| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2024 | 61J95 | DuPageDistrict 1 | Resurfacing Central Avenue from Thomdale Avenue to Foster Avenue in Wood Dale. | — | Executed | Builders Paving, LLC $726,808 · | ||
| Jan 19, 2024 | 61K02 | DuPageDistrict 1 | Roadway reconstruction on Janes Avenue from 7th Street to Spring Street in Woodridge. | — | Executed | K-Five Construction Corporation $2,045,192 · | ||
| Jan 19, 2024 | 62R40 | DuPageDistrict 1 | Earth excavation, removal and construction of a pipe culvert and drainages structure, pavement removal and ful (803-Ft) Curve correction project consists of earth excavation, removal and construction of a pipe culvert and drainages structure, pavement removal and full-depth HMA pavement, located along I-55 North Frontage Road at Cass Avenue in the City of Darien in DuPage County. | — | Executed | Martam Construction Incorporated $673,990 · | ||
| Jan 19, 2024 | 62W19 | DuPageDistrict 1 | Arterial road sweeping in DuPage County This contract consists of arterial road sweeping in DuPage County. | — | Rejected | Central Sweeping of Illinois, LLC $1,601,000 · | ||
| Mar 8, 2024 | 61J30 | DuPageDistrict 1 | Replacement of existing structure with a single span steel beam structure with concrete deck and HMA approach roadways, retaining walls, curb and gutter, shared-use path, drainage improvements, pavement markings and landscaping on Geneva Road over the the west branch of the DuPage River. | — | Executed | Herlihy Mid-Continent Company $7,867,988 · | ||
| Mar 8, 2024 | 61K22 | DuPageDistrict 1 | Resurface Church Road from Grove Avenue to IL 19, and resurface Main Street from Church Road to York Road in Bensenville. | — | Executed | Builders Paving, LLC $914,627 · | ||
| Mar 8, 2024 | 62T66 | DuPageDistrict 1 | (5.5-miles) Crack and Joint Sealing. Location: FAP 311 (US 34) from Southwest of Authority Drive to West of IL 83 (Kingery Highway) within the Villages of Clarendon Hills, Downers Grove, and Westmont in DuPage County. | — | Executed | SKC Construction, Inc. $256,694 · | ||
| Mar 8, 2024 | 62T79 | DuPageDistrict 1 | (4.64-Mile) Crack and Joint Sealing on IL 83 (Kingery Hwy) from 0.1-mile north of Ridgemoor Drive to Cook County Line. The project is located within the Villages of Burr Ridge and Willowbrook in DuPage County. | — | Executed | Freehill Asphalt, Inc. $559,556 · | ||
| Mar 8, 2024 | 62U96 | CookDuPageDistrict 1 | 219.6 Debris and litter cleaning along I-290 and I-290 Extension from IL 83 (Kingery Highway) to Austin Boulevard. | — | Executed | William Dunbar Construction LLC. $128,995 · | ||
| Mar 8, 2024 | 62W07 | CookDuPageDistrict 1 | Debris and litter cleaning along I-290/IL-53 from Lake Cook Rd to IL-83 This contract consists of debris and litter cleaning along I-290/IL-53 from Lake Cook Rd to IL-83. The project length is 240 miles. | — | Executed | William Dunbar Construction LLC. $140,978 · | ||
| Apr 26, 2024 | 60P75 | DuPageDistrict 1 | (1.62-Mile) Proposed improvement includes widening and reconstruction of IL Route 56 (Butterfield Road) from West of I-355 to Arboretum Drive including Bridge repairs, multi-use path, traffic signals and lighting. | — | Executed | R. W. Dunteman Company $38,948,948 · | ||
| Apr 26, 2024 | 61J14 | DuPageDistrict 1 | Replace existing structure with a single-span PPC bulb t-beam superstructure with concrete deck, HMA pavement, retaining wall, HMA multi-use path, storm sewers, sidewalks, ADA improvements, Guardrail, curb and gutter, and signage on Warrenville Road over the East Branch of the DuPage River in Lisle. | — | Executed | Dunnet Bay Construction Company $8,419,194 · | ||
| Apr 26, 2024 | 61K00 | DuPageDistrict 1 | Resurfacing Lombard Road from Army Trial Boulevard to Fullerton Avenue in the Village of Addison. | — | Executed | R. W. Dunteman Company $1,427,498 · | ||
| Apr 26, 2024 | 61K13 | DuPageDistrict 1 | Sidewalk construction along Armitage Avenue from Ardmore Avenue to Ellsworth Avenue in Addison. | — | Executed | R. W. Dunteman Company $544,000 · | ||
| Apr 26, 2024 | 61K32 | DuPageDistrict 1 | Pavement reconstruction with an HMA multi-use path, curb and gutter, HMA shoulders, sidewalks, ADA ramps, traffic signals, culvert extension, and storm sewer on Gary Avenue from Jewell Road to Harrison Avenue in Wheaton. | — | Executed | Plote Construction, Inc. $4,291,788 · | ||
| Apr 26, 2024 | 61K33 | DuPageDistrict 1 | HMA Resurfacing, sidewalks, traffic signal modifications, and pavement markings on Main Street from Sherman Road to Franklin Street in Downers Grove. | — | Executed | K-Five Construction Corporation $2,384,159 · | ||
| Apr 26, 2024 | 62M37 | DuPageDistrict 1 | Bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage Cou (1014-Ft) The proposed improvement consists of bridge deck overlay and joint repair of the structure located at IL 83 (Kingery Highway) over I-88, Dupage County. | — | Executed | Lorig Construction Company $2,360,619 · | ||
| Apr 26, 2024 | 62P06 | DuPageDistrict 1 | Culvert repair of the structure located at I-55 at stream (0 (1157-Ft) The proposed improvement consists of culvert repair of the structure located at I-55 at stream (0.9 Mi E. of Cass Ave) in Downers Grove Township, DuPage County. | — | Executed | Lorig Construction Company $1,281,947 · | ||
| Apr 26, 2024 | 62R91 | DuPageDistrict 1 | Bridge Deck Overlay, Bridge Joint Replacement / Repair at US 20 (Lake Street) over IL 390 (Elgin O'Hare Expressway). This project is located in the Village of Hanover Park in DuPage County. | — | Executed | Martam Construction Incorporated $1,888,608 · | ||
| Apr 26, 2024 | 62U73 | DuPageDistrict 1 | (2,000-Ft) Traffic Signal Modernization and Intersection Improvements located at IL 83 (Kingery Highway) and Bluff Rd. in the Downers Grove Township, DuPage County. | — | Active | R. W. Dunteman Company $1,457,500 · | ||
| Apr 26, 2024 | 62V97 | DuPageDistrict 1 | This improvement is located at the IDOT Oakbrook Maintenance yard at 17W125 Butterfield Road, Villa Park, IL. Scope of work includes pavement removal, Catch Basins PCC reconstruction, placement of subbase granular material, HMA asphalt pavement, PCC pavement, and thermoplastic pavement marking. | — | Executed | K-Five Construction Corporation $780,422 · | ||
| Apr 26, 2024 | 62W09 | CookDuPageDistrict 1 | Debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in This project consists of debris cleaning and litter picking located on I-55 - Stevenson expressway from IL 43 (Harlem Ave) to I-355 in Cook and DuPage Co. | — | Executed | The Final Connection, Inc. $140,400 · | ||
| Jun 14, 2024 | 46649 | DuPageMcHenryDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4,6, and 8 inches in width. The location of the work is on various State-maintained highways in McHenry and DuPage Counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $893,950 · | ||
| Jun 14, 2024 | 62N32 | DuPageDistrict 1 | (14.64-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New), Surveillance, Traffic Signal Modernization and ADA improvements. Located on IL 56 from IL 59 to York Rd in the Cities of Wheaton, Warrenville, Oakbrook Terrace, the Villages of Downers Grove, Oak Brook, Lombard, and Milton Township in DuPage County. | — | Executed | H & H Electric Co. $15,380,412 · | ||
| Jun 14, 2024 | 62N40 | CookDuPageDistrict 1 | (10.1-Mile) Changeable Message Signs, Signal Timing/ Progression, Signing (New) Surveillance, Traffic Signal Modernization and ADA Improvements. Located on IL 64 (North Avenue) from York Rd to IL 50 (Cicero Ave) in the Cities of Chicago, Elmhurst, Northlake, the Villages of Elmwood Park, Melrose Park, Oak Park, River Forest, River Grove and Stone Park in DuPage and Cook Co. | — | Executed | John Burns Construction Company $17,075,556 · | ||
| Aug 2, 2024 | 61K57 | DuPageDistrict 1 | Resurfacing St. Charles Road from IL 53 to Grace Street in Lombard. | — | Executed | R. W. Dunteman Company $1,814,750 · | ||
| Sep 20, 2024 | 61G80 | DuPageDistrict 1 | Replace existing struture with a four-cell cast-in-place box culvert with 10X12 cells, south of the Arlington Drive and Greenbrook Boulevard Intersection in Hanover Park. Work includes roadway reconstruction and replacing water mains. | — | Executed | Martam Construction Incorporated $2,262,440 · | ||
| Sep 20, 2024 | 62R60 | DuPageDistrict 1 | The scope of work includes designed overlay, new shoulders and ADA improvements This project is located along IL. 19 (Irving Park Road) from Roselle Road to east of Baker Drive. The gross and net length is 13,262 feet (2.51 miles). It is located in the Villages of Itasca and Roselle and unincorporated Bloomingdale Township in DuPage County. | — | Executed | R. W. Dunteman Company $3,872,485 · | ||
| Sep 20, 2024 | 62W80 | DuPageDistrict 1 | Reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-ere Scope of work consists of reconstruction of the northeast wingwall at US 20 (Lake St) over I-290, pavement patching, removing and re-erecting the existing guardrail terminal, maintenance of traffic, and pavement markings. Improvement is located in the City of Elmhurst in DuPage County. Gross Length= 2628 FT (0.5 Miles); Net Length= 12 FT (0.002 Miles). | — | Executed | Alliance Contractors, Inc. $221,327 · | ||
| Nov 8, 2024 | 60T22 | DuPageDistrict 1 | (2,439 Ft) Channelization, Traffic Signal Installation: Median improvement, new HMA shoulders, HMA resurfacing, pavement widening, pavement patching, grading and shaping ditches, curb ramps (ADA) improvements, pavement markings, installation of new traffic signal and APS. FAP 870: IL 53 (Columbine Ave), from Bryant Avenue to Surrey Drive in the Villages of Lombard and Glen Ellyn in DuPage County. | — | Rejected | |||
| Nov 8, 2024 | 61K65 | DuPageDistrict 1 | Resurface Liberty Street from Eola Road to Commons Drive in Aurora. | — | Executed | K-Five Construction Corporation $734,188 · | ||
| Nov 8, 2024 | 61K75 | DuPageDistrict 1 | Resurface Schick Road from the west corporate limits to County Farm Road in Hanover Park. | — | Executed | K-Five Construction Corporation $939,975 · | ||
| Nov 8, 2024 | 62G63 | DuPageDistrict 1 | (6.63-Mile) Standard and Designed Overlay, ADA Improvements, Patching, Signal Modifications, Landscape Medians. Project is located on IL-38 (Roosevelt Rd) from East of Technology Blvd to Pierce Ave. in the Cities of West Chicago, Wheaton and the Village of Winfield in Cook County. | — | Executed | R. W. Dunteman Company $8,631,060 · | ||
| Nov 8, 2024 | 62T10 | DuPageDistrict 1 | (5.78-Mile) SMART Overlay and ADA Improvements: HMA surface removal and replacement, Class D patches, detector loops replacement, pavement markings, sidewalk and curb removal and replacement, drainage structures adjustments, minor traffic signal (APS) improvements. Located along IL 59 (Neltnor Boulevard ) from South of Heritage Woods Drive to North of Batavia Road within the City of West Chicago and the Village of Warrenville. | — | Executed | Plote Construction, Inc. $5,630,000 · | ||
| Dec 13, 2024 | 62T17 | DuPageDistrict 1 | (760-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair at IL 38 (Roosevelt Rd) at IL 53. This project is located in the Village of Glen Ellyn in DuPage County. | — | Executed | D. Construction, Inc. $1,972,826 · | ||
| Dec 13, 2024 | 62T30 | DuPageDistrict 1 | (307-Ft) Bridge preservation project: Deck overlay, Joints replacement/repair. Located on IL 53 / Rohlwing Road, at Canadian National (CN) Railroad (approximately 0.1-miles South of Fullerton Avenue) in the Village of Addison. | — | Executed | Martam Construction Incorporated $1,491,736 · |
1–36 of 36
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.