Filtered by: County: Madison Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 20, 2023 | 76M87 | MadisonDistrict 8 | 5.7 miles of resurfacing and ADA upgrades on IL 159 / Troy Road from Center Grove Road to West Country Lane. | — | Executed | Christ Bros. Asphalt, Inc. $12,374,453 · | ||
| Jan 20, 2023 | 76P70 | MadisonDistrict 8 | Painting of SN 060-0185 carrying Meridian Road over I-270 in Glen Carbon. | — | Executed | Venus Painting Co. $490,150 · | ||
| Jan 20, 2023 | 76P99 | MadisonSt. ClairDistrict 8 | Chemical treatment of deep wells at various locations in East St. Louis and Venice. | — | Rejected | Layne Christensen Company $792,818 · | ||
| Jan 20, 2023 | 76R68 | MadisonDistrict 8 | Pavement patching on the ramps at I-255 and I-55/70 interchange. | — | Executed | Keeley & Sons, Inc. $396,963 · | ||
| Jan 20, 2023 | 76R70 | MadisonDistrict 8 | Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. | — | Executed | Christ Bros. Asphalt, Inc. $544,881 · | ||
| Jan 20, 2023 | 76R71 | MadisonDistrict 8 | Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. | — | Executed | Kinney Contractors, Inc. $516,396 · | ||
| Jan 20, 2023 | 97785 | MadisonDistrict 8 | Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. | — | Executed | Stutz Excavating, Inc. $1,291,558 · | ||
| Jan 20, 2023 | 97787 | MadisonDistrict 8 | Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. | — | Rejected | Baxmeyer Construction, Inc. $1,536,288 · | ||
| Mar 10, 2023 | 76N83 | MadisonDistrict 8 | 0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton. | — | Executed | Charles E. Mahoney Co. $1,689,154 · | ||
| Mar 10, 2023 | 76R81 | MadisonDistrict 8 | Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob. | — | Executed | Civil Coatings and Construction Inc. $631,797 · | ||
| Mar 10, 2023 | 76R87 | MadisonSt. ClairDistrict 8 | Dynamic message sign replacement at various locations in Madison and St. Clair Counties. | — | Rejected | Wissehr Electric, Inc. $587,933 · | ||
| Apr 28, 2023 | 76M82 | MadisonDistrict 8 | 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road. | — | Executed | The Kilian Corporation $3,603,769 · | ||
| Apr 28, 2023 | 76M83 | MadisonDistrict 8 | 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville. | — | Executed | Christ Bros. Asphalt, Inc. $8,186,958 · | ||
| Apr 28, 2023 | 76R63 | MadisonDistrict 8 | Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4. | — | Executed | Keeley & Sons, Inc. $1,048,120 · | ||
| Apr 28, 2023 | 76R90 | MadisonDistrict 8 | 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line. | — | Executed | Keeley & Sons, Inc. $589,483 · | ||
| Jun 16, 2023 | 76R40 | MadisonDistrict 8 | 10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road. | — | Executed | The Kilian Corporation $15,205,837 · | ||
| Jun 16, 2023 | 76R69 | MadisonDistrict 8 | Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange. | — | Executed | The Kilian Corporation $201,360 · | ||
| Jun 16, 2023 | 97713 | MadisonDistrict 8 | Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. | — | Executed | Keller Construction, Inc. $1,097,790 · | ||
| Jun 16, 2023 | 97801 | MadisonDistrict 8 | Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. | — | Executed | Stutz Excavating, Inc. $642,226 · | ||
| Jun 16, 2023 | 97806 | MadisonDistrict 8 | HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. | — | Executed | Stutz Excavating, Inc. $842,773 · | ||
| Aug 4, 2023 | 76P67 | MadisonSt. ClairDistrict 8 | Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. | — | Executed | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 · | ||
| Aug 4, 2023 | 76R27 | MadisonDistrict 8 | Lighting upgrades on I-55 at IL 140. | — | Executed | Gerstner Electric, Inc. $577,727 · | ||
| Aug 4, 2023 | 76R47 | MadisonDistrict 8 | Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. | — | Executed | Stutz Excavating, Inc. $143,115 · | ||
| Aug 4, 2023 | 76T09 | MadisonDistrict 8 | 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. | — | Executed | Christ Bros. Asphalt, Inc. $4,788,328 · | ||
| Aug 4, 2023 | 97811 | MadisonDistrict 8 | Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. | — | Executed | Baxmeyer Construction, Inc. $907,108 · | ||
| Sep 22, 2023 | 76R57 | MadisonSt. ClairDistrict 8 | Well treatment at various locations in East St. Louis and Venice. | — | Executed | Layne Christensen Company $856,535 · | ||
| Nov 17, 2023 | 46629 | MadisonSt. ClairDistrict 8 | Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. | — | Executed | Kujo, Inc. $358,351 · | ||
| Nov 17, 2023 | 76N16 | MadisonDistrict 8 | Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. | — | Executed | The Kilian Corporation $1,832,257 · | ||
| Nov 17, 2023 | 76N43 | MadisonDistrict 8 | Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. | — | Executed | Baxmeyer Construction, Inc. $7,285,268 · | ||
| Nov 17, 2023 | 97790 | MadisonDistrict 8 | Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. | — | Executed | Keller Construction, Inc. $17,444,384 · | ||
| Nov 17, 2023 | 97793 | MadisonDistrict 8 | Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. | — | Rejected | Keller Construction, Inc. $1,439,471 · | ||
| Nov 17, 2023 | 97822 | MadisonDistrict 8 | Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. | — | Executed | Charles E. Mahoney Co. $858,985 · |
1–32 of 32
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.