184Let jobs
$852,132,183Total low bids
$899,356,736Total estimates
-5.3%Low bids vs estimates
May 2026 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 7, 2026 | 0110-01-052STP 2026(528)HES | Walker Bryan |
SH 75 at FM 2296 - FY 25SH 75 · Safety Improvement Projects | $2,628,065 | $2,980,129 | BIG CREEK CONSTRUCTION, LTD. | +13.4% | 5 |
| May 7, 2026 | 0138-06-049F 2026(530) | Nacogdoches Lufkin |
US 259_SH 204 to FM 698 - OVUS 259 · Overlay | $3,029,651 | $2,886,840 | MADDEN CONTRACTING COMPANY, LLC. | -4.7% | 6 |
| May 7, 2026 | 0918-47-527F 2026(560) | Dallas Dallas |
Dallas District-Wide ADA Projects FY2026Various · Pedestrian, Sidewalks & Curb Ramps | $3,206,857 | $2,678,695 | GARRET SHIELDS INFRASTRUCTURE | -16.5% | 8 |
| May 7, 2026 | 0167-02-092STP 2026(547)HES | El Paso El Paso |
ELP_BU0054A_2-TAR (2022)BU 54A · Safety Improvement Projects | $3,003,442 | $2,479,055 | INTERNATIONAL EAGLE ENTERPRISES, INC. | -17.5% | 3 |
| May 7, 2026 | 0920-02-101STP 2026(572)MM | Liberty Beaumont |
LIBERTY-COUNTYWIDE PAVEMENT MARKINGSVarious · Traffic Control Devices | $2,871,255 | $2,407,664 | TRP INFRASTRUCTURE SERVICES, LLC | -16.1% | 4 |
| May 7, 2026 | 6488-81-001RMC - A00217203 | Robertson Bryan |
FY26 - Calvert Mill & InlaySH0006 · Routine Maintenance Project - Sealed | $2,801,463 | $2,266,508 | LONE STAR PAVING COMPANY | -19.1% | 5 |
| May 7, 2026 | 3256-02-121F 2026(604) | Harris Houston |
SL 8(N): Hardy St to Aldine WestfieldSL 8 · Overlay | $2,286,187 | $2,254,486 | ENVIRONMENTAL ALLIES, INC. | -1.4% | 5 |
| May 7, 2026 | 0920-30-090BR 2024(171) | Orange Beaumont |
S BURTON RD @ SANDY CREEK(BRIDGE REPLACES BURTON RD · Bridge Replacement | $1,780,485 | $1,783,411 | SKYLINE BRIDGE LLC | +0.2% | 3 |
| May 7, 2026 | 6500-99-001MMC - A00221205 | Lamar Paris |
Flex Base & Asph Treatment - Paris DistUS0082 · Material Maintenance Project - Sealed | $1,589,750 | $1,605,225 | C-RAE MATERIALS LLC | +1.0% | 2 |
| May 7, 2026 | 3538-01-061F 2026(601) | Montgomery Houston |
SH 242; East of IH 45SH 242 · Landscape & Scenic Enhancement | $2,218,949 | $1,579,083 | CENTRAL NORTH CONSTRUCTION, LLC | -28.8% | 7 |
| May 7, 2026 | 0921-02-571F 2026(592) | Hidalgo Pharr |
FY 2026 Striping Projects - Hidalgo CntyVarious · Traffic Control Devices | $1,785,198 | $1,281,212 | TRP INFRASTRUCTURE SERVICES, LLC | -28.2% | 5 |
| May 7, 2026 | 0463-07-055F 2B25(099) | Ector Odessa |
SH302_MarianDriveTurnLanesSH 302 · Intersection & Operational Imprv | $1,299,947 | $1,275,100 | RAGLE CONSTRUCTION, INC. | -1.9% | 3 |
| May 7, 2026 | 6500-31-001MMC - A00220732 | Randall Amarillo |
FY 27 Paint and BeadsIH0027 · Material Maintenance Project | $1,196,288 | $1,255,000 | ENNIS-FLINT, INC. | +4.9% | 2 |
| May 7, 2026 | 0916-02-025STP 2B23(117)TAPS | Kleberg Corpus Christi |
KingsvilleInterschool&Resd.Multi.ConnectVarious · Bicycle Infrastructure Improvements | $1,426,805 | $1,171,489 | 3LW CIVIL LLC | -17.9% | 8 |
| May 7, 2026 | 0073-02-092F 2026(363) | Bexar San Antonio |
SS 536: 0073-02-092: OVSS 536 · Overlay | $1,278,677 | $1,105,677 | H. L. ZUMWALT CONSTRUCTION, INC. | -13.5% | 7 |
| May 7, 2026 | 6497-67-001RMC - A00219734 | Jefferson Beaumont |
SH347 REHABILITATIONSH 347 · Routine Maintenance Project - Sealed | $1,288,965 | $1,059,849 | TEXAS MATERIALS GROUP, INC. | -17.8% | 2 |
| May 7, 2026 | 1271-01-013BR 2026(630) | Wilson San Antonio |
FM 1107; 1271-01-013; BRFM 1107 · Bridge Replacement | $1,202,996 | $948,875 | D&S CONCRETE CONTRACTORS LLC | -21.1% | 17 |
| May 7, 2026 | 0110-05-136F 2026(600) | Harris Houston |
IH 45 ML, SH 99 Exit to Spring CrkIH 45 · Restoration | $1,080,682 | $798,249 | ISI CONTRACTING, INC. | -26.1% | 2 |
| May 7, 2026 | 0921-06-373STP 2026(591)HESG | Cameron Pharr |
Price Rd. - Traffic Signal ImprovementsPRICE RD · Safety Improvement Projects | $628,778 | $750,893 | TRAF-TEX, INC. | +19.4% | 4 |
| May 7, 2026 | 6500-23-001RMC - A00220705 | Hemphill Amarillo |
Mowing Hemphill & Ochiltree FY 27US0083 · Routine Maintenance Project | $717,429 | $708,982 | BERT WHITAKER | -1.2% | 6 |
| May 7, 2026 | 0909-22-206BR 2024(707) | McLennan Waco |
BR | Old Robinson Rd @ DrainOLD ROBINSON DR · Bridge Replacement | $669,694 | $578,158 | C & W SOUTHERN LLC | -13.7% | 6 |
| May 7, 2026 | 6500-27-001RMC - A00220712 | Hutchinson Amarillo |
Mowing Hutchinson & Hansford FY 27SH0207 · Routine Maintenance Project | $642,420 | $565,330 | SQUARE G, INC. | -12.0% | 6 |
| May 7, 2026 | 0187-02-074STP 2026(574)HES | Austin Yoakum |
SH 36 INSTALL MEDIAN BARRIERS 2605SH 36 · Safety Improvement Projects | $652,746 | $559,612 | ROADWAY SPECIALTIES, INC. | -14.3% | 4 |
| May 7, 2026 | 0508-07-296F 2B25(192) | Harris Houston |
Spur 330, IH 10 to SH 146SS 330 · Traffic Control Devices | $646,245 | $556,362 | STRIPE LINES, INC. | -13.9% | 3 |
| May 7, 2026 | 6500-26-001RMC - A00220711 | Moore Amarillo |
Mowing Moore & Sherman FY 27US0287 · Routine Maintenance Project | $501,512 | $521,111 | SQUARE G, INC. | +3.9% | 6 |
| May 7, 2026 | 6500-20-001RMC - A00220700 | Potter Amarillo |
Mowing Potter & Randall FY 27US0087 · Routine Maintenance Project | $405,171 | $479,590 | ALL HANDS & DUKE, INC. | +18.4% | 6 |
| May 7, 2026 | 0914-05-250STP 2026(675)VRUG | Williamson Austin |
2025_AUS_Williamson CountyCOUNTY ROAD 366 · Safety Improvement Projects | $510,442 | $379,121 | E-Z BEL CONSTRUCTION, LLC | -25.7% | 6 |
| May 7, 2026 | 0914-04-340STP 2025(952)VRU | Travis Austin |
Traff Signal at Dessau Rd & Childress DrE DESSAU RD · Safety Improvement Projects | $442,945 | $378,536 | ELECNOR BELCO ELECTRIC, INC. | -14.5% | 5 |
| May 7, 2026 | 1024-01-087STP 2026(566)MM | Chambers Beaumont |
FM 565-BMT_SH0099_1 (2022 HSIP) ADV WARNFM 565 · Safety Improvement Projects | $379,570 | $310,773 | JASCO | -18.1% | 8 |
| May 7, 2026 | 2463-01-014STP 2026(550)HES | Hood Fort Worth |
FM 2425; from SH 144S to SH 144NFM 2425 · Safety Improvement Projects | $188,494 | $126,370 | TRP INFRASTRUCTURE SERVICES, LLC | -33.0% | 3 |
| May 6, 2026 | 0081-03-047CM 2026(559) | Denton Dallas |
US 377 FROM SOUTH OF FM 1171 TO CRAWFORDUS 377 · Widen Non-Freeway | $111,532,677 | $111,363,901 | WEBBER, LLC | -0.2% | 9 |
| May 6, 2026 | 0912-73-222F 2025(218) | Galveston Houston |
New Ferry Boat - 2025Various · Ferry Boat | $65,500,000 | $79,906,625 | THOMA-SEA MARINE CONSTRUCTORS, LLC | +22.0% | 1 |
| May 6, 2026 | 0073-08-183CM 2026(627) | Bexar San Antonio |
IH 37: 0073-08-183; FOIIH 37 · Freeway Operational Improvements | $34,315,721 | $33,122,615 | HUNTER INDUSTRIES, LTD. | -3.5% | 5 |
| May 6, 2026 | 2094-01-063F 2026(589) | Hidalgo Pharr |
209401063 FM 2220 HIDALGO (WIDEN 4 TO 6)FM 2220 · Widen Non-Freeway | $33,933,191 | $25,599,271 | IOC COMPANY LLC | -24.6% | 6 |
| May 6, 2026 | 0747-05-042C 747-5-42 | Johnson Fort Worth |
FM 157; US 67 TO 8TH ST.FM 157 · Rehabilitation of Existing Road | $18,645,847 | $17,138,491 | ED BELL CONSTRUCTION COMPANY | -8.1% | 6 |
| May 6, 2026 | 0916-35-231BR 2024(181) | Nueces Corpus Christi |
SS3 Nueces Ocean Drive Cayo Del Oso BROCEAN DR · Bridge Replacement | $14,038,391 | $14,868,485 | ANDERSON COLUMBIA CO., INC. | +5.9% | 7 |
| May 6, 2026 | 0151-02-026F 2026(606) | Burnet Austin |
SH 29 from RM 1174 to WILLIAMSON CO LINESH 29 · Intersection & Operational Imprv | $10,815,462 | $10,910,072 | TEXAS MATERIALS GROUP, INC. | +0.9% | 8 |
| May 6, 2026 | 0572-01-076F 2026(387) | Ector Odessa |
OVERLAY_SH302_SH158_SL338SH 302 · Overlay | $10,581,432 | $9,284,543 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | -12.3% | 5 |
| May 6, 2026 | 6497-68-001RMC - A00219763 | Potter Amarillo |
General Maintenance Amarillo AE FY 26IH0040 · Routine Maintenance Project - Sealed | $6,607,850 | $6,531,750 | J. LEE MILLIGAN, INC. | -1.2% | 1 |
| May 6, 2026 | 0209-01-076F 2026(605) | McLennan Waco |
OV | US 77 | FM 3148 | LP 340US 77 · Overlay | $9,476,549 | $5,957,588 | BIG CREEK CONSTRUCTION, LTD. | -37.1% | 4 |
| May 6, 2026 | 0187-05-061CM 2B25(175) | Fort Bend Houston |
SS 10: SH 36 N to IH 69SS 10 · Corridor Traffic Management | $6,524,455 | $5,436,519 | THIRD COAST SERVICES LLC | -16.7% | 7 |
| May 6, 2026 | 0177-14-038F 2026(598) | Montgomery Houston |
SL 494, Via Principale to Royal CrossingSL 494 · Overlay | $4,713,675 | $5,153,278 | DURWOOD GREENE CONSTRUCTION CO. | +9.3% | 6 |
| May 6, 2026 | 2116-01-024STP 2026(611)HES | Nacogdoches Lufkin |
FM 2259_SH 7 TO 2.55 MI S. OF SH 7FM 2259 · Safety Improvement Projects | $5,568,463 | $5,074,604 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -8.9% | 9 |
| May 6, 2026 | 0909-00-104C 909-00-104 | McLennan Waco |
PE | Districtwide Striping Project FY26Various · Traffic Control Devices | $8,127,125 | $4,467,953 | CENTERLINE TECHNOLOGIES, LLC | -45.0% | 4 |
| May 6, 2026 | 0915-00-313F 2026(631) | Bexar San Antonio |
VA: 0915-00-313: SC PrepVarious · Restoration | $6,145,410 | $4,426,974 | CLARK CONSTRUCTION OF TEXAS, INC. | -28.0% | 5 |
| May 6, 2026 | 0077-07-010BR 2026(571) | Irion San Angelo |
FM 72 at Spring Creek BridgeFM 72 · Bridge Replacement | $5,202,797 | $4,405,521 | DELGADO'S CONTRACTORS, LLC | -15.3% | 10 |
| May 6, 2026 | 0389-02-059CM 2026(567) | Chambers Beaumont |
SH 146 (@ IH10-DUAL TURN LANES NB)SH 146 · Intersection & Operational Imprv | $4,682,082 | $4,355,659 | R CONSTRUCTION CIVIL, LLC | -7.0% | 6 |
| May 6, 2026 | 0142-09-049C 142-9-49 | Kendall San Antonio |
RM 473; 0142-09-049; SFTRM 473 · Safety Improvement Projects | $4,070,599 | $4,095,968 | STX CIVIL | +0.6% | 7 |
| May 6, 2026 | 0110-04-212F 2026(599) | Montgomery Houston |
IH 45: Harris C/L to FM 1488 RestripingIH 45 · Traffic Control Devices | $5,751,399 | $3,842,368 | TRP INFRASTRUCTURE SERVICES, LLC | -33.2% | 4 |
| May 6, 2026 | 0048-04-109F 2026(562) | Ellis Dallas |
IH35E at FM 66 (Rogers St) in WaxahachieIH 35E · Traffic Control Devices | $3,999,027 | $3,796,556 | ICOS MANAGEMENT, LLC | -5.1% | 7 |
| May 6, 2026 | 1186-02-028STP 2026(607)VRU | Bastrop Austin |
FM 969 from Utley Rd to Howard LnFM 969 · Safety Improvement Projects | $3,339,794 | $3,189,429 | HUNTER INDUSTRIES, LTD. | -4.5% | 8 |
| May 6, 2026 | 6500-75-001RMC - A00220914 | Walker Bryan |
FY26 - Huntsville AO TCP - 05SH0075 · Routine Maintenance Project | $3,006,160 | $3,004,120 | AWP SAFETY | -0.1% | 2 |
| May 6, 2026 | 1410-01-026STP 2026(573)HES | Austin Yoakum |
FM 1456 REHABILITATE ROADWAY HSIP 2605FM 1456 · Safety Improvement Projects | $2,755,374 | $2,587,895 | BIG CREEK CONSTRUCTION, LTD. | -6.1% | 8 |
| May 6, 2026 | 0031-03-048BR 2026(558) | Collingsworth Childress |
US 83 SB @ Salt Fork of Red RiverUS 83 · Bridge Maintenance | $2,507,552 | $2,396,526 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | -4.4% | 13 |
| May 6, 2026 | 6500-76-001MMC - A00220915 | Rusk Tyler |
MMC HMA Rusk CountyUS0259 · Material Maintenance Project | $2,414,500 | $2,302,000 | BIG CREEK CONSTRUCTION, LTD. | -4.7% | 2 |
| May 6, 2026 | 0523-09-023F 2026(602) | Montgomery Houston |
FM 1488; FM 1774 to SH 149FM 1488 · Landscape & Scenic Enhancement | $2,821,415 | $2,127,627 | APEX LANDSCAPE & IRRIGATION, LLC | -24.6% | 5 |
| May 6, 2026 | 1586-01-093STP 2026(625)HES | Hidalgo Pharr |
FM907_1FM 907 · Safety Improvement Projects | $2,365,384 | $1,927,531 | TRAF-TEX, INC. | -18.5% | 5 |
| May 6, 2026 | 6501-31-001RMC - A00221426 | Nueces Corpus Christi |
6501-31-001 W. Nueces SweepingUS0077 · Routine Maintenance Project - Sealed | $1,925,216 | $1,829,490 | SWEEPING CORPORATION OF AMERICA, LLC | -5.0% | 1 |
| May 6, 2026 | 0643-05-067STP 2B24(385)TAPS | Grimes Bryan |
FM 3090/Blackshear St. - TASAFM 3090 · Pedestrian, Sidewalks & Curb Ramps | $2,492,627 | $1,828,629 | GARRET SHIELDS INFRASTRUCTURE | -26.6% | 10 |
| May 6, 2026 | 6498-07-001RMC - A00219886 | McLennan Waco |
Pavement Marking DistrictwideSH0006 · Routine Maintenance Project - Sealed | $2,246,617 | $1,652,460 | FC TRAFFIC CONTROL, LLC | -26.4% | 5 |
| May 6, 2026 | 0915-00-280F 2026(629) | Bexar San Antonio |
VA: 0915-00-280; TCDVarious · Traffic Control Devices | $1,499,503 | $1,571,707 | E-Z BEL CONSTRUCTION, LLC | +4.8% | 3 |
| May 6, 2026 | 6500-78-001MMC - A00220936 | Henderson Tyler |
MMC HMA Henderson CoUS0175 · Material Maintenance Project | $1,826,000 | $1,561,000 | BIG CREEK CONSTRUCTION, LTD. | -14.5% | 2 |
| May 6, 2026 | 0601-01-067F 2026(565) | Hardin Beaumont |
SH 326(US 69-S/FM 1293)REHABSH 326 · Overlay | $1,601,631 | $1,527,727 | TEXAS MATERIALS GROUP, INC. | -4.6% | 5 |
| May 6, 2026 | 0364-03-108F 2026(689) | Denton Dallas |
BS 121H Sam Rayburn Tollway to FM 2281BS 121H · Rehabilitation of Existing Road | $1,450,132 | $1,447,702 | O. TREVINO CONSTRUCTION, LLC | -0.2% | 4 |
| May 6, 2026 | 6501-83-001MMC - A00221582 | Hardin Beaumont |
FY 27 AggregateFM0787 · Material Maintenance Project - Sealed | $1,210,525 | $1,185,775 | ARCOSA LWS, LLC | -2.0% | 1 |
| May 6, 2026 | 0916-26-023BR 2024(964) | Goliad Corpus Christi |
PostOakRD Goliad At Manahuilla Cr BridgePOST OAK RD · Bridge Replacement | $1,200,910 | $1,135,008 | DELGADO'S CONTRACTORS, LLC | -5.5% | 13 |
| May 6, 2026 | 3591-01-006STP 2B24(334)TAPS | Bowie Atlanta |
Leopard Drive Shared Use Path and PedestFM 3527 · Bicycle Infrastructure Improvements | $1,157,637 | $942,426 | THK CONSTRUCTION LLC | -18.6% | 11 |
| May 6, 2026 | 0002-02-066STP 2026(556)HES | El Paso El Paso |
SH20 SAFETY (LEISURE | LAZY KNEE)SH 20 · Safety Improvement Projects | $1,100,226 | $867,336 | APOLLO CONSTRUCTORS, INC. | -21.2% | 5 |
| May 6, 2026 | 0904-00-244STP 2026(563)FRS | Potter Amarillo |
FY 26 RR SIGN AND STRIPPING VARVarious · Rail Hwy Crossing Signals/Structures | $1,100,340 | $837,809 | CENTERLINE TECHNOLOGIES, LLC | -23.9% | 1 |
| May 6, 2026 | 0901-19-212BR 2023(646) | Grayson Paris |
Rehab Historic Bridge Craft RdCRAFT RD · Bridge Replacement | $924,208 | $802,935 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -13.1% | 10 |
| May 6, 2026 | 6500-24-001RMC - A00220707 | Carson Amarillo |
Mowing Carson & Gray FY 27US0060 · Routine Maintenance Project | $885,818 | $783,954 | BERT WHITAKER | -11.5% | 6 |
| May 6, 2026 | 6500-19-001RMC - A00220699 | Potter Amarillo |
Mowing E-Way FY 27IH0040 · Routine Maintenance Project | $731,910 | $731,280 | ALL HANDS & DUKE, INC. | -0.1% | 7 |
| May 6, 2026 | 6500-25-001RMC - A00220710 | Dallam Amarillo |
Mowing Dallam & Hartley FY 27US0087 · Routine Maintenance Project | $669,356 | $724,466 | TEXAS BLACKTOPS LLC | +8.2% | 3 |
| May 6, 2026 | 0045-01-064STP 2026(595)HES | Cooke Wichita Falls |
US 82 Oak Ridge safety lightingUS 82 · Safety Improvement Projects | $798,795 | $664,203 | MARCOM'S MOWING SERVICE, LLC | -16.8% | 9 |
| May 6, 2026 | 6500-22-001RMC - A00220703 | Oldham Amarillo |
Mowing Oldham & Deaf Smith FY 27IH0040 · Routine Maintenance Project | $582,992 | $557,239 | GORMAN OUTDOOR, INC. | -4.4% | 7 |
| May 6, 2026 | 0364-01-161STP 2026(458)HES | Tarrant Fort Worth |
SH 121: WB 183 TO SB 360SH 121 · Safety Improvement Projects | $598,673 | $297,428 | STRIPE-A-ZONE, LLC | -50.3% | 2 |
| May 6, 2026 | 0883-02-095STP 2026(613)HES | Orange Beaumont |
BMT_FM0105_1(2023 HSIP)INCREASE SUPERFM 105 · Safety Improvement Projects | $120,196 | $220,723 | TEXAS MATERIALS GROUP, INC. | +83.6% | 1 |
| May 5, 2026 | 6497-76-001RMC - A00219782 | Culberson El Paso |
Van Horn- Rigid Pavement RepairIH0010 · Routine Maintenance Project | $994,580 | $1,917,794 | O. TREVINO CONSTRUCTION, LLC | +92.8% | 2 |
| May 5, 2026 | 6498-81-001RMC - A00220065 | El Paso El Paso |
Rigid Pavement Repair EAOIH0010 · Routine Maintenance Project | $998,900 | $1,650,378 | SYNERGY PROJECT CONTRACTORS, INC. | +65.2% | 3 |
| May 5, 2026 | 6495-56-001RMC - A00218911 | Brewster El Paso |
Mowing Highway Right of Way - AAOFM0170 · Routine Maintenance Project | $866,000 | $678,600 | LUKEDA SANDBLASTING & SERVICES LLC | -21.6% | 3 |
| May 5, 2026 | 6477-64-001RMC - A00213081 | Tom Green San Angelo |
Raised Pavement Markers FY 26SH0208 · Routine Maintenance Project - Sealed | $686,415 | $449,501 | ANTHONY SERVICES | -34.5% | 7 |
| May 5, 2026 | 6496-44-001MMC - A00219398 | Culberson El Paso |
AAO Flexible BaseIH0010 · Material Maintenance Project | $217,100 | $242,600 | JOBE MATERIALS, L.P. | +11.7% | 2 |
| May 4, 2026 | 6499-02-001RMC - A00220140 | Houston Lufkin |
Houston On Call Traffic ControlUS0287 · Routine Maintenance Project - Sealed | $775,525 | $1,258,375 | AWP SAFETY | +62.3% | 1 |
| May 1, 2026 | 6497-12-001SUP - A00219541 | Denton Dallas |
Denton Janitorial and Grounds FY26IH0035E · State Use Project | $77,707 | — | 0 |
101–184 of 184‹ Prev
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.