Filtered by: County: Lake Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 16, 2026 | 46943 | LakeDistrict 1 | Bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lak This project consists of bridge replacement (Ex SN 049-0185, Pr SN 049-0400) and other misc repairs at Illinois Beach State Park in Lake County, IL. | — | Executed | Alliance Contractors, Inc. $578,450 · | ||
| Jan 16, 2026 | 61L19 | LakeDistrict 1 | Construction of a single-span PPC IL-beam bridge with intgral abutments carrying Greenwood Avenue over the Union Pacific Railroad in Waukegan. Additional work includes MSE retaining walls, HMA approach roadways, guardrail, and lighting. | — | Executed | Dunnet Bay Construction Company $7,980,812 · | ||
| Jan 16, 2026 | 61L42 | LakeDistrict 1 | Roadway widening and HMA resurfacing of Waukegan Road and Westleigh Road in Lake Forest. Includes traffic signal modernization, lighting, curb and gutter, sidewalks, and storm sewer. | — | Executed | D'Land Construction, LLC $3,663,043 · | ||
| Jan 16, 2026 | 61M08 | LakeDistrict 1 | Reconstruction of Green Bay Road from IL 176 to South of Witchwood Lane in the Village of Lake Bluff. | — | Executed | Campanella and Sons, Inc. $3,131,134 · | ||
| Jan 16, 2026 | 80B29 | LakeDistrict 1 | (0.46-mile) Designed Overlay consisting of hot-mix asphalt surface removal, depth patches (Class D), curb and gutter spot repairs (removal and replacement) hot-mix asphalt resurfacing (cold milling and inlay), new thermoplastic pavement markings. Located on US 45 (Lake Street) from north of Tempel Drive to Ramp to IL 137 within the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $1,013,752 · | ||
| Jan 16, 2026 | 80B50 | LakeDistrict 1 | (1.08-Mile) Standard Overlay and ADA Improvements: curb and gutter spot repairs (remove and replace), sidewalk removal and replacement for curb ramps for sidewalks (ADA), hot-mix asphalt (HMA) surface removal and replacement (cold milling and inlay), full-depth patches (Class D), drainage structures adjustments and cleaning, new thermoplastic pavement markings raised reflective pavement markers, accessible pedestrian signals (APS) improvements and detector loops. Location: US 45 (Lake Street), f | — | Executed | Builders Paving, LLC $1,797,808 · |
1–6 of 6
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.