IDOT Jobs

All dates · 141 jobs · — Sign up free
★ My Jobs

Filtered by: County: Tazewell Clear all

141 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Aug 2, 2024 68J29 TazewellDistrict 4 Remove and replace chain link fence around the D4 Operations Bridge Yard in East Peoria. — Executed Nov 26 New COLLINS & HERMANN, INC. $143,158 ·
Aug 2, 2024 89861 TazewellDistrict 4 Sidewalk construction on Eleanor Court from Briarwood Ct. to Groveland St. Sidewalk replacement on Groveland Street from Allyn St. to Eller Ave. in Creve Coeur. — Executed Nov 26 New Otto Baum Company, Inc. $138,200 ·
Sep 20, 2024 68C94 TazewellDistrict 4 5.42 miles of resurfacing on IL 122 from IL 29 to just east of Oak St in Delavan in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $7,973,993 ·
Sep 20, 2024 68J30 TazewellDistrict 4 Building demolition at four locations along Main Street between Cedar and Ravine Streets in East Peoria. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $169,021 ·
Sep 20, 2024 68J41 TazewellDistrict 4 2.746 miles of resurfacing, patching, and ADA improvements on Illinois Route 8 and Business US Route 24 (Washington Rd) in Tazewell County. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $4,448,444 ·
Sep 20, 2024 89803 TazewellDistrict 4 Resurface Washington Street from Main Street to the I-74 Interchange in the City of East Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $940,411 ·
Jan 17, 2025 89863 TazewellDistrict 4 Resurfacing Parkway Drive from IL 98 to the north city limits of Pekin. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $315,613 ·
Mar 7, 2025 68H31 TazewellDistrict 4 Bridge deck sealing at various locations in Tazewell County. — Executed Nov 25 New All States Painting, Inc. $348,300 ·
Mar 7, 2025 89818 TazewellDistrict 4 Reconstruction of Camp Street and Riverside Drive intersection in East Peoria. Work includes PCC pavement, HMA overlay, asphalt shoulders, curb and gutter, storm sewer, and traffic signals. — Executed Nov 25 New Otto Baum Company, Inc. $2,668,000 ·
Apr 25, 2025 68A65 TazewellDistrict 4 Resurfacing IL 9 from 350 feet east of Dillion Creek to East Street in Tazewell County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $11,849,961 ·
Apr 25, 2025 68G27 TazewellDistrict 4 Bridge repairs to SN 090-0030 carrying IL 8/IL 116 over the Illinois River. — Executed Nov 25 New William Charles Construction Company, LLC $3,383,301 ·
Apr 25, 2025 68H82 TazewellDistrict 4 PCC patching on EB I-74, patching on WB I-74 ramp to Morton Ave, pavement jacking on WB I-74 at US 150. 2.56 miles gross. — Executed Nov 25 New G. M. Sipes Construction, Inc. $409,507 ·
Apr 25, 2025 89802 TazewellDistrict 4 HMA resurfacing and construction of a Multi-use path along Detroit Avenue in Morton. Includes; sidewalks, pedestrian signals, ADA ramps, and curb and gutter. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,452,499 ·
Apr 25, 2025 89852 TazewellDistrict 4 Sidewalk construction at various locations in the City of Washington. — Executed Nov 25 New Stark Excavating, Inc. $791,727 ·
Jun 13, 2025 68J39 TazewellDistrict 4 1.4 miles of PCC Class B patching on Il Route 8 in Tazewell County. — Executed Nov 25 New G. M. Sipes Construction, Inc. $487,762 ·
Jun 13, 2025 68J42 TazewellDistrict 4 Bridge joints and bearing repairs SN 090-0043 over Mud Creek east of Morton, IL. — Executed Nov 25 New Stark Excavating, Inc. $547,991 ·
Jun 13, 2025 68J63 TazewellDistrict 4 Standard overlay and ADA ramp improvements on BUS 24/Peoria St/Walnut St from west of Wood St to east centerline of Washington in Tazewell County. 5,231 gross feet. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,166,199 ·
Jun 13, 2025 68J79 TazewellDistrict 4 Removal and replacement of traffic signal mast arm on US 24 (Main St) at Wesley Rd in Creve Coeur. — Executed Nov 25 New Laser Electric, Inc. $233,127 ·
Jun 13, 2025 89859 TazewellDistrict 4 Pavement reconstruction, sidewalk replacement, curb and gutter replacement, storm sewer, traffic signals and lighting on Court Street from 8th Street to 10th Street in Pekin. — Executed Nov 25 New William Charles Construction Company, LLC $4,930,196 ·
Sep 19, 2025 68K25 PeoriaTazewellDistrict 4 Installation of LED luminaries along I-74 on existing light towers, light poles, and inside tunnels from Knoxville Interchange in Peoria to Washington St. Interchange in East Peoria in Peoria and Tazewell Counties. — Executed Nov 25 New Gerstner Electric, Inc. $1,018,866 ·
Nov 7, 2025 89832 TazewellDistrict 4 Guardrail replacement on various routes in Tazewell, Peoria and Woodford Counties. Includes, curb and gutter, and pedestrian railing. — Executed Nov 25 New Lovewell Fencing, Inc. $2,498,941 ·
Jan 16, 2026 46939 TazewellDistrict 4 Removal and replacement of SN's 090-9922 and 090-9923, and resurfacing and rehabilitation of internal park roads and campgrounds at the Spring Lake State Fish and Wildlife Area in rural Tazewell County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $4,375,041 ·
Jan 16, 2026 68F92 TazewellDistrict 4 3.22 miles patching, resurfacing and traffic signals; from west of Grosenbach Road to east of Cummings Lane in Peoria County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $11,508,683 ·
Jan 16, 2026 68J43 TazewellDistrict 4 Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer on East Washington Street over Farm Creek in East Peoria. — Executed Nov 25 New Stark Excavating, Inc. $498,351 ·
Feb 27, 2026 68K56 TazewellDistrict 4 Bridge deck and approach pavement resurfacing, replacement of existing expansion joints, and all related collateral work necessary to complete the project located along IL Rte 9 over Prairie Creek in Tazewell County. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $239,981 ·
Apr 24, 2026 68J16 TazewellDistrict 4 Bridge joint replace and repair, bridge deck overlay, slope wall repair at SN 090-0152 carrying IL 40 ramp to I-74 WB in East Peoria in Tazewell County. — Executed Nov 25 New Stark Excavating, Inc. $478,751 ·
Apr 24, 2026 68J60 TazewellDistrict 4 5.86 miles of CIR and design overlay of IL 122 from 2.1 miles east of Hopedale to the McLean County line. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $8,241,332 ·
Apr 24, 2026 68K12 TazewellDistrict 4 5.656 gross miles of microsurfacing on I-474/US 24 from the Illinois River to I-74 in Tazewell County. — Executed Nov 25 New Beniach Construction Co., Inc. $2,076,981 ·
Apr 24, 2026 68K87 TazewellDistrict 4 Fence removal and replacement around Operations Yard in Morton. — Executed Nov 25 New CSD Environmental Services, Inc. $173,612 ·
Apr 24, 2026 68L05 TazewellDistrict 4 Building demolition at 600 Main St (Parcel No. 4ABL011) in East Peoria, Tazewell County. — Executed Nov 25 New JIMAX Landscape LLC $72,493 ·
Apr 24, 2026 72443 LoganTazewellDistrict 6 2 miles of resurfacing on Armington Road (US 136 Spur) from East Third Street in Armington to north of US 136. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $624,204 ·
Apr 24, 2026 89898 TazewellDistrict 4 Resurfacing on Broadway Road from Springfield Road to the I-55 Interchange. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $2,149,810 ·
Jun 12, 2026 68J15 TazewellDistrict 4 Bridge deck overlay, joint replacement/repairs and bridge approach roadway improvements at S.N. 090-0124 carrying WB BUS 24 over US 24 near_Washington and resurface BUS 24 from US 24 to IL 8 in Tazewell County. 1.430 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $5,373,982 ·
Jun 12, 2026 68J31 TazewellDistrict 4 Resurface IL 98 from IL 29 to 0.2 mile East of Parkway Drive in Tazewell County. 1.3551 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,191,255 ·
Jun 12, 2026 68J59 TazewellDistrict 4 Resurfacing McMullen Rd and IL 122 from west of I-155 to 2.1 miles east of Hopedale, including cold-in-place recycling in Tazewell County. 5.086 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $9,263,926 ·
Jun 12, 2026 68K18 TazewellDistrict 4 Resurfacing US 24/IL 29 (Main St) from north of Wesley Rd to south of Poplar St in Creve Coeur in Tazewell County. 1.31 miles gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $3,147,460 ·
Jun 12, 2026 68K85 PeoriaTazewellWarrenDistrict 4 Replacement of traffic signal heads and vehicle detection at various locations in Peoria, East Peoria, Washington, and Monmouth in Peoria, Tazewell, and Warren Counties. — Executed Nov 25 New Oberlander Electric Co. $790,676 ·
Jun 12, 2026 68K93 PeoriaTazewellDistrict 4 Relocation of high mast light towers to new foundations on I-74 in Peoria and Tazewell Counties. — Executed Nov 25 New Oberlander Electric Co. $1,451,503 ·
Jun 12, 2026 68K96 TazewellDistrict 4 Partial and full depth HMA patching on Morton Ave from north of Clark St to Jackson St (US 150) in Morton. 0.205 mile gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $649,043 ·
Jul 31, 2026 68K27 TazewellWoodfordDistrict 4 Milling and resurfacing IL 26 from Spring Bay to NCL to IL Rte 116 in Tazewell and Woodford Counties. Approximately 6.87 miles gross length. — Executed Nov 25 New Advanced Asphalt Company $1,822,642 ·
Sep 18, 2026 68H60 TazewellDistrict 4 Converting the existing two-way stop controlled condition to all-way stop control with red-flashing beacons, stop ahead signs with dual flashing beacons, lighting upgrades, widening the radii at the intersection, construction of 4-foot wide Hot-Mix Asphalt shoulder along the curve radii with 2-foot aggregate wedge shoulders, new pavement marking, removing and replacing an 18-inch pipe culvert and related collateral work necessary to complete the project. This project is located at the intersecti — Executed Nov 25 New Otto Baum Company, Inc. $649,800 ·
101–141 of 141‹ Prev

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.