Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 18, 2019 46481 LakeDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $278,325 ·
Jan 18, 2019 61F33 LakeDistrict 1 Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. — Executed Nov 26 New Berger Excavating Contractors, Inc. $16,525,114 ·
Jan 18, 2019 62C77 LakeDistrict 1 Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). — Executed Nov 26 New Peter Baker & Son Co. $6,097,098 ·
Jan 18, 2019 62F48 LakeDistrict 1 Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 ·
Jan 18, 2019 62G87 CookLakeMcHenryDistrict 1 Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $302,850 ·
Jan 18, 2019 62H31 CookLakeDistrict 1 Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) — Executed Nov 26 New Freehill Asphalt, Inc. $451,265 ·
Mar 8, 2019 60R68 LakeDistrict 1 Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. — Executed Nov 26 New Areatha Construction Co., Inc. $1,777,994 ·
Mar 8, 2019 61F47 LakeDistrict 1 Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,668,129 ·
Mar 8, 2019 62D38 LakeDistrict 1 Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) — Executed Nov 26 New Martam Construction Incorporated $377,924 ·
Mar 8, 2019 62G58 LakeDistrict 1 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. — Executed Nov 26 New J. A. Johnson Paving Company $2,327,169 ·
Mar 8, 2019 62G90 LakeDistrict 1 Sheet pile retaining wall and parking improvement at Illinois Beach State Park — Executed Nov 26 New Alliance Contractors, Inc. $953,418 ·
Mar 8, 2019 62H39 LakeDistrict 1 Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. — Executed Nov 26 New Lima Contractors $158,946 ·
Apr 26, 2019 61E24 LakeDistrict 1 Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road. — Executed Nov 26 New Lake County Grading Company, LLC $12,090,770 ·
Apr 26, 2019 61F65 LakeDistrict 1 Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach. — Executed Nov 26 New Campanella and Sons, Inc. $5,231,811 ·
Apr 26, 2019 61F69 LakeDistrict 1 Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake. — Executed Nov 26 New Peter Baker & Son Co. $1,287,252 ·
Apr 26, 2019 61F75 LakeDistrict 1 Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville. — Executed Nov 26 New Copenhaver Construction, Inc. $6,139,354 ·
Apr 26, 2019 62C01 LakeDistrict 1 1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee. — Executed Nov 26 New Peter Baker & Son Co. $3,628,516 ·
Apr 26, 2019 62G96 LakeDistrict 1 0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park. — Executed Nov 26 New Plote Construction, Inc. $2,694,455 ·
Apr 26, 2019 62H28 LakeDistrict 1 Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks. — Executed Nov 26 New SKC Construction, Inc. $254,148 ·
Apr 26, 2019 62H29 CookLakeDistrict 1 A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. — Executed Nov 26 New Denler, Inc. $525,544 ·
Apr 26, 2019 62H36 LakeDistrict 1 1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $5,321,788 ·
Apr 26, 2019 62H81 LakeDistrict 1 1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee. — Rejected Nov 26 New
Jun 14, 2019 46507 LakeWillDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $593,000 ·
Jun 14, 2019 62B75 LakeDistrict 1 Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. — Executed Nov 26 New Campanella and Sons, Inc. $3,348,311 ·
Jun 14, 2019 62G30 LakeDistrict 1 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. — Executed Nov 26 New Builders Paving, LLC $1,698,888 ·
Jun 14, 2019 62G83 LakeDistrict 1 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. — Executed Nov 26 New Peter Baker & Son Co. $2,893,697 ·
Jun 14, 2019 62H10 LakeMcHenryDistrict 1 Guardrail improvements at varous locations in McHenry and Lake Counties. — Executed Nov 26 New Kujo, Inc. $655,072 ·
Jun 14, 2019 62H18 LakeDistrict 1 Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. — Executed Nov 26 New Meru Corporation $147,965 ·
Jun 14, 2019 62H88 LakeDistrict 1 Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. — Executed Nov 26 New McDonagh Demolition, Inc. $122,288 ·
Jun 14, 2019 62J14 LakeMcHenryDistrict 1 Intermittent resurfacing on various routes in Lake and McHenry counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,964,700 ·
Jul 12, 2019 62H92 LakeDistrict 1 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein. — Executed Nov 26 New Builders Paving, LLC $2,634,888 ·
Jul 12, 2019 62H95 LakeDistrict 1 3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein. — Executed Nov 26 New Arrow Road Construction Co. $2,064,157 ·
Jul 12, 2019 62J03 LakeDistrict 1 0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan. — Executed Nov 26 New Peter Baker & Son Co. $1,997,757 ·
Aug 2, 2019 62H91 LakeDistrict 1 Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road — Executed Nov 26 New Lion Construction 1, LLC $497,411 ·
Sep 20, 2019 61D65 LakeDistrict 1 Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. — Executed Nov 26 New Plote Construction, Inc. $7,965,000 ·
Sep 20, 2019 61F25 LakeDistrict 1 Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. — Executed Nov 26 New Berger Excavating Contractors, Inc. $12,469,513 ·
Sep 20, 2019 61G00 LakeDistrict 1 Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,964,385 ·
Nov 8, 2019 61F63 LakeDistrict 1 Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
1–38 of 38

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.