Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Apr 24, 2026 62V71 WillDistrict 1 Hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pede (3.87-Mile) Standard overlay and ADA curb ramp improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching, placement of pavement markings. The project is in the Cities of Lockport and Joliet within Will County. — Executed Nov 25 New D. Construction, Inc. $2,821,627 ·
Apr 24, 2026 62X31 CookWillDistrict 1 (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) — Executed Nov 25 New D. Construction, Inc. $135,363 ·
Apr 24, 2026 78B47 WilliamsonDistrict 9 Bridge overlay on SN 100-0070 carrying IL 166 over South Fork Saline River. — Executed Nov 25 New Samron Midwest Contracting, Inc. $304,465 ·
Apr 24, 2026 80B05 WillDistrict 1 Class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping This improvement consists of class B patches, Diamond Grinding, ADA ramp improvements, pavement marking restriping. This project is located on IL 7 (Theodore Ave) at the asphalt concrete joint approximately 100 ft west of US 30 and extends east approximately 9293 ft east to the concrete asphalt joint at IL 53 in the Cities of Crest Hill and Joliet. — Executed Nov 25 New D. Construction, Inc. $1,433,491 ·
Apr 24, 2026 80B31 WillDistrict 1 Design Overlay and new Hot-Mix Asphalt Shoulder project includes hot-mix asphalt removal, earth excavation, pavement patching, resurfacing with hot-mix asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, ADA Improvements, installation of raised reflective pavement markers. Located on US Route 45 (LaGrange Road) in the Township of Green Garden and Village of Manhattan in Will County. — Executed Nov 25 New P. T. Ferro Construction Co. $2,127,428 ·
Apr 24, 2026 80B46 WillDistrict 1 Concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge dec (500-Ft) Bridge Repair and Bridge Deck Latex Overlay project consists of concrete removal, concrete superstructure, steel reinforcement bars, finger plate expansion joints, bridge deck scarification, latex overlay, and grooving, structural repair of concrete, deck slab repair and diamond grinding including HMA surface removal, butt joints, HMA surface course, shoulder removal and HMA reconstruction, guardrail removal and replacement, pavement markings, road closure, detour installation and maint — Executed Nov 25 New D. Construction, Inc. $583,219 ·
Apr 24, 2026 80B76 WillDistrict 1 The removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulde (500-Ft) Project consists of the removal and replacement of a fixed platform scale includes removal and replacement of pavement and shoulders along the ramp curb and gutter removal and replacement, drainage improvements, sidewalk improvements, pavement marking, landscaping, and erosion control. Location on westbound I-80 at the westbound Frankfort weigh station in Village of Tinley Park, Will County. — Executed Nov 25 New D. Construction, Inc. $1,101,862 ·
Apr 24, 2026 80B79 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Charles & Charlie Janitorial Landscaping LLC $628,506 ·
Apr 24, 2026 99761 WilliamsonDistrict 9 Reconstruction of South Market Street from Boyton Street to 0.1 mile south of Texas Avenue in Marion. — Executed Nov 25 New Samron Midwest Contracting, Inc. $979,828 ·
1–9 of 9

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.