| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 74811 | LawrenceRichlandDistrict 7 | 12.8 miles of Class B pavement patching on US 50 between IL 130 and IL 250. | — | Executed | Kinney Contractors, Inc. $255,614 · | ||
| Aug 3, 2018 | 74834 | LawrenceDistrict 7 | Bridge repairs to SN 051-0053 carrying US 50 over the Embarras River east of Lawrence. | — | Executed | Keeley & Sons, Inc. $348,595 · | ||
| Nov 9, 2018 | 74619 | LawrenceDistrict 7 | Removal of SN 051-8000 on IL 1 approximately 1.5 miles south of Birds Road and replacing it with a cast-in-place double cell box culvert. | — | Executed | Allendale Gravel Co., Inc. $728,866 · | ||
| Jan 18, 2019 | 74177 | LawrenceDistrict 7 | Replacement of two structures on US 50 over an abandoned railroad and Otter Pond Ditch; and replacement of two superstructures on US 50 over IL 1 and CH 12 north of Lawrenceville (SN 051-0012, 0013, 0014, 0015). | — | Executed | Sangamo Construction Company $10,061,291 · | ||
| Jun 14, 2019 | 46529 | EffinghamLawrenceMaconDistrict 7 | New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County. | — | Executed | Bodine Electric of Decatur $230,811 · | ||
| Aug 2, 2019 | 74894 | LawrenceRichlandDistrict 7 | Replacing obsolete guardrail and terminals at various locations in Richland and Lawrence Counties. | — | Executed | Midwest Fence Corporation $970,709 · | ||
| Aug 2, 2019 | 95855 | LawrenceDistrict 7 | Replace the bridge carrying TR 285 over Big Slough Drainage Ditch, 1 mile southwest of St. Francisville. | — | Executed | Allendale Gravel Co., Inc. $368,062 · | ||
| Nov 8, 2019 | 74912 | LawrenceDistrict 7 | Concrete over lay of the bridge deck and bridge deck repairs on SN 051-0053 carrying US Business 50 over the Embarras River, east of Lawrenceville. | — | Executed | Samron Midwest Contracting, Inc. $1,037,945 · | ||
| Jan 17, 2020 | 74935 | ClayLawrenceRichlandDistrict 7 | Patching on US 45 from Finch Lane to US 50 and from U.S. 50 to the Wayne County line. Also includes patching along US 50, Xenia Road, west of Flora to Sumner. | — | Executed | Kinney Contractors, Inc. $556,669 · | ||
| Mar 6, 2020 | 74411 | LawrenceDistrict 7 | 10 miles of patching, milling, resurfacing, aggregate wedge shoulders, pipe culvert removal and box culvert extensions on IL 1 from Orchard Street in Lawrenceville to the Wabash County line. | — | Executed | Ambraw Asphalt Materials, Inc. $5,777,306 · | ||
| Mar 6, 2020 | 95867 | LawrenceDistrict 7 | Replace the bridge carrying TR 142 over Indian Creek, 2.0 miles east of Bridgeport. | — | Executed | Allendale Gravel Co., Inc. $544,393 · | ||
| Apr 24, 2020 | 74904 | LawrenceDistrict 7 | 5.9 miles of patching, milling, resurfacing, aggregate wedge shoulder and culvert replacement on IL 250 from US 50 in Sumner to 0.7 miles west of Bridgeport Road. | — | Executed | Ambraw Asphalt Materials, Inc. $3,711,052 · | ||
| Apr 24, 2020 | 74952 | LawrenceDistrict 7 | 4.8 miles of cape seal with bump removal and patching on US 50 from Beaver Pond Ditch to the Indiana state line. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $1,235,931 · | ||
| Jun 12, 2020 | 95876 | LawrenceDistrict 7 | Resurfacing Sand Barrens Lane from 250E Road to Bridgeport Road. | — | Executed | Ambraw Asphalt Materials, Inc. $2,137,594 · | ||
| Jan 15, 2021 | 95886 | LawrenceDistrict 7 | Replace the bridge carrying CH 8 over Raccoon Creek located 8.5 miles south of Bridgeport. | — | Executed | Samron Midwest Contracting, Inc. $538,450 · | ||
| Jan 15, 2021 | 95887 | LawrenceDistrict 7 | Replace the bridge carrying TR 266 over Taylor Ditch, located 2.5 miles southwest of Russellville. | — | Executed | Samron Midwest Contracting, Inc. $366,270 · | ||
| Apr 23, 2021 | 46928 | LawrenceDistrict 7 | Resurfacing internal park roads and parking lots, aggregate resurfacing of camp sites, drainage improvements, box culvert installation and lighting at the IDNR Red Fills State Park. | — | Executed | Ambraw Asphalt Materials, Inc. $2,721,190 · | ||
| Jun 11, 2021 | 95894 | LawrenceDistrict 7 | Replace the existing double barrel box culvert carrying CH 11 over a tributary to Raccoon Creek with a one span precast concrete deck beam bridge, located 6.0 miles southwwest of Bridgeport. | — | Executed | Depew and Owen Builders, Inc. $418,488 · | ||
| Jul 30, 2021 | 95904 | LawrenceDistrict 7 | Resurfacing, HMA shoulders, rumble strips and culvert replacement on FAS 1804 from 1150 North Road to Sun and Sand Road. | — | Executed | Ambraw Asphalt Materials, Inc. $1,263,794 · | ||
| Sep 17, 2021 | 74899 | LawrenceDistrict 7 | Tree removal along IL 33 from County Road 1300 to Westport. | — | Executed | Endrizzi Contracting, Inc $241,553 · | ||
| Jan 21, 2022 | 74440 | LawrenceDistrict 7 | Bridge deck replacement on US 50 over State Street in Lawrenceville. (SN 051-0010) | — | Executed | Sangamo Construction Company $1,868,239 · | ||
| Jan 21, 2022 | 74860 | LawrenceDistrict 7 | Replacing the structure carrying IL 1 over Big Slough, 5 miles south of Lawrenceville, with a triple barrel box. (SN 051-0008) | — | Executed | Kieffer Bros. Construction Co., Inc. $1,185,861 · | ||
| Jan 21, 2022 | 74A79 | LawrenceRichlandDistrict 7 | 10 miles of patching on US 50 from 0.6 miles west of Ste Marie Road to Sumner. | — | Executed | Piney Creek Construction & Repair $571,217 · | ||
| Jan 21, 2022 | 95906 | LawrenceDistrict 7 | Replace the bridge carrying TR 18 over Bugaboo Creek, 4.8 mies south of Chauncey. | — | Executed | Depew and Owen Builders, Inc. $520,888 · | ||
| Apr 29, 2022 | 74B13 | LawrenceDistrict 7 | 12.5 miles of resurfacing, aggregate wedge shoulders, and patching on IL 33 from the Crawford County line to Old US 50. | — | Executed | Ambraw Asphalt Materials, Inc. $2,951,194 · | ||
| Jun 17, 2022 | 74473 | LawrenceDistrict 7 | 1.2 miles of standard overlay, ADA updates and traffic signal improvements on IL 1 from Charles Street to Orchard Street. | — | Executed | Ambraw Asphalt Materials, Inc. $2,110,031 · | ||
| Apr 28, 2023 | 74B44 | LawrenceDistrict 7 | Tree removal on IL 33 from 0.5 miles north of US 50 to 0.5 miles south of US 50. | — | Executed | Endrizzi Contracting, Inc $448,125 · | ||
| Apr 28, 2023 | 95932 | LawrenceDistrict 7 | Replace existing pipe culverts with a single span precast deck beam bridge to carry 220 East Road over a tributary to Muddy Creek. | — | Executed | Lake Contracting, Inc. $709,450 · | ||
| Jun 16, 2023 | 95901 | LawrenceDistrict 7 | Replace existing structure with a thirteen-span PPC IL36N beam bridge with HMA approaches on Wabash Cannonball Road over the Wabash River overflow in St. Francisville. | — | Executed | Samron Midwest Contracting, Inc. $11,635,682 · | ||
| Jun 16, 2023 | 95937 | LawrenceDistrict 7 | HMA resurfacing with pip culvert replacement on Lancaster Road from Sand Barrens Lane to the Wabash County line. | — | Executed | Ambraw Asphalt Materials, Inc. $1,389,384 · | ||
| Jun 16, 2023 | 95938 | LawrenceDistrict 7 | Resurfacing on Lexington Avenue from IL 1 to 12th Street, and sidewalk improvements at four intersections in Lawrenceville. | — | Active | Kieffer Bros. Construction Co., Inc. $886,837 · | ||
| Sep 22, 2023 | 74359 | LawrenceDistrict 7 | Bridge replacement of SN 051-0007 carrying IL 1 over Indian Creek, 2 miles south of Lawrenceville. | — | Executed | Sangamo Construction Company $3,629,755 · | ||
| Jan 19, 2024 | 74A09 | LawrenceDistrict 7 | Superstructure and abutment replacement on SN 051-0022 and SN 051-0023 carrying US 50 over Township Road 262, 2.4 miles east of Airport Interchange. | — | Executed | Samron Midwest Contracting, Inc. $3,362,362 · | ||
| Apr 26, 2024 | 74443 | LawrenceDistrict 7 | Replacement of SN 051-0009 carrying US 50 over Muddy Creek, 0.5 miles east of Summer Road. | — | Executed | Sangamo Construction Company $3,650,480 · | ||
| Apr 26, 2024 | 74A08 | LawrenceRichlandDistrict 7 | 6.4 miles of resurfacing on US 50 from 4 miles west of the Lawrence County line to 0.2 miles east of IL 250. | — | Executed | Ambraw Asphalt Materials, Inc. $9,731,126 · | ||
| Apr 26, 2024 | 95931 | LawrenceDistrict 7 | Replace existing structure with a Three-Span PPC Deck Beam Bridge with HMA Approach on Applegate Road over Eagle Branch, 4 miles southeast of Chauncey. | — | Executed | Samron Midwest Contracting, Inc. $1,292,081 · | ||
| Apr 26, 2024 | 95954 | LawrenceDistrict 7 | Sidewalk constrution on Christy Avenue from North Railroad Street to Cedar Street, and Locust Street from May Street to Christy Avenue in Sumner. | — | Executed | Shores Builders, Inc. $289,794 · | ||
| Sep 20, 2024 | 74858 | LawrenceDistrict 7 | Bridge replacement (SN 051-0001) with a cast-in place box culvert carrying IL 1 over a stream, 0.3 miles north of Birds Road. | — | Executed | McCarthy Improvement Company $1,057,796 · | ||
| Jan 17, 2025 | 95970 | LawrenceDistrict 7 | Replace the bridge carrying Birds Lane over Mad Creek, 1 mile east of Chauncey. | — | Executed | Samron Midwest Contracting, Inc. $837,511 · | ||
| Mar 7, 2025 | 74A28 | LawrenceDistrict 7 | Bridge superstructure replacement on SN 051-0033 carrying US 50 frontage road over Allison Ditch, 2 miles east of the Airport Road interchange. | — | Executed | C-Hill Civil Contractors, Inc. $430,600 · | ||
| Mar 7, 2025 | 74C45 | LawrenceDistrict 7 | 10.2 miles of resurfacing on US 50 from 0.2 miles east of IL 250 to the Embarras River and on US 50 BUS from US 50 to IL 250/US 50 BUS in Lawrenceville. | — | Executed | Ambraw Asphalt Materials, Inc. $4,591,977 · | ||
| Apr 25, 2025 | 74C46 | LawrenceDistrict 7 | 2 miles of resurfacing, aggregate wedge shoulders and pavement patching on St. Francisville Spur from IL 1 to west of Hayes Road in St. Francisville. | — | Executed | Ambraw Asphalt Materials, Inc. $925,196 · | ||
| Sep 19, 2025 | 74164 | LawrenceDistrict 7 | Complete structure replacement of SN 051-0004 carrying IL 1 over the Embarras River Overflow approximately 1 mile north of US 50. | — | Executed | Sangamo Construction Company $21,455,785 · | ||
| Sep 19, 2025 | 74D31 | LawrenceDistrict 7 | Tree removal and tree installation along US 50 from 320E to 750E. | — | Active | Homer Tree Service, Inc. $526,741 · | ||
| Jan 16, 2026 | 74D36 | LawrenceDistrict 7 | Parking lot improvements at the Lawrenceville Maintenance Yard. | — | Executed | Samron Midwest Contracting, Inc. $198,545 · | ||
| Jan 16, 2026 | 95990 | LawrenceDistrict 7 | Construct a single span PPC deck beam bridge to carry Birds Lane over Brushy Fork. Includes HMA approach pavement and guardrail. | — | Executed | C-Hill Civil Contractors, Inc. $799,799 · | ||
| Feb 27, 2026 | 74D53 | LawrenceDistrict 7 | 5.5 miles of patching, milling and resurfacing on Old US 50 from US 50 Business to IL 33. | — | Executed | Ambraw Asphalt Materials, Inc. $3,649,451 · | ||
| Apr 24, 2026 | 74E20 | LawrenceDistrict 7 | 8.9 miles of patching on US 50 from the Embarrass River to IL 33 and on IL 33 from US 50 to 0.1 miles north of the Indiana state line. | — | Executed | Beniach Construction Co., Inc. $409,633 · | ||
| Apr 24, 2026 | 74E23 | CrawfordLawrenceDistrict 7 | Tree removal on IL 33 in Crawford and Lawrence Counties. | — | Executed | Wayne's Tree Service $322,207 · | ||
| Apr 24, 2026 | 95A07 | LawrenceDistrict 7 | Construct HMA shoulders with rumble strips, and replace the existing pipe culverts on Chauncey Road from Poland Lane to Trinity Lane. | — | Executed | Ambraw Asphalt Materials, Inc. $1,286,849 · | ||
| Sep 18, 2026 | 74D71 | LawrenceDistrict 7 | Bridge joint replacement, bridge deck overlay, bridge deck repairs and bridge approach improvements on SN 051-0056 carrying Old US 50 over Beaver Pond Ditch, 0.6 miles east of 1500E. | — | Executed | C-Hill Civil Contractors, Inc. $773,773 · |
1–51 of 51
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.