Filtered by: County: Peoria Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 68G59 | PeoriaDistrict 4 | Landscaping along 1-74 from Ellis Street in Peoria to the Illinois River. | — | Executed | Central Landscaping, LP $279,293 · | ||
| Jan 21, 2022 | 68G75 | PeoriaTazewellDistrict 4 | Repair and replace traffic signals, overhead lighting, and ITS facilities at various locations in East Peoria, Peoria, Pekin and Peoria County. | — | Executed | Oberlander Electric Co. $301,890 · | ||
| Mar 11, 2022 | 68G28 | PeoriaTazewellDistrict 4 | Crack and Joint Sealing on US 24/IL 9 from N of Pfeiffer Rd in Bartonville to 0.16 mi SW of IL 9 (E.) and on IL 29 from Margaret Drive in Creve Coeur to N of LaSalle BLVD in Marquette Heights. | — | Executed | Denler, Inc. $214,975 · | ||
| Apr 29, 2022 | 68G34 | PeoriaDistrict 4 | Microsurfacing (1-pass)on IL 116 from IL 78(N) in Farmington to Eden Road. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $553,862 · | ||
| Apr 29, 2022 | 89789 | PeoriaDistrict 4 | Full Depth pavement removal, PCC Pavement, Curb and Gutter, Pipe Underdrains, Storm Sewer, HMA Multi-Use Path, PCC Sidewalks, Pavement Markings, and Landscaping on Gleen Avenue between Sheridan Road and Knoxville Avenue (IL-140) . | — | Executed | Otto Baum Company, Inc. $5,288,286 · | ||
| Jun 17, 2022 | 68G69 | PeoriaDistrict 4 | Bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and This project consists of bridge repairs on SN 072-0148, including the replacement of the existing expansion joints with strip seals and plating all beam ends at both abutments along with other related work necessary to complete the project as shown in the plans and as described herein. Structure carrying Mossville Rd. over IL 6. | — | Executed | Stark Excavating, Inc. $278,003 · | ||
| Jun 17, 2022 | 68G72 | PeoriaDistrict 4 | Patching on IL 6 from US 150 to I-74. | — | Executed | Kinney Contractors, Inc. $627,541 · | ||
| Jul 15, 2022 | 68H07 | PeoriaDistrict 4 | Transverse and longitudinal partial-depth patching along IL 29 from North of Gardner Ln. to North of Lorentz Ave. in Peoria County. Total length is 2.45 miles. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $1,141,394 · | ||
| Jul 15, 2022 | 68H10 | PeoriaDistrict 4 | 1360 feet of PCC TY B Pavement Patching from Martin to Moss Avenue in Peoria. | — | Executed | G. M. Sipes Construction, Inc. $579,888 · | ||
| Aug 5, 2022 | 68H09 | PeoriaDistrict 4 | Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150). | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $204,296 · | ||
| Sep 23, 2022 | 68884 | PeoriaDistrict 4 | 909.3 FT., Bridge Replacements on I-474 over IL 116 (Plank Rd.) in Bellevue. | — | Executed | Stark Excavating, Inc. $11,025,102 · | ||
| Nov 18, 2022 | 68E32 | PeoriaDistrict 4 | The culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Project consists of the culvert rehabilitation of SN 072-2008, a double 10' x 10' box culvert, at Big Hollow Creek on US 150 (War Memorial) in Peoria. | — | Executed | Phoenix Corporation of the Quad Cities $329,174 · | ||
| Nov 18, 2022 | 68F38 | PeoriaTazewellDistrict 4 | Bridge Rehabilitation with bridge deck overlay, beam repairs, beam additions, navigation and roadway lighting, traffic signal improvements, drainage improvements, full depth pavement removal and replacement, sidewalk removals, multi-use path construction and related collateral work. Bob Michel Bridge (SN 090-0122) in Peoria and Tazewell Counties on IL 40 (William Kumpf Blvd.) over the Illinois River and Washington Street. | — | Executed | ICC Group Inc. $24,657,000 · |
1–13 of 13
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.