IDOT Jobs

2018 · 14 jobs · — Sign up free
★ My Jobs

Filtered by: County: Peoria Clear all

14 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 68B67 PeoriaDistrict 4 Resurfacing on US 24 from south of IL 9 to north of Pfeiffer Road and on IL 9 from US 24 to 0.27 miles east. — Executed Nov 26 New Advanced Asphalt Company $3,038,514 ·
Jan 19, 2018 89709 PeoriaDistrict 4 Reconstruction of Old Galena Road between Boy Scout Road and Cedar Hills Drive, including new traffic signals at Cedar Hills Drive. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,759,289 ·
Mar 9, 2018 68887 PeoriaDistrict 4 Bridge rehabilitation to structure numbers: 072-0127, 072-0128, 072-0129, 072-0130, 072-0131 and 072-0132. — Executed Nov 26 New Stark Excavating, Inc. $11,778,628 ·
Mar 9, 2018 68D15 PeoriaDistrict 4 Patching, resurfacing, ADA ramp improvements and signal upgrades on IL 40 from West Corrington Ave. to Pennsylavania Ave. in Peoria. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $2,429,480 ·
Mar 9, 2018 68D16 PeoriaTazewellDistrict 4 Resurfacing on I-74 from Washington St. to Muller Road, from Morton Ave. to Mainstreet, from Sterling Ave. to the Union Pacific Railroad structure. Also, resurfacing on I-474 Roadway A and B in Peoria. — Executed Nov 26 New Advanced Asphalt Company $6,988,434 ·
Mar 9, 2018 68E04 PeoriaPutnamTazewellDistrict 4 31 miles of crack and joint sealing on US 150, IL 26 and I-155. — Executed Nov 26 New Complete Asphalt Service Co. $164,160 ·
Mar 9, 2018 68E06 PeoriaDistrict 4 Landscaping along I-74 from Ellis Street in Peoria to the Illinois River. — Executed Nov 26 New Central Landscaping, LP $88,972 ·
Jun 15, 2018 68B59 KnoxPeoriaDistrict 4 Guardrail removal and culvert extensions at various locations on IL 8 and US 150, culvert replacement at Location 18 on US 150. — Executed Nov 26 New Illinois Civil Contractors, Inc. $1,589,198 ·
Jun 15, 2018 68E03 PeoriaDistrict 4 Installation of traffic signals and an eastbound left-turn lane at the intersection of US 24 and Cameron Lane (IL 9). — Executed Nov 26 New Oberlander Electric Co. $595,444 ·
Jun 15, 2018 68E15 PeoriaDistrict 4 2.7 miles of shoulder restoration along IL 6 from IL 40 to IL 29. — Rejected Nov 26 New
Jun 15, 2018 68E39 PeoriaTazewellDistrict 4 Installation of turn signals, luminaires, light poles, lighting controller and relocation of existing railroad interconnected traffic signal controller cabinet at various locations. — Executed Nov 26 New Laser Electric, Inc. $183,757 ·
Aug 3, 2018 68D96 PeoriaDistrict 4 Construction of an HMA parking lot with fence east of the District 4 materials lab, off US 150 in Edwards. — Rejected Nov 26 New
Sep 21, 2018 68E47 PeoriaDistrict 4 Scour mitigation at SN 072-0034 carrying IL 90 over Prince Run. — Executed Nov 26 New Illinois Civil Contractors, Inc. $155,436 ·
Nov 9, 2018 68185 PeoriaDistrict 4 Replacement of the structure carrying Farminton Road over Kickapoo Creek and reconstruction of the Farmington Road/Kickapoo Creek intersection, includes pavement improvements from west of the railroad tracks to west of Redbud Drive. — Executed Nov 26 New Stark Excavating, Inc. $10,061,876 ·
1–14 of 14

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.