IDOT Jobs

All dates · 65 jobs · — Sign up free
★ My Jobs

Filtered by: County: Pike Clear all

65 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 72K30 PikeDistrict 6 Cleaning and painting two bridges on IL 96 in Pike County. — Executed Nov 26 New All States Painting, Inc. $158,000 ·
Jan 19, 2018 93710 PikeDistrict 6 Resurfacing CH 7 from the city limits of Pittsfield south to 195th Avenue. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,085,681 ·
Mar 9, 2018 72K26 PikeDistrict 6 7 miles of crack and joint sealing on I-72 from east of Hull to west of Barry. — Executed Nov 26 New Complete Asphalt Service Co. $34,632 ·
Apr 27, 2018 72K50 PikeScottDistrict 6 Class D and partial depth HMA patching on I-72 from east of Hull to west of Barry in Pike County, and from east of the Illinois River Bridges to IL 100 in Scott County. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $593,997 ·
Jun 15, 2018 72K54 PikeDistrict 6 Deck and substructure repairs on 3 bridges: 1) SN 075-0089 carrying IL 96 over I-72 at the Hull interchange; 2) Sn 075-0103 carrying CH 4 over I-72 at the Barry interchange; 3) SN 075-0112 carrying IL 107 over I-72 north of Pittsfield. — Executed Nov 26 New Freesen, a div of UCM, Inc. $299,480 ·
Nov 9, 2018 72J98 PikeDistrict 6 3.6 miles of pavement patching, HMA surface removal, HMA resurfacing and bridge repairs on I-72 from the Sny Slough structures to east of the Trumpet Interchange at I-172. — Rejected Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,455,235 ·
Nov 9, 2018 72K66 PikeDistrict 6 Bride joint repairs, base course widening, resurfacing and traffic control setup on I-72 approximately 1.8 miles northwest of Barry (SN 075-0098, 0099). — Executed Nov 26 New Freesen, a div of UCM, Inc. $1,184,709 ·
Mar 8, 2019 72K75 AdamsHancockPikeDistrict 6 Painting portions of five bridges on various routes in Adams, Hancock, and Pike Counties (SN 001-0052, 001-0069, 034-0065, 075-0133, 075-0134) — Rejected Nov 26 New Venus Painting Co. $246,000 ·
Apr 26, 2019 72K65 PikeDistrict 6 Painting portions of two bridges on I-72, 1.8 miles west of Barry. (SN 075-0098 and 075-0099). — Executed Nov 26 New Thomas Industrial Coatings, Inc. $274,171 ·
Jun 14, 2019 72K88 AdamsPikeDistrict 6 Insertion culvert liners at various locations on IL 57 and IL 96. — Executed Nov 26 New County Contractors, Inc. $58,010 ·
Jun 14, 2019 72L19 PikeDistrict 6 Deck patching on SN 075-0081 carrying IL 104 over McKee Creek at the east edge of Chambersburg. — Executed Nov 26 New County Contractors, Inc. $86,995 ·
Jun 14, 2019 93730 PikeDistrict 6 Replace the bridge carrying CH 4 over Kiser Creek, 2.8 miles southwest of Barry. — Executed Nov 26 New County Contractors, Inc. $1,622,768 ·
Nov 8, 2019 72L40 PikeDistrict 6 0.56 miles of HMA surface removal and replacement on County Highway 3 from just south of I-72 to just north of I-72. — Executed Nov 26 New K. E. Vas Company $349,729 ·
Mar 6, 2020 72H83 PikeDistrict 6 Resurfacing, ADA ramp improvements, signal improvements and geometric design improvements on US 54 / IL 106 through Pittsfield. Also includes pavement patching at the Pittsfield Weigh Station. — Rejected Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $5,288,738 ·
Apr 24, 2020 72L61 BrownPikeDistrict 6 Culvert replacement from 1.8 miles north of the Brown / Pike County line to 0.5 miles south of the Brown / Pike County line. — Executed Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $79,521 ·
Apr 24, 2020 72L68 PikeDistrict 6 Drainage improvements and patching on IL 106 from IL 96 to 0.1 miles east of IL 96. — Executed Nov 26 New County Contractors, Inc. $68,360 ·
Apr 24, 2020 93742 PikeDistrict 6 Bituminous surface treatment on various routes throughout Pike County. — Rejected Nov 26 New
Jun 12, 2020 72L56 PikeDistrict 6 Painting SN 075-0036 carrying IL 96 over Hadley Creek, 0.5 miles south of Kinderhook. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $129,250 ·
Jun 12, 2020 72L83 PikeDistrict 6 Repairing and sealing parapets on SN 075-0123 carrying I-72 westbound over the Illinois River, — Executed Nov 26 New Freesen, a div of UCM, Inc. $496,936 ·
Jun 12, 2020 72M03 PikeDistrict 6 Patching on I-72 from I-172 to IL 96. — Executed Nov 26 New G. M. Sipes Construction, Inc. $517,995 ·
Nov 6, 2020 72M44 PikeDistrict 6 Patching on I-72 from east of the Trumpet Interchange to west of Hull. — Executed Nov 26 New G. M. Sipes Construction, Inc. $348,629 ·
Jan 15, 2021 72L92 PikeDistrict 6 4.4 miles of crack and joint sealing on US 54 from 0.1 miles north of North Monroe Street in Pittsfield to I-72. — Executed Nov 26 New Complete Asphalt Service Co. $15,980 ·
Jan 15, 2021 72M42 PikeDistrict 6 Bridge washing and concrete sealing on various bridges in Pike County and expansion joint replacement on the Valley City Eagle Bridges carrying I-72 over the Illinois River. (SN 069-0525, SN 075-0098, SN 075-0099, SN 075-0122, and SN 075-0123) — Executed Nov 26 New White Construction LLC $315,819 ·
Mar 5, 2021 72L66 PikeDistrict 6 HMA resurfacing, HMA shoulders, pipe underdrain replacement and bridge repairs on I-72 from east of the US 54 / IL 107 interchange to 0.6 miles east of the 290th Avenue overhead. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $12,650,334 ·
Apr 23, 2021 93768 PikeDistrict 6 Bituminous surface treatment at various locatinos in Pike County. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,614,284 ·
Jun 11, 2021 72M77 PikeDistrict 6 Deck patching on SN 075-0098 and SN 075 075-0099 carrying I-72 over Norfolk Southern Railroad, 1.5 miles west of the Barry Interchange. — Executed Nov 26 New Freesen, a div of UCM, Inc. $556,101 ·
Sep 17, 2021 72N16 PikeDistrict 6 Cured-in-place pipe liners on IL 96 in Atlas. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $163,615 ·
Jan 21, 2022 72M27 PikeDistrict 6 Bridge deck overlay on IL 96 over Two Mile Creek, 1.6 miles south of US 54, and on IL 96 over Six Mile Creek, 1 mile northwest of Pleasant Hill. (SN 075-0075 and SN 075-0045) — Executed Nov 26 New Freesen, a div of UCM, Inc. $502,104 ·
Jun 17, 2022 72N27 BrownPikeDistrict 6 Cured-in-place pipe liners on IL 107. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $654,605 ·
Jun 17, 2022 72N38 PikeDistrict 6 Bridge deck repairs on SN 075-0135 carrying IL 100 over Bee Creek, 0.4 miles north of the Calhoun County line. — Executed Nov 26 New County Contractors, Inc. $86,959 ·
Aug 5, 2022 72205 AdamsPikeDistrict 6 Class A Patches from 1 This project consists of Class A Patches from 1.5 mile north of the Adams/Pike County line 101 mile east of IL 96. — Executed Nov 26 New G. M. Sipes Construction, Inc. $349,600 ·
Nov 18, 2022 72N48 PikeDistrict 6 0.08 miles, Concrete microsilica overlay of bridge deck and approach pavements, Kiser Creek 4.5 miles East of CH 4 in Barry. — Executed Nov 26 New Freesen, a div of UCM, Inc. $452,663 ·
Nov 18, 2022 72N49 PikeDistrict 6 0.47 miles, Concrete microsilica overlay of bridge decks and HMA overlay of approach pavements, Walnut Creek Ditch and Pigeon Creek 2.2 and 2.5 miles West of IL 96. — Executed Nov 26 New Freesen, a div of UCM, Inc. $3,754,547 ·
Jan 20, 2023 72550 PikeDistrict 6 2.5 miles of standard overlay, drainage improvements, patching and guardrail replacement on IL 106 from 1.1 miles east of East Branch Kiser Creek to US 54 west of Pittsfield. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,944,538 ·
Jan 20, 2023 93798 PikeDistrict 6 Full Depth Reclamation and resurfacing with aggregate wedge shoulders, sidewalk, storm sewer, and pavement markings on CH 2 from CH 3 in New Salem to IL 107. — Executed Nov 26 New Diamond Construction Company $3,489,688 ·
Aug 4, 2023 72711 PikeDistrict 6 Deck patching and expansion joint repairs on SN 075-0047 and SN 075-0048 carrying IL 96 over KCS Railroad and 6 Mile Bay Diversion, southeast of Pleasant Hill. — Executed Nov 26 New Freesen, a div of UCM, Inc. $459,690 ·
Aug 4, 2023 72712 PikeDistrict 6 Deck patching and expansion joint repair on SN 075-0155 carrying IL 106 over I-72 at the IL 106 and I-72 interchange, 1.2 miles east of the Missouri state line. — Executed Nov 26 New Freesen, a div of UCM, Inc. $140,703 ·
Aug 4, 2023 72713 PikeDistrict 6 Patching on I-72, IL 110 from the Mississippi River to the Sny Slough. — Executed Nov 26 New G. M. Sipes Construction, Inc. $109,346 ·
Nov 17, 2023 72717 BrownPikeDistrict 6 Spray-applied pipe liner on IL 107 in Brown and Pike Counties. — Executed Nov 26 New Hoerr Construction, Inc. $567,640 ·
Mar 8, 2024 93815 PikeDistrict 6 Replace existing structure with a three-span PPC deck beam structure, with aggregate approach pavement, shoulder widening and traffic barrier terminals on Union Street over Spring Creek in Nebo. — Executed Nov 26 New County Contractors, Inc. $943,320 ·
Apr 26, 2024 72223 PikeDistrict 6 Bridge deck overlay, deck repairs, and joint replacement on SN 075-0036 carrying IL 96 over Hadley Creek, 0.7 miles south of the IL 106 Junction in Kinderhook. — Executed Nov 26 New County Contractors, Inc. $969,518 ·
Jun 14, 2024 72284 PikeDistrict 6 24.4 miles of patching the right wheel path of driving lane on I-72 from 0.9 miles east of IL 96 to 0.4 miles east of US 54/IL 107. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $2,019,260 ·
Jun 14, 2024 72739 PikeDistrict 6 Bridge bearing replacement at SN 075-0080 carrying US 54 over The Sny, 1 mile southwest of IL 96. — Executed Nov 26 New Sangamo Construction Company $87,177 ·
Sep 20, 2024 72627 PikeDistrict 6 Pipe culvert removal and replacement on IL 106, 1 mile north of US 54. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $61,515 ·
Nov 8, 2024 72649 PikeDistrict 6 Bridge painting on SN 075-0080 carrying US 54 over The Sny, 0.9 miles south of IL 96. — Executed Nov 26 New Civil Coatings and Construction Inc. $173,018 ·
Jan 17, 2025 72747 PikeDistrict 6 Bridge deck patching and joint repairs on SN 075-0038 carrying IL 96 over Kiser Creek at New Canton. — Executed Nov 25 New County Contractors, Inc. $272,212 ·
Jan 17, 2025 72878 PikeDistrict 6 6.3 miles of crack and joint seal on I-72 from 0.4 miles east of the US 54/IL 107 interchange to the Scott County line. — Executed Nov 25 New Freehill Asphalt, Inc. $83,522 ·
Jan 17, 2025 72934 AdamsPikeDistrict 6 Patching on I-72, I-172 from 1.5 miles north of the Adams/Pike County line to 1 mile east of IL 96. — Executed Nov 25 New G. M. Sipes Construction, Inc. $396,340 ·
Mar 7, 2025 72736 PikeDistrict 6 Installation of a virtual weigh-in-motion system on eastbound I-72 from 0.6 miles west of CH 3 and proceeding for 300- to the east. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $1,392,377 ·
Apr 25, 2025 93829 PikeDistrict 6 Construct a single-span PPC deck beam bridge to carry TR 424B over Blue Creek in Pike County. Includes; Aggregate roadway reconstruction and channel excavation. — Executed Nov 25 New County Contractors, Inc. $391,972 ·
Jun 13, 2025 72623 PikeDistrict 6 Shoulder repairs on I-72 from the Trumpet Interchange to 0.8 miles east of IL 96, east of Hull. , Cured-in-place liner and pipe culvert removal and replacement on IL 4 / Veterans Parkway in Springfield. — Executed Nov 25 New Diamond Construction Company $648,506 ·
Jun 13, 2025 72M61 AdamsPikeDistrict 6 11 miles of resurfacing with widening, gutter, guardrail and culvert replacement on IL 104 from 1.8 miles west of the Pike County line to IL 107. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $14,071,885 ·
Sep 19, 2025 72286 PikeDistrict 6 Bridge deck overlay and bridge deck painting on various structures on I-72: (SN 075-0090 and 0091) over McCraney Creek 1.8 miles east of the IL 96/Hull Interchange, (SN 075-0124 and 0125) over tributary to McCraney Creek 2.1 miles east of the IL 96/Hull interchange, (SN 075-0092) TR 52 (205th Street) overhead 2.2 miles east of the IL 96/Hull Interchange and (SN 075-0094 and 0095) over TR 62 (213th Street) 3.3 miles east of the IL 96/Hull Interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $5,360,782 ·
Sep 19, 2025 72M33 PikeDistrict 6 Bridge deck overlay on I-72 at Bay Creek, 0.9 miles west of CH 3 at the New Salem interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $2,292,624 ·
Nov 7, 2025 93847 PikeDistrict 6 HMA Resurfacing on N. Monroe Street, E. Adams Street, and Madison Street in Pittsfield. Includes; watermain, sidewalk, ADA ramps, storm sewer, and Lighting. — Executed Nov 25 New Rees Construction Company of Quincy $5,451,649 ·
Jan 16, 2026 72307 PikeDistrict 6 9.2 miles of partial depth pavement patching, resurfacing, HMA shoulders, concrete gutter replacement and guardrail updates on IL 107 from the Brown County line to north of Franklin Street in Griggsville. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $7,106,857 ·
Jan 16, 2026 72A25 PikeScottDistrict 6 Painting portions of four bridges on I-72. (SN 075-0083, 075-0112, 086-0037 and 086-0038) — Executed Nov 25 New Three Star Painting, Inc. $559,150 ·
Jan 16, 2026 72D12 PikeScottDistrict 6 1.4 miles of tree removal for the new Illinois River Bridge in Florence. — Rejected Nov 25 New
Feb 27, 2026 93853 PikeDistrict 6 Full-depth reclamation and resurfacing Cold-in-place recycling and HMA resurfacing of CH 2 and a portion of CH 14 in Pike County. A portion of CH 14 will also consist of full-depth reclamation and resurfacing. Work also includes aggregate shoulders, guardrail, pavement markings and other required work. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $5,678,290 ·
Apr 24, 2026 72511 PikeDistrict 6 Bridge deck patching and curb repairs on SN 075-0139 carrying IL 96 over Walnut Creek, 0.8 miles north of I-72 at the Hull interchange. — Executed Nov 25 New County Contractors, Inc. $130,630 ·
Jun 12, 2026 72459 PikeDistrict 6 6 miles of patching, HMA surface removal, HMA overlay, resurfacing HMA shoulders and aggregate wedge shoulders on IL 100 from 0.9 miles south of Oak Street in Milton to south of CH 10 (Vin Fiz Road) west of Pearl. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $3,193,703 ·
Jun 12, 2026 72601 PikeDistrict 6 Bridge deck overlay and bridge painting on SN 075-0098 and 075-0099 carrying I-72 over TR 92 (250th Street), NS Railroad, Hadley Creek and TR 149 (315th Street), 1.8 miles west of CH 4 at the Barry interchange. — Executed Nov 25 New Freesen, a div of UCM, Inc. $6,980,801 ·
Jun 12, 2026 72639 AdamsPikeDistrict 6 9.8 miles of shoulder repair on I-72 from I-172 to 0.9 miles east of IL 96 and on I-172 from I-72 to 0.9 miles south of IL 57. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $9,677,201 ·
Jul 31, 2026 72E81 HancockPikeDistrict 6 ITS expansion in Hancock and Pike Counties. — Executed Nov 25 New Capitol Construction Group, LLC d/b/a Egizii Electric $279,735 ·
Jul 31, 2026 72J44 BrownPikeDistrict 6 6.4 miles of milling and resurfacing, storm sewer replacement, bridge repairs and guardrail upgrades on IL 99 from south of Versailles northern city limits to Mckee Drainage Ditch, 0.1 miles north of IL 104. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $8,178,851 ·
1–65 of 65

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.