Filtered by: County: Pike Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 72K30 | PikeDistrict 6 | Cleaning and painting two bridges on IL 96 in Pike County. | — | Executed | All States Painting, Inc. $158,000 · | ||
| Jan 19, 2018 | 93710 | PikeDistrict 6 | Resurfacing CH 7 from the city limits of Pittsfield south to 195th Avenue. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,085,681 · | ||
| Mar 9, 2018 | 72K26 | PikeDistrict 6 | 7 miles of crack and joint sealing on I-72 from east of Hull to west of Barry. | — | Executed | Complete Asphalt Service Co. $34,632 · | ||
| Apr 27, 2018 | 72K50 | PikeScottDistrict 6 | Class D and partial depth HMA patching on I-72 from east of Hull to west of Barry in Pike County, and from east of the Illinois River Bridges to IL 100 in Scott County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $593,997 · | ||
| Jun 15, 2018 | 72K54 | PikeDistrict 6 | Deck and substructure repairs on 3 bridges: 1) SN 075-0089 carrying IL 96 over I-72 at the Hull interchange; 2) Sn 075-0103 carrying CH 4 over I-72 at the Barry interchange; 3) SN 075-0112 carrying IL 107 over I-72 north of Pittsfield. | — | Executed | Freesen, a div of UCM, Inc. $299,480 · | ||
| Nov 9, 2018 | 72J98 | PikeDistrict 6 | 3.6 miles of pavement patching, HMA surface removal, HMA resurfacing and bridge repairs on I-72 from the Sny Slough structures to east of the Trumpet Interchange at I-172. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $4,455,235 · | ||
| Nov 9, 2018 | 72K66 | PikeDistrict 6 | Bride joint repairs, base course widening, resurfacing and traffic control setup on I-72 approximately 1.8 miles northwest of Barry (SN 075-0098, 0099). | — | Executed | Freesen, a div of UCM, Inc. $1,184,709 · | ||
| Mar 8, 2019 | 72K75 | AdamsHancockPikeDistrict 6 | Painting portions of five bridges on various routes in Adams, Hancock, and Pike Counties (SN 001-0052, 001-0069, 034-0065, 075-0133, 075-0134) | — | Rejected | Venus Painting Co. $246,000 · | ||
| Apr 26, 2019 | 72K65 | PikeDistrict 6 | Painting portions of two bridges on I-72, 1.8 miles west of Barry. (SN 075-0098 and 075-0099). | — | Executed | Thomas Industrial Coatings, Inc. $274,171 · | ||
| Jun 14, 2019 | 72K88 | AdamsPikeDistrict 6 | Insertion culvert liners at various locations on IL 57 and IL 96. | — | Executed | County Contractors, Inc. $58,010 · | ||
| Jun 14, 2019 | 72L19 | PikeDistrict 6 | Deck patching on SN 075-0081 carrying IL 104 over McKee Creek at the east edge of Chambersburg. | — | Executed | County Contractors, Inc. $86,995 · | ||
| Jun 14, 2019 | 93730 | PikeDistrict 6 | Replace the bridge carrying CH 4 over Kiser Creek, 2.8 miles southwest of Barry. | — | Executed | County Contractors, Inc. $1,622,768 · | ||
| Nov 8, 2019 | 72L40 | PikeDistrict 6 | 0.56 miles of HMA surface removal and replacement on County Highway 3 from just south of I-72 to just north of I-72. | — | Executed | K. E. Vas Company $349,729 · | ||
| Mar 6, 2020 | 72H83 | PikeDistrict 6 | Resurfacing, ADA ramp improvements, signal improvements and geometric design improvements on US 54 / IL 106 through Pittsfield. Also includes pavement patching at the Pittsfield Weigh Station. | — | Rejected | Illinois Valley Paving, a div of UCM, Inc. $5,288,738 · | ||
| Apr 24, 2020 | 72L61 | BrownPikeDistrict 6 | Culvert replacement from 1.8 miles north of the Brown / Pike County line to 0.5 miles south of the Brown / Pike County line. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $79,521 · | ||
| Apr 24, 2020 | 72L68 | PikeDistrict 6 | Drainage improvements and patching on IL 106 from IL 96 to 0.1 miles east of IL 96. | — | Executed | County Contractors, Inc. $68,360 · | ||
| Apr 24, 2020 | 93742 | PikeDistrict 6 | Bituminous surface treatment on various routes throughout Pike County. | — | Rejected | |||
| Jun 12, 2020 | 72L56 | PikeDistrict 6 | Painting SN 075-0036 carrying IL 96 over Hadley Creek, 0.5 miles south of Kinderhook. | — | Executed | ERA-Valdivia Contractors, Inc. $129,250 · | ||
| Jun 12, 2020 | 72L83 | PikeDistrict 6 | Repairing and sealing parapets on SN 075-0123 carrying I-72 westbound over the Illinois River, | — | Executed | Freesen, a div of UCM, Inc. $496,936 · | ||
| Jun 12, 2020 | 72M03 | PikeDistrict 6 | Patching on I-72 from I-172 to IL 96. | — | Executed | G. M. Sipes Construction, Inc. $517,995 · | ||
| Nov 6, 2020 | 72M44 | PikeDistrict 6 | Patching on I-72 from east of the Trumpet Interchange to west of Hull. | — | Executed | G. M. Sipes Construction, Inc. $348,629 · | ||
| Jan 15, 2021 | 72L92 | PikeDistrict 6 | 4.4 miles of crack and joint sealing on US 54 from 0.1 miles north of North Monroe Street in Pittsfield to I-72. | — | Executed | Complete Asphalt Service Co. $15,980 · | ||
| Jan 15, 2021 | 72M42 | PikeDistrict 6 | Bridge washing and concrete sealing on various bridges in Pike County and expansion joint replacement on the Valley City Eagle Bridges carrying I-72 over the Illinois River. (SN 069-0525, SN 075-0098, SN 075-0099, SN 075-0122, and SN 075-0123) | — | Executed | White Construction LLC $315,819 · | ||
| Mar 5, 2021 | 72L66 | PikeDistrict 6 | HMA resurfacing, HMA shoulders, pipe underdrain replacement and bridge repairs on I-72 from east of the US 54 / IL 107 interchange to 0.6 miles east of the 290th Avenue overhead. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $12,650,334 · | ||
| Apr 23, 2021 | 93768 | PikeDistrict 6 | Bituminous surface treatment at various locatinos in Pike County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,614,284 · | ||
| Jun 11, 2021 | 72M77 | PikeDistrict 6 | Deck patching on SN 075-0098 and SN 075 075-0099 carrying I-72 over Norfolk Southern Railroad, 1.5 miles west of the Barry Interchange. | — | Executed | Freesen, a div of UCM, Inc. $556,101 · | ||
| Sep 17, 2021 | 72N16 | PikeDistrict 6 | Cured-in-place pipe liners on IL 96 in Atlas. | — | Executed | Phoenix Corporation of the Quad Cities $163,615 · | ||
| Jan 21, 2022 | 72M27 | PikeDistrict 6 | Bridge deck overlay on IL 96 over Two Mile Creek, 1.6 miles south of US 54, and on IL 96 over Six Mile Creek, 1 mile northwest of Pleasant Hill. (SN 075-0075 and SN 075-0045) | — | Executed | Freesen, a div of UCM, Inc. $502,104 · | ||
| Jun 17, 2022 | 72N27 | BrownPikeDistrict 6 | Cured-in-place pipe liners on IL 107. | — | Executed | Phoenix Corporation of the Quad Cities $654,605 · | ||
| Jun 17, 2022 | 72N38 | PikeDistrict 6 | Bridge deck repairs on SN 075-0135 carrying IL 100 over Bee Creek, 0.4 miles north of the Calhoun County line. | — | Executed | County Contractors, Inc. $86,959 · | ||
| Aug 5, 2022 | 72205 | AdamsPikeDistrict 6 | Class A Patches from 1 This project consists of Class A Patches from 1.5 mile north of the Adams/Pike County line 101 mile east of IL 96. | — | Executed | G. M. Sipes Construction, Inc. $349,600 · | ||
| Nov 18, 2022 | 72N48 | PikeDistrict 6 | 0.08 miles, Concrete microsilica overlay of bridge deck and approach pavements, Kiser Creek 4.5 miles East of CH 4 in Barry. | — | Executed | Freesen, a div of UCM, Inc. $452,663 · | ||
| Nov 18, 2022 | 72N49 | PikeDistrict 6 | 0.47 miles, Concrete microsilica overlay of bridge decks and HMA overlay of approach pavements, Walnut Creek Ditch and Pigeon Creek 2.2 and 2.5 miles West of IL 96. | — | Executed | Freesen, a div of UCM, Inc. $3,754,547 · | ||
| Jan 20, 2023 | 72550 | PikeDistrict 6 | 2.5 miles of standard overlay, drainage improvements, patching and guardrail replacement on IL 106 from 1.1 miles east of East Branch Kiser Creek to US 54 west of Pittsfield. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,944,538 · | ||
| Jan 20, 2023 | 93798 | PikeDistrict 6 | Full Depth Reclamation and resurfacing with aggregate wedge shoulders, sidewalk, storm sewer, and pavement markings on CH 2 from CH 3 in New Salem to IL 107. | — | Executed | Diamond Construction Company $3,489,688 · | ||
| Aug 4, 2023 | 72711 | PikeDistrict 6 | Deck patching and expansion joint repairs on SN 075-0047 and SN 075-0048 carrying IL 96 over KCS Railroad and 6 Mile Bay Diversion, southeast of Pleasant Hill. | — | Executed | Freesen, a div of UCM, Inc. $459,690 · | ||
| Aug 4, 2023 | 72712 | PikeDistrict 6 | Deck patching and expansion joint repair on SN 075-0155 carrying IL 106 over I-72 at the IL 106 and I-72 interchange, 1.2 miles east of the Missouri state line. | — | Executed | Freesen, a div of UCM, Inc. $140,703 · | ||
| Aug 4, 2023 | 72713 | PikeDistrict 6 | Patching on I-72, IL 110 from the Mississippi River to the Sny Slough. | — | Executed | G. M. Sipes Construction, Inc. $109,346 · | ||
| Nov 17, 2023 | 72717 | BrownPikeDistrict 6 | Spray-applied pipe liner on IL 107 in Brown and Pike Counties. | — | Executed | Hoerr Construction, Inc. $567,640 · | ||
| Mar 8, 2024 | 93815 | PikeDistrict 6 | Replace existing structure with a three-span PPC deck beam structure, with aggregate approach pavement, shoulder widening and traffic barrier terminals on Union Street over Spring Creek in Nebo. | — | Executed | County Contractors, Inc. $943,320 · | ||
| Apr 26, 2024 | 72223 | PikeDistrict 6 | Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook. | — | Executed | County Contractors, Inc. $969,518 · | ||
| Jun 14, 2024 | 72284 | PikeDistrict 6 | 24.4 miles of patching the right wheel path of driving lane on I-72 from 0.9 miles east of IL 96 to 0.4 miles east of US 54/IL 107. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,019,260 · | ||
| Jun 14, 2024 | 72739 | PikeDistrict 6 | Bridge bearing replacement at SN 075-0080 carrying US 54 over The Sny, 1 mile southwest of IL 96. | — | Executed | Sangamo Construction Company $87,177 · | ||
| Sep 20, 2024 | 72627 | PikeDistrict 6 | Pipe culvert removal and replacement on IL 106, 1 mile north of US 54. | — | Executed | Phoenix Corporation of the Quad Cities $61,515 · | ||
| Nov 8, 2024 | 72649 | PikeDistrict 6 | Bridge painting on SN 075-0080 carrying US 54 over The Sny, 0.9 miles south of IL 96. | — | Executed | Civil Coatings and Construction Inc. $173,018 · | ||
| Jan 17, 2025 | 72747 | PikeDistrict 6 | Bridge deck patching and joint repairs on SN 075-0038 carrying IL 96 over Kiser Creek at New Canton. | — | Executed | County Contractors, Inc. $272,212 · | ||
| Jan 17, 2025 | 72878 | PikeDistrict 6 | 6.3 miles of crack and joint seal on I-72 from 0.4 miles east of the US 54/IL 107 interchange to the Scott County line. | — | Executed | Freehill Asphalt, Inc. $83,522 · | ||
| Jan 17, 2025 | 72934 | AdamsPikeDistrict 6 | Patching on I-72, I-172 from 1.5 miles north of the Adams/Pike County line to 1 mile east of IL 96. | — | Executed | G. M. Sipes Construction, Inc. $396,340 · | ||
| Mar 7, 2025 | 72736 | PikeDistrict 6 | Installation of a virtual weigh-in-motion system on eastbound I-72 from 0.6 miles west of CH 3 and proceeding for 300- to the east. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $1,392,377 · | ||
| Apr 25, 2025 | 93829 | PikeDistrict 6 | Construct a single-span PPC deck beam bridge to carry TR 424B over Blue Creek in Pike County. Includes; Aggregate roadway reconstruction and channel excavation. | — | Executed | County Contractors, Inc. $391,972 · | ||
| Jun 13, 2025 | 72623 | PikeDistrict 6 | Shoulder repairs on I-72 from the Trumpet Interchange to 0.8 miles east of IL 96, east of Hull. , Cured-in-place liner and pipe culvert removal and replacement on IL 4 / Veterans Parkway in Springfield. | — | Executed | Diamond Construction Company $648,506 · | ||
| Jun 13, 2025 | 72M61 | AdamsPikeDistrict 6 | 11 miles of resurfacing with widening, gutter, guardrail and culvert replacement on IL 104 from 1.8 miles west of the Pike County line to IL 107. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $14,071,885 · | ||
| Sep 19, 2025 | 72286 | PikeDistrict 6 | Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange. | — | Executed | Freesen, a div of UCM, Inc. $5,360,782 · | ||
| Sep 19, 2025 | 72M33 | PikeDistrict 6 | Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange. | — | Executed | Freesen, a div of UCM, Inc. $2,292,624 · | ||
| Nov 7, 2025 | 93847 | PikeDistrict 6 | HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting. | — | Executed | Rees Construction Company of Quincy $5,451,649 · | ||
| Jan 16, 2026 | 72307 | PikeDistrict 6 | 9.2 miles of partial depth pavement patching, resurfacing, HMA shoulders, concrete gutter replacement and guardrail updates on IL 107 from the Brown County line to north of Franklin Street in Griggsville. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $7,106,857 · | ||
| Jan 16, 2026 | 72A25 | PikeScottDistrict 6 | Painting portions of four bridges on I-72. (SN 075-0083, 075-0112, 086-0037 and 086-0038) | — | Executed | Three Star Painting, Inc. $559,150 · | ||
| Jan 16, 2026 | 72D12 | PikeScottDistrict 6 | 1.4 miles of tree removal for the new Illinois River Bridge in Florence. | — | Rejected | |||
| Feb 27, 2026 | 93853 | PikeDistrict 6 | Full-depth reclamation and resurfacing Cold-in-place recycling and HMA resurfacing of CH 2 and a portion of CH 14 in Pike County. A portion of CH 14 will also consist of full-depth reclamation and resurfacing. Work also includes aggregate shoulders, guardrail, pavement markings and other required work. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,678,290 · | ||
| Apr 24, 2026 | 72511 | PikeDistrict 6 | Bridge deck patching and curb repairs on SN 075-0139 carrying IL 96 over Walnut Creek, 0.8 miles north of I-72 at the Hull interchange. | — | Executed | County Contractors, Inc. $130,630 · | ||
| Jun 12, 2026 | 72459 | PikeDistrict 6 | 6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders and aggregate wedge shoulders on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,193,703 · | ||
| Jun 12, 2026 | 72601 | PikeDistrict 6 | Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange. | — | Executed | Freesen, a div of UCM, Inc. $6,980,801 · | ||
| Jun 12, 2026 | 72639 | AdamsPikeDistrict 6 | 9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and on I-172 from I-72 to 0.9 miles south of IL 57. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $9,677,201 · | ||
| Jul 31, 2026 | 72E81 | HancockPikeDistrict 6 | ITS expansion in Hancock and Pike Counties. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $279,735 · | ||
| Jul 31, 2026 | 72J44 | BrownPikeDistrict 6 | 6.4 miles of milling and resurfacing, storm sewer replacement, bridge repairs and guardrail upgrades on IL 99 from south of Versailles northern city limits to Mckee Drainage Ditch, 0.1 miles north of IL 104. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $8,178,851 · |
1–65 of 65
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.