IDOT Jobs

2022 · 11 jobs · — Sign up free
★ My Jobs

Filtered by: County: Livingston Clear all

11 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Mar 11, 2022 66L75 LivingstonDistrict 3 Latex overlay, expansion joint replacement and deck repairs on the structures structures SN 053-0124 and SN 053-0125 carrying I-55 over Rooks creek, 3 miles southwest of Pontiac in Livingston County. — Rejected Nov 26 New Tobey's Construction & Cartage, Inc. $1,906,501 ·
Mar 11, 2022 87773 LivingstonDistrict 3 Replace the bridge carrying TR 70 over Mud Creek, 2.5 miles southeast of Manville. — Executed Nov 26 New Tobey's Construction & Cartage, Inc. $406,355 ·
Mar 11, 2022 87774 LivingstonDistrict 3 Replace the bridge carrying TR 244 over Gooseberry Creek, 2.5 miles north of Emington. — Executed Nov 26 New Riber Construction, Inc. $388,075 ·
Mar 11, 2022 87775 LivingstonDistrict 3 Resurfacing Weston Road from 900N Road/McLean County Line to 1650N Road. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $2,085,137 ·
Apr 29, 2022 66L90 LivingstonDistrict 3 3P milling and resurfacing (designed overlay) This work is located at FAP 317 (US 24) 0.3 miles East of IL 47 in Forrest to Ford County Line in Livingston County (+/- 8.75 miles). This work consists of 3P milling and resurfacing (designed overlay). — Executed Nov 26 New Iroquois Paving Corporation $5,795,600 ·
Apr 29, 2022 66M46 LivingstonDistrict 3 Class A pavement patching and related construction work This work is located on FAI Route 55 (I-55) beginning at the McLean County Line (Mile Marker 187.87) and ending at Wolf-s creek, Structure No. 053-2506 (Mile Marker 206.12). This work consists of Class A pavement patching and related construction work. — Executed Nov 26 New G. M. Sipes Construction, Inc. $590,810 ·
Jun 17, 2022 66E53 LivingstonDistrict 3 Milling 3 Project consists of milling 3.50" and resurfacing 3.75" on IL 116, 100' East of the intersection of IL 23 in Pontiac for a total of 1.71 miles. The scope of work includes some traffic signal upgrades, pavement patching, ADA ramp improvements, and minor drainage maintenance work. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $2,680,230 ·
Jun 17, 2022 66K76 LivingstonDistrict 3 Milling and resurfacing (designed overlay) with ADA sidewalk work This work is located at FAP 326 (IL 47) from US 24 in Forrest to Ford County line in Livingston County (+/-9.35 miles). This work consists of milling and resurfacing (designed overlay) with ADA sidewalk work. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $6,277,406 ·
Jun 17, 2022 66M21 LivingstonDistrict 3 Cleaning all structural steel and other steel components of the structures This project is located at three structures: Structure No. 053-0123 carrying E1400N Rd. over I-55 and Mazon River, 3 miles Southwest of Pontiac; SN 053-0047 carrying IL 47 over Five Mile Creek, 0.3 miles North of IL 116; SN 053-0168 carrying IL 47 over the Vermilion River, 0.4 miles South of US 24. This project consists of cleaning all structural steel and other steel components of the structures. — Executed Nov 26 New Venus Painting Co. $710,553 ·
Jun 17, 2022 66M59 IroquoisLivingstonDistrict 3 At Buckley interchange; at Limestone rest area south of Pontiac Vegetation Control - Tree Removal. — Executed Nov 26 New CSD Environmental Services, Inc. $456,330 ·
Sep 23, 2022 66F92 LivingstonDistrict 3 Removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch The project consists of removal and replacement of the existing bridge (SN 053-0029) carrying IL 17 over Manville Drainage Ditch. The work also includes slope/ditch grading, guardrail upgrades, and resurfacing. The temporary steel support shall be salvaged from the existing structure. A detour will be used. — Executed Nov 26 New Riber Construction, Inc. $1,025,425 ·
1–11 of 11

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.