18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Dec 5, 2018 | 0015-01-243NH 2019(312) | McLennan Waco |
WDN, GR, STRS, & SURFIH 35 · | $457,835,185 | $447,615,000 | WEBBER, LLC | -2.2% | 5 |
| Dec 5, 2018 | 1717-01-010C 1717-1-10 | Ector Odessa |
ROADWAY RESTORATIONFM 1787 · | $16,938,619 | $16,701,305 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -1.4% | 5 |
| Dec 5, 2018 | 0005-10-023C 5-10-23 | Howard Abilene |
SEAL COATBI 20-G · | $12,120,749 | $13,457,009 | RONALD R. WAGNER & CO., LP | +11.0% | 3 |
| Dec 5, 2018 | 0009-08-031C 9-8-31 | Hunt Paris |
SEAL COATSH 24 · | $9,049,516 | $11,452,321 | BRANNAN PAVING CO., LTD. | +26.6% | 2 |
| Dec 5, 2018 | 6327-15-001RMC - 632715001 | Travis Austin |
REPAIR, REPLACE MBGFFM 734 · | $4,053,070 | $3,884,864 | K-BAR SERVICES, INC. | -4.2% | 1 |
| Dec 5, 2018 | 6337-42-001RMC - 633742001 | Denton Dallas |
GUARDRAIL REPAIRIH 35W · | $2,979,125 | $3,004,200 | K-BAR SERVICES, INC. | +0.8% | 3 |
| Dec 5, 2018 | 6333-13-001RMC - 633313001 | McCulloch Brownwood |
MAINTENANCE SEAL COATFM 504 · | $2,405,167 | $2,681,106 | BRANNAN PAVING CO., LTD. | +11.5% | 2 |
| Dec 5, 2018 | 6330-73-001RMC - 633073001 | Denton Dallas |
CLEANING & SWEEPING & DEBRIS REMOVALIH 35 · | $3,145,729 | $2,673,831 | PANNELL INDUSTRIES, INC. | -15.0% | 2 |
| Dec 5, 2018 | 6332-06-001RMC - 633206001 | Travis Austin |
DISTRICTWIDE BUTTONS AND STRIPINGIH 35 · | $3,400,810 | $2,409,847 | D. I. J. CONSTRUCTION, INC. | -29.1% | 3 |
| Dec 5, 2018 | 0113-08-090NH 2019(297) | Travis Austin |
PFC-C OVERLAYUS 290 · | $2,450,834 | $2,265,981 | ANGEL BROTHERS HOLDINGS CORP. | -7.5% | 6 |
| Dec 5, 2018 | 0064-05-061STP 2019(330)HES | Sabine Lufkin |
SAFETY TREAT FIXED OBJECTSFM 1 · | $2,054,935 | $1,954,394 | LONGVIEW BRIDGE AND ROAD, LTD. | -4.9% | 5 |
| Dec 5, 2018 | 0073-02-071NH 2019(273) | Bexar San Antonio |
INTERSECTION OPERATIONAL IMPROVEMENTSUS 281 · | $2,059,166 | $1,936,000 | ALL IN CONSTRUCTION, L.L.C. | -6.0% | 10 |
| Dec 5, 2018 | 0047-09-033STP 2019(257) | Collin Dallas |
MILL, BASE REPAIR, OVERLAYSH 5 · | $1,908,411 | $1,873,091 | A. L. HELMCAMP, INC. | -1.9% | 5 |
| Dec 5, 2018 | 0902-90-103C 902-90-103 | Tarrant Fort Worth |
NON SITE SPECIFIC ILLUMINATIONVA · | $2,960,843 | $1,817,620 | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, INC. | -38.6% | 3 |
| Dec 5, 2018 | 1061-01-032STP 2019(308)HESG | Liberty Beaumont |
CONSTRUCT PAVED SHLDRS,MILLED RUMBLE STRIPSFM 1010 · | $2,086,939 | $1,711,111 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -18.0% | 4 |
| Dec 5, 2018 | 6338-41-001RMC - 633841001 | Nueces Corpus Christi |
E. NUECES CLEANING/SWEEPINGIH 37 · | $1,638,812 | $1,171,227 | SYNERGY SWEEPING SERVICES LLC | -28.5% | 3 |
| Dec 5, 2018 | 0336-05-061C 336-5-61 | Angelina Lufkin |
RESURFACE WITH THIN OVERLAY MIXTURESH 103 · | $1,287,979 | $1,098,660 | MOORE BROTHERS CONSTRUCTION COMPANY | -14.7% | 3 |
| Dec 5, 2018 | 6319-38-001RMC - 631938001 | Johnson Fort Worth |
ROADSIDE MOWING AND HERBICIDEUS 67 · | $578,038 | $1,059,322 | CEN-TEX IRRIGATION SYSTEMS, INC. | +83.3% | 4 |
| Dec 5, 2018 | 0197-05-058NH 2019(255) | Kaufman Dallas |
GRADING, STRUCTURES, BASE, PAVINGUS 175 · | $838,891 | $1,047,916 | TEXAS MATERIALS GROUP, INC. | +24.9% | 9 |
| Dec 5, 2018 | 6329-30-001RMC - 632930001 | Tarrant Fort Worth |
ROADSIDE MOWING, LITTER REMOVAL AND HERBICIDESH 114 · | $960,628 | $947,139 | JASCO | -1.4% | 5 |
| Dec 5, 2018 | 0010-13-092NH 2019(260) | Bowie Atlanta |
PLANING, SURFACING & PAV MRKSUS 67 · | $698,054 | $761,772 | EAST TEXAS BRIDGE, INC. | +9.1% | 3 |
| Dec 5, 2018 | 6329-81-001RMC - 632981001 | Dallas Dallas |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSIH 35E · | $722,101 | $650,639 | PMI PAVEMENT MARKING, LLC | -9.9% | 4 |
| Dec 5, 2018 | 0523-10-043C 523-10-43 | Montgomery Houston |
ADD RIGHT TURN LANEFM 1488 · | $692,503 | $619,717 | HARPER BROTHERS CONSTRUCTION LLC | -10.5% | 7 |
| Dec 5, 2018 | 6332-07-001RMC - 633207001 | Williamson Austin |
FULL WIDTH MOWINGSH 195 · | $413,420 | $551,400 | CHAMPION INFRASTRUCTURE, LLC | +33.4% | 5 |
| Dec 5, 2018 | 6333-77-001RMC - 633377001 | Dallas Dallas |
FLEXIBLE PAVEMENT REPAIRIH 20 · | $580,984 | $550,545 | FOUTSCO PAVING COMPANY, LLC | -5.2% | 5 |
| Dec 5, 2018 | 6336-99-001RMC - 633699001 | Eastland Brownwood |
MILL AND INLAYIH 20 · | $602,415 | $547,807 | CONTRACT PAVING CO. | -9.1% | 7 |
| Dec 5, 2018 | 0905-17-015BR 2018(214) | Swisher Lubbock |
BRIDGE CONSTRUCTIONCR · | $528,613 | $503,110 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -4.8% | 8 |
| Dec 5, 2018 | 6335-79-001RMC - 633579001 | Collin Dallas |
REHABILITATION OF EXISTING CULVERTSSH 78 · | $377,695 | $417,037 | STATELINE CONSTRUCTION, LLC | +10.4% | 7 |
| Dec 5, 2018 | 6334-36-001RMC - 633436001 | Harrison Atlanta |
CALLOUT METAL BEAM GUARD FENCE REPAIR(S)US 59 · | $462,100 | $412,252 | CATOCON, INC. | -10.8% | 1 |
| Dec 5, 2018 | 6336-59-001RMC - 633659001 | Denton Dallas |
FULL DEPTH CONCRETE REPAIRIH 35 · | $488,785 | $410,919 | ROY JORGENSEN ASSOCIATES, INC. | -15.9% | 4 |
| Dec 5, 2018 | 6327-12-001BPM - 632712001 | Burnet Austin |
SCOUR AND SPALL REPAIR,UPGRADE RAIL & DELAMINATIONUS 183 · | $349,627 | $406,051 | 3LW CIVIL LLC | +16.1% | 7 |
| Dec 5, 2018 | 6334-35-001RMC - 633435001 | Bowie Atlanta |
CALLOUT METAL BEAM GUARD FENCE REPAIR-NUS 59 · | $484,850 | $373,546 | CATOCON, INC. | -23.0% | 1 |
| Dec 5, 2018 | 6340-11-001RMC - 634011001 | Gray Amarillo |
2019 DISTRICT RAISED PAVEMENT MARKERSUS 60 · | $488,251 | $364,816 | BRYDL CONTRACTING, INC. | -25.3% | 5 |
| Dec 5, 2018 | 0922-33-163STP 2019(300)HES | Webb Laredo |
IMPROVE TRAFFIC SIGNALSCS · | $355,400 | $361,930 | TRAF-TEX, INC. | +1.8% | 2 |
| Dec 5, 2018 | 0024-01-101NH 2019(272) | Uvalde San Antonio |
INTERSECTION IMPROVEMENTSUS 90 · | $273,463 | $361,123 | HUNTER INDUSTRIES, LTD. | +32.1% | 3 |
| Dec 5, 2018 | 6334-37-001RMC - 633437001 | Titus Atlanta |
CALLOUT METAL BEAM GUARD FENCE REPAIR(W)US 271 · | $309,325 | $304,044 | CATOCON, INC. | -1.7% | 1 |
| Dec 5, 2018 | 6332-08-001RMC - 633208001 | Williamson Austin |
FULL WIDTH MOWINGUS 79 · | $307,300 | $281,097 | P-VILLE, INCORPORATED | -8.5% | 5 |
| Dec 5, 2018 | 6333-43-001RMC - 633343001 | Ellis Dallas |
SPECIALTY MARKINGSUS 287 · | $291,197 | $267,995 | TRP CONSTRUCTION GROUP, LLC | -8.0% | 4 |
| Dec 5, 2018 | 6336-29-001RMC - 633629001 | Denton Dallas |
ROADSIDE MOWINGFM 455 · | $291,130 | $262,790 | JMT CONSTRUCTION | -9.7% | 5 |
| Dec 5, 2018 | 6327-45-001RMC - 632745001 | Denton Dallas |
RETRO-REFLECTORIZED PAVEMENT MARKINGS AND MARKERSIH 35 · | $281,052 | $193,162 | TRP CONSTRUCTION GROUP, LLC | -31.3% | 3 |
| Dec 5, 2018 | 0913-09-101STP 2019(264)TAPS | Wharton Yoakum |
CONSTRUCT SIDEWALKSCS · | $148,178 | $144,420 | TREVWAY, INC. | -2.5% | 8 |
| Dec 5, 2018 | 0541-01-028STP 2019(316)HES | Briscoe Childress |
MISCELLANEOUS WORKSH 256 · | $94,408 | $113,928 | GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC. | +20.7% | 2 |
| Dec 5, 2018 | 0449-01-019STP 2019(315)HES | Collingsworth Childress |
MILLED CENTERLINE RUMBLE STRIPSFM 338 · | $120,913 | $72,770 | TEXAS PANHANDLE CONSTRUCTION, INC. | -39.8% | 6 |
| Nov 12, 2018 | 6333-00-001RMC - 633300001 | Val Verde Laredo |
INSTALL PAVE MRK AND MRKSUS 277 · | $299,459 | $281,755 | REPUBLIC TRAFFIC SAFETY, INC. | -5.9% | 2 |
| Nov 12, 2018 | 6327-78-001RMC - 632778001 | Polk Lufkin |
FHWA_DISASTER RELIEF MAINTENANCEUS 59 · | $202,540 | $236,942 | CHAMPION INFRASTRUCTURE, LLC | +17.0% | 3 |
| Nov 12, 2018 | 6336-57-001RMC - 633657001 | Van Zandt Tyler |
GUARDRAILUS 80 · | $90,103 | $88,980 | THOMAS 11 DEVELOPMENT LLC | -1.2% | 10 |
| Nov 7, 2018 | 0114-05-037NH 2019(106) | Bastrop Austin |
GR, BASE, STRS, HMACP & PVMT MRKSUS 290 · | $32,993,154 | $34,428,168 | ANGEL BROTHERS HOLDINGS CORP. | +4.3% | 7 |
| Nov 7, 2018 | 0018-01-093NH 2019(164) | La Salle Laredo |
REHABILITATION OF EXISTING HIGHWAYIH 35 · | $11,016,398 | $10,878,130 | J. CARROLL WEAVER, INC. | -1.3% | 5 |
| Nov 7, 2018 | 0037-01-042STP 2019(170) | Uvalde San Antonio |
REHAB EXISTING ROADWAYUS 83 · | $11,761,070 | $10,197,041 | HUNTER INDUSTRIES, LTD. | -13.3% | 5 |
| Nov 7, 2018 | 0053-03-021NH 2019(154) | Lynn Lubbock |
SEALCOATUS 84 · | $6,876,878 | $9,099,683 | COX PAVING OF TEXAS, INC. | +32.3% | 3 |
| Nov 7, 2018 | 0044-11-002NH 2019(219) | Wichita Wichita Falls |
SEAL COATBU 287J · | $9,512,380 | $8,903,752 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | -6.4% | 3 |
| Nov 7, 2018 | 0092-13-024BR 2019(207) | Navarro Dallas |
REPLACE BRIDGE AND APPROACHESBI 45-F · | $8,642,002 | $7,970,000 | PIERCE R & B LLC | -7.8% | 15 |
| Nov 7, 2018 | 0025-10-092STP 2019(171) | Guadalupe San Antonio |
SURFACE & PAVEMENT MARKINGSFM 78 · | $7,755,982 | $7,321,503 | HUNTER INDUSTRIES, LTD. | -5.6% | 5 |
| Nov 7, 2018 | 0025-07-065STP 2019(173) | Gonzales Yoakum |
SEAL COATSH 97 · | $6,761,632 | $7,309,913 | F. N. PLOCH CONSTRUCTION COMPANY, INC. | +8.1% | 3 |
| Nov 7, 2018 | 0068-02-048STP 2019(157) | Lynn Lubbock |
SEALCOATUS 87 · | $5,863,298 | $6,100,851 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +4.1% | 3 |
| Nov 7, 2018 | 2941-02-055STP 2019(222) | Harris Houston |
BASE RPR, PLANING,1"TOM-F,1"TOM-C & PAV MRKSFM 2920 · | $8,513,632 | $6,097,569 | ANGEL BROTHERS HOLDINGS CORP. | -28.4% | 3 |
| Nov 7, 2018 | 0002-07-049BR 1802(572) | Hudspeth El Paso |
REPLACE BRIDGES AND APPROACHESIH 10 · | $5,465,090 | $5,693,877 | DAN WILLIAMS COMPANY | +4.2% | 5 |
| Nov 7, 2018 | 0067-04-054STP 2019(193) | Hale Lubbock |
SEALCOATIH 27 · | $5,381,902 | $5,509,388 | LIPHAM ASPHALT AND PAVING COMPANY, LLC | +2.4% | 3 |
| Nov 7, 2018 | 0044-07-071NH 2019(217) | Cooke Wichita Falls |
PAVEMENT REPAIR AND OVERLAYUS 82 · | $4,540,277 | $4,475,655 | JAGOE-PUBLIC COMPANY | -1.4% | 6 |
| Nov 7, 2018 | 2817-01-010STP 2019(192) | Fort Bend Houston |
ADD 4' SHOULDER AND OVERLAYFM 2759 · | $5,457,736 | $4,321,825 | DURWOOD GREENE CONSTRUCTION CO. | -20.8% | 3 |
| Nov 7, 2018 | 0218-01-096NH 2019(201) | Bowie Atlanta |
PLANING, ACP & PAV MRKSUS 59 · | $4,788,910 | $4,256,574 | RK HALL, LLC | -11.1% | 3 |
| Nov 7, 2018 | 2224-01-100NH 2019(359) | Ector Odessa |
RECONSTRUCT INTERSECTIONSL 338 · | $1,603,725 | $3,012,163 | FNH CONSTRUCTION, LLC | +87.8% | 3 |
| Nov 7, 2018 | 6334-22-001RMC - 633422001 | McLennan Waco |
SEAL COAT (DISTRICT WIDE)FM 2416 · | $1,836,770 | $2,011,340 | BRANNAN PAVING CO., LTD. | +9.5% | 2 |
| Nov 7, 2018 | 0715-01-014BR 2019(176) | Gonzales Yoakum |
REPLACE BRIDGE AND APPROACHESFM 108 · | $2,209,230 | $1,963,663 | HILL COUNTRY BRIDGE, INC. | -11.1% | 8 |
| Nov 7, 2018 | 0914-00-414C 914-00-414 | Travis Austin |
ROUTINE MAINTENANCE OF PAVEMENT MARKINGSVA · | $1,988,359 | $1,954,799 | TRP CONSTRUCTION GROUP, LLC | -1.7% | 3 |
| Nov 7, 2018 | 6338-73-001RMC - 633873001 | Bell Waco |
DISTRICT WIDE PAVEMENT MARKINGSSH 317 · | $1,284,325 | $1,169,617 | BATTERSON, LLP | -8.9% | 6 |
| Nov 7, 2018 | 6335-53-001RMC - 633553001 | Hidalgo Pharr |
PAVEMENT MARKINGSIH 2 · | $1,281,341 | $1,127,180 | PAVEMENT MARKINGS INC. | -12.0% | 4 |
| Nov 7, 2018 | 6335-76-001RMC - 633576001 | Harris Houston |
REFLECTIVE PAVEMENT MARKINGS (GRAPHICS)SL 8 · | $1,235,553 | $1,106,689 | PMI PAVEMENT MARKING, INC. | -10.4% | 4 |
| Nov 7, 2018 | 6336-75-001RMC - 633675001 | Victoria Yoakum |
CALL OUT CONCRETE PUNCH OUTSUS 59 · | $1,377,100 | $997,550 | MAIN LANE INDUSTRIES LTD. | -27.6% | 3 |
| Nov 7, 2018 | 6335-59-001RMC - 633559001 | Harris Houston |
FULL DEPTH CONCRETE AND BRIDGE DECK REPAIRIH 10 · | $894,100 | $995,975 | ISI CONTRACTING, INC. | +11.4% | 2 |
| Nov 7, 2018 | 6329-88-001RMC - 632988001 | Harris Houston |
COMM CBL REP AND/OR REPLIH 610 · | $1,337,009 | $983,827 | FLORIDA TRAFFIC CONTROL DEVICES, INC. | -26.4% | 2 |
| Nov 7, 2018 | 6338-27-001RMC - 633827001 | Dallas Dallas |
STORM SEWER AND INLET CLEANINGUS 80 · | $350,840 | $871,029 | DBI SERVICES, LLC | +148.3% | 1 |
| Nov 7, 2018 | 6332-66-001RMC - 633266001 | Dallas Dallas |
POTHOLE REPAIRSH 78 · | $663,575 | $796,100 | DBI SERVICES, LLC | +20.0% | 3 |
| Nov 7, 2018 | 1053-01-016STP 2019(144) | Hall Childress |
CULVERT EXTENSIONS & SAFETY END TREATMENTSFM 658 · | $836,300 | $774,680 | CDM HOLDINGS, LLC | -7.4% | 6 |
| Nov 7, 2018 | 6335-65-001RMC - 633565001 | Runnels San Angelo |
RETRACE PAVEMENT MARKINGS AND MARKERSFM 1770 · | $719,577 | $762,761 | VIZCAINO, L.P. | +6.0% | 7 |
| Nov 7, 2018 | 0445-02-066STP 2019(174) | Lavaca Yoakum |
MILL AND INLAYUS 90A · | $778,903 | $745,425 | HUNTER INDUSTRIES, LTD. | -4.3% | 5 |
| Nov 7, 2018 | 6336-74-001RMC - 633674001 | Victoria Yoakum |
CALL OUT BRIDGE JOINTSUS 59 · | $858,035 | $634,690 | SCR CIVIL CONSTRUCTION, LLC | -26.0% | 4 |
| Nov 7, 2018 | 0604-01-043STP 2019(175)HES | Matagorda Yoakum |
WIDEN PAVED SURFACEFM 2031 · | $593,325 | $594,008 | REXCO CONSTRUCTION SERVICES, INC. | +0.1% | 3 |
| Nov 7, 2018 | 0120-05-025STP 2019(223)HES | Hamilton Waco |
INCREASE SUPERELEVATIONFM 218 · | $500,929 | $571,907 | BIG CREEK CONSTRUCTION, LTD. | +14.2% | 4 |
| Nov 7, 2018 | 6333-48-001RMC - 633348001 | Navarro Dallas |
ON-CALL TRAFFIC CONTROL SERVICESH 22 · | $482,590 | $500,300 | ELITE CASTLE RESOURCES LLC | +3.7% | 4 |
| Nov 7, 2018 | 6338-16-001RMC - 633816001 | De Witt Yoakum |
ON CALL THERMOPLASTIC PAVEMENT MARKINGSUS 183 · | $560,250 | $470,003 | BATTERSON, LLP | -16.1% | 4 |
| Nov 7, 2018 | 6335-75-001RMC - 633575001 | Waller Houston |
CLEANING AND SWEEPING HIGHWAYSUS 290 · | $526,890 | $419,720 | EXPERT MAINTENANCE & CONSTRUCTION SERVICES LLC | -20.3% | 5 |
| Nov 7, 2018 | 6333-46-001RMC - 633346001 | Hill Waco |
DRIFTWOOD & DEBRIS REMOVALSH 171 · | $397,915 | $410,990 | CROSS PLUS CONSTRUCTION, LLC | +3.3% | 2 |
| Nov 7, 2018 | 6329-58-001RMC - 632958001 | Henderson Tyler |
PAINTSH 31 · | $365,860 | $353,375 | STRIPING TECHNOLOGY, L.P. | -3.4% | 4 |
| Nov 7, 2018 | 0836-02-025STP 2019(143)HES | Bell Waco |
SAFETY LIGHTINGSH 195 · | $334,204 | $281,766 | VACA UNDERGROUND UTILITIES INC | -15.7% | 10 |
| Nov 7, 2018 | 0911-38-071STP 2019(183) | Angelina Lufkin |
LANDSCAPING_IN VARIOUS LOCATIONSVA · | $207,605 | $238,595 | GREEN SOURCE ENVIRONMENTAL SOLUTIONS, INC. | +14.9% | 3 |
| Nov 6, 2018 | 0167-01-113NH 2019(166) | El Paso El Paso |
INTERCHANGE IMPROVEMENTSUS 54 · | $97,716,680 | $96,506,598 | SUNDT CONSTRUCTION, INC. | -1.2% | 4 |
| Nov 6, 2018 | 0697-02-039STP 2019(242) | Henderson Tyler |
RECONST BRGS, GR, BS, SURF, PVT MRKSH 334 · | $40,593,999 | $43,069,729 | AUSTIN BRIDGE & ROAD SERVICES, LP | +6.1% | 5 |
| Nov 6, 2018 | 6325-60-001RMC - 632560001 | Travis Austin |
ROADSIDE MAINTENANCEIH 35 · | $46,617,578 | $39,712,405 | ROY JORGENSEN ASSOCIATES, INC. | -14.8% | 3 |
| Nov 6, 2018 | 0255-04-094C 255-4-94 | Brooks Maintenance Division |
REHABILITATE ROADWAYUS 281 · | $16,244,519 | $17,284,414 | FOREMOST PAVING, INC. | +6.4% | 4 |
| Nov 6, 2018 | 0490-03-028STP 2019(237) | Ochiltree |
BASE REPAIR AND OVERLAYSH 70 · | $13,097,047 | $13,090,322 | J. LEE MILLIGAN, INC. | -0.1% | 5 |
| Nov 6, 2018 | 0041-07-107NH 2019(212) | Potter Amarillo |
SEALCOATUS 87 · | $8,587,278 | $12,390,506 | BRANNAN PAVING CO., LTD. | +44.3% | 2 |
| Nov 6, 2018 | 0059-05-045STP 2019(181) | Shelby Lufkin |
RESURFACE WITH SEAL COATSH 7 · | $10,852,736 | $10,961,025 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +1.0% | 3 |
| Nov 6, 2018 | 0145-11-011STP 2019(158) | Floyd |
REHABILIATIONFM 97 · | $9,812,566 | $9,844,110 | GILVIN-TERRILL, LTD. | +0.3% | 5 |
| Nov 6, 2018 | 0056-02-033STP 2019(224) | Limestone Waco |
WDN SHLDRS & ADD PASS LNSUS 84 · | $9,120,814 | $9,187,964 | BIG CREEK CONSTRUCTION, LTD. | +0.7% | 5 |
| Nov 6, 2018 | 0007-03-092NH 2019(184) | Eastland Brownwood |
SEAL COAT_2019IH 20 · | $8,238,970 | $9,089,126 | BRANNAN PAVING CO., LTD. | +10.3% | 3 |
| Nov 6, 2018 | 0030-05-067STP 2019(210) | Hemphill Amarillo |
SEALCOATUS 83 · | $8,488,627 | $9,058,028 | MISSOURI PETROLEUM PRODUCTS COMPANY LLC | +6.7% | 4 |
| Nov 6, 2018 | 2263-02-098BR 2019(165) | Nueces Corpus Christi |
BRIDGE REHABILITATION (DALE MILLER BRIDGE)SH 361 · | $3,659,317 | $4,671,605 | SOUTHERN ROAD & BRIDGE, LLC | +27.7% | 4 |
| Nov 6, 2018 | 0902-00-166STP 2019(284) | Tarrant Fort Worth |
TRAFFIC SIGNALSVA · | $5,006,200 | $4,424,000 | DURABLE SPECIALTIES, INC. | -11.6% | 2 |
| Nov 6, 2018 | 0941-02-020STP 2019(177) | De Witt Yoakum |
REHABILITATE EXISTING ROADWAYFM 2656 · | $4,156,613 | $4,185,511 | TIERRA LEASE SERVICE, LLC | +0.7% | 8 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.