IDOT Jobs

2023 · 32 jobs · — Sign up free
★ My Jobs

Filtered by: County: Madison Clear all

32 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 20, 2023 76M87 MadisonDistrict 8 5.7 miles of resurfacing and ADA upgrades on IL 159 / Troy Road from Center Grove Road to West Country Lane. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $12,374,453 ·
Jan 20, 2023 76P70 MadisonDistrict 8 Painting of SN 060-0185 carrying Meridian Road over I-270 in Glen Carbon. — Executed Nov 26 New Venus Painting Co. $490,150 ·
Jan 20, 2023 76P99 MadisonSt. ClairDistrict 8 Chemical treatment of deep wells at various locations in East St. Louis and Venice. — Rejected Nov 26 New Layne Christensen Company $792,818 ·
Jan 20, 2023 76R68 MadisonDistrict 8 Pavement patching on the ramps at I-255 and I-55/70 interchange. — Executed Nov 26 New Keeley & Sons, Inc. $396,963 ·
Jan 20, 2023 76R70 MadisonDistrict 8 Partial and full depth patching on IL 160 from John Street in Grantfork to US 4. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $544,881 ·
Jan 20, 2023 76R71 MadisonDistrict 8 Partial and full depth patching on IL 3 from McKinley Bridge to New Poag Road. — Executed Nov 26 New Kinney Contractors, Inc. $516,396 ·
Jan 20, 2023 97785 MadisonDistrict 8 Reconstruct North Buchanan Street from East Union Street to Hillsboro Avenue in Edwaardsville. — Executed Nov 26 New Stutz Excavating, Inc. $1,291,558 ·
Jan 20, 2023 97787 MadisonDistrict 8 Reconstruction of clay Street from North Main Street to North Dewey Street in Troy. — Rejected Nov 26 New Baxmeyer Construction, Inc. $1,536,288 ·
Mar 10, 2023 76N83 MadisonDistrict 8 0.59 miles of standard overlay and ADA improvements on IL 140 from Monument Avenue to Terra Drive in Alton. — Executed Nov 26 New Charles E. Mahoney Co. $1,689,154 ·
Mar 10, 2023 76R81 MadisonDistrict 8 Bridge painting on SN 060-0210 carrying IL 4 over US 40 and a railroad, approximately 1.5 miles west of St. Jacob. — Executed Nov 26 New Civil Coatings and Construction Inc. $631,797 ·
Mar 10, 2023 76R87 MadisonSt. ClairDistrict 8 Dynamic message sign replacement at various locations in Madison and St. Clair Counties. — Rejected Nov 26 New Wissehr Electric, Inc. $587,933 ·
Apr 28, 2023 76M82 MadisonDistrict 8 1.7 miles of resurfacing and ADA improvements on IL 111 from 0.1 miles south of Pontoon Road to 0.1 miles south of Horseshoe Lake Road. — Executed Nov 26 New The Kilian Corporation $3,603,769 ·
Apr 28, 2023 76M83 MadisonDistrict 8 4.6 miles of resurfacing, ADA improvements and intersection improvements on IL 157 from St. Louis Street to South University Drive in Edwardsville. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $8,186,958 ·
Apr 28, 2023 76R63 MadisonDistrict 8 Bridge joint repair and replacement on SN 060-0077 carrying US 40 over Silver Creek, 1.6 miles west of IL 4. — Executed Nov 26 New Keeley & Sons, Inc. $1,048,120 ·
Apr 28, 2023 76R90 MadisonDistrict 8 19.6 miles of intermittent pavement patching on I-55 and its connecting ramps from I-270 to the Macoupin County line. — Executed Nov 26 New Keeley & Sons, Inc. $589,483 ·
Jun 16, 2023 76R40 MadisonDistrict 8 10 miles of resurfacing on IL 255 from IL 143 to 0.1 miles north of Seminary Road. — Executed Nov 26 New The Kilian Corporation $15,205,837 ·
Jun 16, 2023 76R69 MadisonDistrict 8 Patching on the I-270 eastbound collector distributor at the I-270 and I-255 interchange. — Executed Nov 26 New The Kilian Corporation $201,360 ·
Jun 16, 2023 97713 MadisonDistrict 8 Replace existing structure with a single span steel beam structure with poured concrete deck, aggregate approaches and guardrail on Silver Creek Road over a branch of Silver Creek. — Executed Nov 26 New Keller Construction, Inc. $1,097,790 ·
Jun 16, 2023 97801 MadisonDistrict 8 Construction of a Shared-Use Path along Rock Springs Drive from Memorial Drive to Brown Street, and along College Avenue at the intersection of Rock Springs Drive in Alton. — Executed Nov 26 New Stutz Excavating, Inc. $642,226 ·
Jun 16, 2023 97806 MadisonDistrict 8 HMA resurfacing, curb and gutter, driveways, storm sewers, and pavement markings on University Drive from IL 157 to Devon Court in Edwardsville. — Executed Nov 26 New Stutz Excavating, Inc. $842,773 ·
Aug 4, 2023 76P67 MadisonSt. ClairDistrict 8 Installation of 2 dynamic message signs on butterfly trusses and fiber optic on northbound I-255 at mile marker 7.6 and southbound I-255 at mile marker 27.1. — Executed Nov 26 New Keeley & Sons, Inc. and Wissehr Electric, Inc. JV $3,386,988 ·
Aug 4, 2023 76R27 MadisonDistrict 8 Lighting upgrades on I-55 at IL 140. — Executed Nov 26 New Gerstner Electric, Inc. $577,727 ·
Aug 4, 2023 76R47 MadisonDistrict 8 Median removal and replacement on US 67 (Landmark Boulevard), near the intersection of Broadway Street, in Alton. — Executed Nov 26 New Stutz Excavating, Inc. $143,115 ·
Aug 4, 2023 76T09 MadisonDistrict 8 9.6 miles of patching and resurfacing on IL 4 from 0.37 miles south of I-55 to IL 143. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $4,788,328 ·
Aug 4, 2023 97811 MadisonDistrict 8 Construction of a Shared-Use Path along Erwin Plegge Boulevard, from Old Bethalto Road to Ashbrook Street in Bethalto. — Executed Nov 26 New Baxmeyer Construction, Inc. $907,108 ·
Sep 22, 2023 76R57 MadisonSt. ClairDistrict 8 Well treatment at various locations in East St. Louis and Venice. — Executed Nov 26 New Layne Christensen Company $856,535 ·
Nov 17, 2023 46629 MadisonSt. ClairDistrict 8 Installation of new ground-mounted signs on various routes in Madison and St. Clair Counties. — Executed Nov 26 New Kujo, Inc. $358,351 ·
Nov 17, 2023 76N16 MadisonDistrict 8 Bridge repairs, flood wall work and pavement reconstruction on IL 11 over Cahokia Diversion Channel (SN 060-0121), 3 miles north of I-270. — Executed Nov 26 New The Kilian Corporation $1,832,257 ·
Nov 17, 2023 76N43 MadisonDistrict 8 Intersection reconstruction and ADA upgrades on IL 3 at 20th Street in Granite City. — Executed Nov 26 New Baxmeyer Construction, Inc. $7,285,268 ·
Nov 17, 2023 97790 MadisonDistrict 8 Reconstruction of Lebanon Road on new alignment to facilitate closure of two underpass structures. Work includes structure removal, construction of a 6-span steel plate girder bridge, construction of a 1-span PC slabl bridge, box culverts, pavement removal, building removal, processing lime modified soil, PPC Pavement, HMA Pavement, HMA shoulders, combination curb and gutter, and storm sewer. Located 0.19 miles east of Clay School Road to 0.16 miles of Locmann Road over the CSX Railroad. — Executed Nov 26 New Keller Construction, Inc. $17,444,384 ·
Nov 17, 2023 97793 MadisonDistrict 8 Reconstruction of the IL 159 and Glen Carbon Road intersection to establish north bound and east bound right turn lanes. Includes, HMA resurfacing, sidewalks, ADA ramps, traffic signal modifications, and drainage improvements. Located in Glen Carbon. — Rejected Nov 25 New Keller Construction, Inc. $1,439,471 ·
Nov 17, 2023 97822 MadisonDistrict 8 Resurfacing West Airline Drive from Main Street to 9th Street in East Alton. — Executed Nov 26 New Charles E. Mahoney Co. $858,985 ·
1–32 of 32

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.