| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 17, 2025 | 61K91 | LakeDistrict 1 | Resurfacing Washington Avenue from Western Avenue to Sheridan Road in Highland. | — | Executed | Peter Baker & Son Co. $464,636 · | ||
| Jan 17, 2025 | 62W32 | LakeDistrict 1 | The installing scour countermeasures such as riprap erosion control and landscaping The improvement consists of the installing scour countermeasures such as riprap erosion control and landscaping. The project is located approximately 0.1 miles west of the Tri-State Tollway (I-94) and 1,100 ft east of Illinois Route 21 at SN 049-0046 and SN 049-0047 along Illinois Route 120 in the Village of Gurnee in Lake County. | — | Executed | Martam Construction Incorporated $617,286 · | ||
| Jan 17, 2025 | 62X49 | LakeDistrict 1 | A Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structur This improvement consists of a Bridge Painting of the existing structure (049-0171) carrying IL 59 over Rollins Road, the existing structure (049-0016) carrying Washington Road over US 41, and the existing structure (049-0097) carrying Washington Road over the UP RR in the Village of FOX Lake, and the Village of FOX Lake, and the City of Park City in Lake County for a total length of 749 feet. | — | Executed | Capital Industrial Services, LLC $893,330 · | ||
| Mar 7, 2025 | 61L05 | LakeDistrict 1 | Resurfacing, PCC base course, decorative PCC sidewalk, granite cobble curb, brick paver banding, and crosswalks, decorative lighting, and landscaping on Deerpath Road from Oakwood Avenue to Western Avenue in Lake Forest. | — | Executed | D'Land Construction, LLC $2,990,057 · | ||
| Mar 7, 2025 | 61L16 | LakeDistrict 1 | Sidewalk improvements at various intersections in Lake Forest. | — | Executed | D'Land Construction, LLC $246,136 · | ||
| Mar 7, 2025 | 61L17 | LakeDistrict 1 | Resurfacing Hart Road from West of the Village limits to Round Lake Road in Round Lake | — | Executed | Peter Baker & Son Co. $388,288 · | ||
| Mar 7, 2025 | 62U91 | LakeDistrict 1 | (1.61-Mile) Standard Overlay, New Shoulders improvement consisting of hot-mix asphalt surface removal, pavement patching, nominal curb and gutter replacement hot-mix asphalt resurfacing, installation of hot-mix asphalt shoulders, grading and shaping of existing aggregate shoulders, and thermoplastic pavement marking Old Skokie Road from US 41 (Skokie Highway) to the Wisconsin State Line within the Village of Wadsworth, in Lake County. | — | Executed | Payne & Dolan, Inc. $2,424,972 · | ||
| Mar 7, 2025 | 62X21 | CookLakeDistrict 1 | Cleaning and painting designated steel surfaces This is a bridge painting project consists of cleaning and painting designated steel surfaces. Location #1: IL-58 (Dempster St) over I-94 (Edens Expwy) Village of Skokie in Cook County SN: 016-0943. Location #2: Clavey Rd over US-41 (Edens) City of Highland Park in Lake County SN: 049-0165. Location #3: Tower Rd over I-94/US-41 (Edens) Village of Northfield in Cook County SN: 016-0815. | — | Executed | ERA-Valdivia Contractors, Inc. $1,181,744 · | ||
| Mar 7, 2025 | 62X79 | CookLakeDistrict 1 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy) in Cook and Lake Counties. | — | Executed | The Final Connection, Inc. $164,400 · | ||
| Mar 7, 2025 | 62X90 | LakeDistrict 1 | The pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, dec The work to be done under Arterial Cleaning shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish located on various State maintained arterial routes located within the county of Lake. | — | Executed | Central Sweeping of Illinois, LLC $2,728,800 · | ||
| Apr 25, 2025 | 61L31 | LakeDistrict 1 | Resurfacing, curb and gutter, and sidewalk replacement on Sheridan Road from Washington Street to south of Liberty Street in Waukegan. | — | Executed | Peter Baker & Son Co. $605,278 · | ||
| Apr 25, 2025 | 61L32 | LakeDistrict 1 | Resurfcing, curb and gutter, and sidewalk replacement on Galilee Avenue from 21st Street to 33rd Street in Zion. | — | Executed | Peter Baker & Son Co. $892,838 · | ||
| Apr 25, 2025 | 62V38 | LakeDistrict 1 | (2.07-Mile) Pavement Patching, hot-mix asphalt surface removal and resurfacing, pavement patching, aggregate wedge shoulder and thermoplastic pavement marking. This improvement is in Village of Old Mill Creek and Unincorporated Lake Villa and Antioch Township in Lake County. | — | Executed | Peter Baker & Son Co. $682,917 · | ||
| Apr 25, 2025 | 62V75 | LakeDistrict 1 | (2.80-Mile) SMART Overlay, Traffic Signal Modernization and ADA Ramp Improvements hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings. Location: IL 59 (Fox Lake Rd) from IL 173 to Highwoods Dr within the Village of Antioch. | — | Executed | Peter Baker & Son Co. $1,949,721 · | ||
| Apr 25, 2025 | 62W59 | LakeDistrict 1 | Trombone Mast Arms replacement project including new traffic signal heads, pedestrian traffic signal heads, accessible pedestrian signals, traffic signal posts, conduits, electric cable, and handholes installations at various locations in District 1. | — | Executed | H & H Electric Co. $1,101,716 · | ||
| Apr 25, 2025 | 62X32 | LakeDistrict 1 | (3.38-Mile) Standard and Designed Overlay, ADA Improvements: HMA surface removal and replacement, Class D patches, sidewalk and curb removal and replacement, drainage structures adjustments, detector loops replacement, pavement markings and collateral work. Location 1) Sheridan Road (Naval Station G Street to Moffett Road), Location 2) Scranton Avenue (Green Bay Road to Sheridan Road, both located in the Village of Lake Bluff. | — | Executed | Peter Baker & Son Co. $2,996,992 · | ||
| Apr 25, 2025 | 62X39 | LakeDistrict 1 | (126-Ft) Surface Removal and HMA Overlay including guardrail and terminal removal and reinstallation, preformed joint seal removal and replacement, crack routing and filling, pavement markings. Located at the west approach of (S.N. 049-0221) on IL 120 (Belvidere Road) over I-94 in the Village of Libertyville in Lake County, and at the south approach of (S.N. 049-0209) on U.S. 41 (Skokie Highway) over IL 132 (Grand Avenue) in the Village of Gurnee in Lake County. | — | Executed | Schroeder Asphalt Services, Inc. $198,854 · | ||
| Jun 13, 2025 | 61J86 | LakeDistrict 1 | Construction of new pavement to extend Hook Drive from Nicole Lane to Orchard Lane, and the construction of Nicole Lane from Hook Drive to Rollins Road in Round Lake Beach. Includes; Excavation, Aggregate base and sub-base, HMA Pavement, Sidewalk, curb and gutter, storm and sanitary sewer, water main, landscaping, lighting foundations and conduit. | — | Executed | Lake County Grading Company, LLC $4,391,124 · | ||
| Jun 13, 2025 | 61K96 | LakeDistrict 1 | HMA resurfacing and shoulder widening on Saunders Road from Duffy Lane to Riverwoods Road in Riverwoods. | — | Executed | |||
| Jun 13, 2025 | 61L52 | LakeDistrict 1 | Construction of an HMA Bike Path in Round Lake. Includes sidewalk removal, storm sewer, pavement markings, and parkway restoration. | — | Executed | Alliance Contractors, Inc. $521,885 · | ||
| Jun 13, 2025 | 62P73 | LakeDistrict 1 | US RTE 12 (10 The projects consist of US RTE 12 (10.39 miles) - SMART Overlay, shoulders, shoulder rumble strips, channelization, and pavement markings and IL RTE 176 (0.71 miles) - shoulder and centerline rumble strips and pavement markings. Project located in Villages of Fox Lake, Volo, Lakemoor, Wauconda and Mundelein | — | Executed | Curran Contracting Company $16,944,587 · | ||
| Jun 13, 2025 | 62V39 | LakeDistrict 1 | Resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplas (1.91-Mile) Project consists of resurfacing of the existing HMA pavement with HMA surface course, adding 4-foot wide HMA shoulders, thermoplastic pavement markings. This project is located along US 45 in the Village of Antioch and the Township of Antioch in Lake County. | — | Executed | Payne & Dolan, Inc. $1,630,685 · | ||
| Jun 13, 2025 | 62V58 | LakeDistrict 1 | (2.02-Mile) SMART Overlay, Shoulder Repair and ADA Improvements consists (HMA) removal, earth excavation, pavement patching, resurfacing with (HMA) asphalt, full depth hot-mix asphalt shoulder, placement of pavement markings, installation of raised reflective pavement markers, ADA ramps, traffic signals, detector loops. Project located on IL 131 (Green Bay Road) from IL 173 (Rosecrans Road) to Russell Road in the City of Zion. | — | Executed | Peter Baker & Son Co. $3,524,201 · | ||
| Sep 19, 2025 | 62J29 | LakeDistrict 1 | Tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83 (3.27-Mile) The improvement consists of tree removal along IL Route 22, from east of Quentin Road to west of IL Route 83. The project is located within the Villages of Hawthorn Woods, Kildeer and Long Grove and within Lake County. | — | Executed | Clean Cut Tree Service, Inc. $586,632 · | ||
| Sep 19, 2025 | 62X00 | LakeDistrict 1 | Advance tree removal as well as all incidental and collateral work necessary to complete the project The scope of work consists of advance tree removal as well as all incidental and collateral work necessary to complete the project. This project is in the City of Highland in Lake County. | — | Executed | Clean Cut Tree Service, Inc. $151,131 · | ||
| Nov 7, 2025 | 61L83 | LakeDistrict 1 | HMA resurfacing on Oak Spring Road from Appley Avenue to St. Mary's Road in Libertyville. Includes; pavement pathcing, ADA ramps, and signage. | — | Executed | Peter Baker & Son Co. $774,012 · |
1–26 of 26
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.