRIP SEAL | 25 | FOOT | $690.00 | $460.00 | $600.00 | $876.63 | |
| 69 | 52200015 | PERM SHT PILING | 10,140 | SQ FT | $15.00 | $23.15 | $17.00 | $43.15 | |
| 70 | 550A0050 | STORM SEW CL A 1 12 | 71 | FOOT | $115.00 | $105.00 | $85.00 | $127.15 | |
| 71 | 550A0340 | STORM SEW CL A 2 12 | 192 | FOOT | $115.00 | $105.00 | $91.00 | $127.15 | |
| 72 | 55100500 | STORM SEWER REM 12 | 328 | FOOT | $40.00 | $10.00 | $31.00 | $42.40 | |
| 73 | 60108204 | PIPE UNDERDR T 2 4 | 557 | FOOT | $42.00 | $20.00 | $42.00 | $41.35 | |
| 74 | 60201330 | CB TA 4 DIA T23F&G | 11 | EACH | $4,000.00 | $6,000.00 | $5,000.00 | $5,616.35 | |
| 75 | 60205030 | CB TA 5 DIA T23F&G | 4 | EACH | $5,500.00 | $7,000.00 | $5,600.00 | $7,735.70 | |
| 76 | 60207605 | CB TC T8G | 1 | EACH | $5,300.00 | $4,000.00 | $2,400.00 | $3,073.10 | |
| 77 | 60208230 | CB TC T23F&G | 2 | EACH | $4,800.00 | $4,000.00 | $2,700.00 | $3,285.05 | |
| 78 | 60208240 | CB TC T24F&G | 2 | EACH | $5,500.00 | $4,000.00 | $2,700.00 | $3,285.05 | |
| 79 | 60250200 | CB ADJUST | 3 | EACH | $700.00 | $250.00 | $800.00 | $741.80 | |
| 80 | 60255500 | MAN ADJUST | 3 | EACH | $700.00 | $250.00 | $1,300.00 | $741.80 | |
| 81 | 60500050 | REMOV CATCH BAS | 17 | EACH | $450.00 | $300.00 | $1,200.00 | $529.85 | |
| 82 | 60603800 | COMB CC&G TB6.12 | 1,910 | FOOT | $32.00 | $38.50 | $42.50 | $46.40 | |
| 83 | 60605000 | COMB CC&G TB6.24 | 401 | FOOT | $42.00 | $45.50 | $48.00 | $57.90 | |
| 84 | 60618300 | CONC MEDIAN SURF 4 | 1,054 | SQ FT | $7.00 | $8.25 | $8.00 | $10.20 | |
| 85 | 63000001 | SPBGR TY A 6FT POSTS | 175 | FOOT | $41.00 | $35.00 | $35.00 | $37.10 | |
| 86 | 63000035 | BCK SD PROT OF GRDRL | 183 | FOOT | $18.00 | $18.00 | $18.00 | $19.05 | |
| 87 | 63100085 | TRAF BAR TERM T6 | 1 | EACH | $5,000.00 | $4,800.00 | $4,800.00 | $4,800.00 | |
| 88 | 63100167 | TR BAR TRM T1 SPL TAN | 1 | EACH | $3,800.00 | $3,500.00 | $3,500.00 | $3,500.00 | |
| 89 | 63200310 | GUARDRAIL REMOV | 683 | FOOT | $5.00 | $5.00 | $5.00 | $5.00 | |
| 90 | 66900200 | NON SPL WASTE DISPOSL | 1,215 | CU YD | $40.00 | $50.00 | $62.00 | $95.99 | |
| 91 | 66900530 | SOIL DISPOSAL ANALY | 6 | EACH | $1,245.00 | $1,400.00 | $1,300.00 | $1,319.30 | |
| 92 | 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $2,500.00 | $2,500.00 | $2,500.00 | $2,649.20 | |
| 93 | 66901003 | REG SUB F CON REPORT | 1 | L SUM | $2,300.00 | $2,500.00 | $2,300.00 | $2,437.30 | |
| 94 | 66901006 | REG SUB MON | 14 | CAL DA | $785.00 | $750.00 | $1,000.00 | $785.00 | |
| 95 | 67100100 | MOBILIZATION | 1 | L SUM | $126,096.10 | $225,000.00 | $120,000.00 | $154,550.00 | |
| 96 | 70103815 | TR CONT SURVEILLANCE | 10 | CAL DA | $280.00 | $280.00 | $280.00 | $529.85 | |
| 97 | 70107025 | CHANGEABLE MESSAGE SN | 42 | CAL DA | $35.00 | $35.00 | $50.00 | $90.05 | |
| 98 | 70300100 | SHORT TERM PAVT MKING | 5,650 | FOOT | $3.00 | $1.00 | $0.2500 | $1.05 | |
| 99 | 70300150 | SHRT TRM PAVT MK REM | 1,890 | SQ FT | $3.00 | $1.00 | $0.2500 | $1.60 | |
| 100 | 70307100 | TEMP PVT MK LTR & SYM T4 TAPE | 73 | SQ FT | $3.25 | $3.25 | $3.25 | $7.40 | |
| 101 | 70307120 | TEMP PVT MK L4 T4 TAPE | 15,878 | FOOT | $1.20 | $1.20 | $1.20 | $1.25 | |
| 102 | 70307130 | TEMP PVT MK L6 T4 TAPE | 310 | FOOT | $1.40 | $1.40 | $1.40 | $1.90 | |
| 103 | 70307210 | TEMP PVT MK L24 T4 TAPE | 48 | FOOT | $2.20 | $2.20 | $2.50 | $7.65 | |
| 104 | 70400100 | TEMP CONC BARRIER | 375 | FOOT | $35.00 | $43.00 | $25.00 | $49.85 | |
| 105 | 70600240 | IMP ATTN TEMP NRD TL2 | 1 | EACH | $3,000.00 | $3,000.00 | $3,000.00 | $4,000.00 | |
| 106 | 72000100 | SIGN PANEL T1 | 100 | SQ FT | $30.00 | $30.00 | $30.00 | $31.80 | |
| 107 | 72400310 | REMOV SIGN PANEL T1 | 32 | SQ FT | $20.00 | $20.00 | $20.00 | $21.20 | |
| 108 | 72501000 | TERMINAL MARKER - DA | 1 | EACH | $50.00 | $50.00 | $50.00 | $53.00 | |
| 109 | 72800100 | TELES STL SIN SUPPORT | 124 | FOOT | $10.00 | $10.00 | $10.00 | $10.00 | |
| 110 | 78000100 | THPL PVT MK LTR & SYM | 73 | SQ FT | $5.00 | $5.00 | $5.00 | $5.00 | |
| 111 | 78000200 | THPL PVT MK LINE 4 | 9,732 | FOOT | $0.7500 | $0.7500 | $0.7500 | $0.8000 | |
| 112 | 78000400 | THPL PVT MK LINE 6 | 365 | FOOT | $1.12 | $1.12 | $1.00 | $1.20 | |
| 113 | 78000600 | THPL PVT MK LINE 12 | 289 | FOOT | $2.25 | $2.25 | $2.00 | $2.40 | |
| 114 | 78000650 | THPL PVT MK LINE 24 | 46 | FOOT | $5.00 | $5.00 | $5.00 | $5.00 | |
| 115 | 78004620 | PREF PL PM TD LN 4 | 227 | FOOT | $9.50 | $9.50 | $16.00 | $10.05 | |
| 116 | 78009000 | MOD URETH PM LTR-SYM | 37 | SQ FT | $10.60 | $10.60 | $5.00 | $11.25 | |
| 117 | 78009004 | MOD URETH PM LINE 4 | 1,168 | FOOT | $1.77 | $1.77 | $2.00 | $1.90 | |
| 118 | 78009006 | MOD URETH PM LINE 6 | 49 | FOOT | $2.65 | $2.65 | $3.00 | $2.80 | |
| 119 | 78009012 | MOD URETH PM LINE 12 | 113 | FOOT | $5.30 | $5.30 | $4.00 | $5.60 | |
| 120 | 78009024 | MOD URETH PM LINE 24 | 48 | FOOT | $10.60 | $10.60 | $7.00 | $11.25 | |
| 121 | 78100100 | RAISED REFL PAVT MKR | 362 | EACH | $33.00 | $33.00 | $31.00 | $34.95 | |
| 122 | 78200006 | GRDRAIL REF TYPE B | 6 | EACH | $10.00 | $10.00 | $10.00 | $10.00 | |
| 123 | 78300200 | RAISED REF PVT MK REM | 384 | EACH | $12.00 | $10.00 | $10.00 | $12.70 | |
| 124 | 78300202 | PAVMT MRKG REM WTR BL | 750 | SQ FT | $4.00 | $4.00 | $4.00 | $4.25 | |
| 125 | 85000200 | MAIN EX TR SIG INSTAL | 1 | EACH | $1,680.00 | $10,364.00 | $1,700.00 | $1,780.25 | |
| 126 | 88600600 | DET LOOP REPL | 80 | FOOT | $34.00 | $57.00 | $35.00 | $36.05 | |
| 127 | 89502376 | REBUILD EX HANDHOLE | 1 | EACH | $4,700.00 | $2,337.00 | $4,700.00 | $4,980.55 | |
| 128 | 89502400 | REM EX FB INSTAL COMP | 4 | EACH | $1,200.00 | $2,201.00 | $1,200.00 | $1,271.65 |