206Let jobs
$585,625,669Total low bids
$673,255,479Total estimates
-13.0%Low bids vs estimates
Jul 2021 results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Jul 2, 2021 | 6373-65-001RMC - 637365001 | Jefferson Beaumont |
SWEEPINGIH 10 · | $2,910,930 | $2,141,537 | SWEEPING SERVICES OF TEXAS - OPERATING, L.P. | -26.4% | 1 |
| Jul 2, 2021 | 0008-02-073F 2021(342) | Parker Fort Worth |
BRIDGE REPLACEMENTUS 180 · | $1,962,659 | $2,139,284 | NEW WORLD CONTRACTING, LLC | +9.0% | 7 |
| Jul 2, 2021 | 0195-03-100F 2021(900) | Denton Dallas |
CONSTRUCT RAMPSIH 35 · | $1,634,920 | $1,834,246 | JAGOE-PUBLIC COMPANY | +12.2% | 4 |
| Jul 2, 2021 | 0271-17-178C 271-17-178 | Harris Houston |
LANDSCAPE DEVELOPMENTIH 610 · | $2,024,562 | $1,794,234 | TEXAS WALL & LANDSCAPE | -11.4% | 4 |
| Jul 2, 2021 | 6377-19-001RMC - 637719001 | Tarrant Fort Worth |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSH 121 · | $1,960,500 | $1,680,326 | FOUTSCO PAVING COMPANY, LLC | -14.3% | 4 |
| Jul 2, 2021 | 6379-85-001RMC - 637985001 | Trinity Lufkin |
MILL AND INLAYSH 19 · | $1,749,058 | $1,653,622 | MOORE BROTHERS CONSTRUCTION COMPANY | -5.5% | 2 |
| Jul 2, 2021 | 6377-83-001RMC - 637783001 | Harris Houston |
CONCRETE SPALL REPAIRSL 8 · | $1,836,987 | $1,600,650 | ISI CONTRACTING, INC. | -12.9% | 3 |
| Jul 2, 2021 | 6379-57-001RMC - 637957001 | Harris Houston |
METAL BEAM GUARD FENCE REPAIRSL 8 · | $1,743,844 | $1,548,871 | ROY JORGENSEN ASSOCIATES, INC. | -11.2% | 2 |
| Jul 2, 2021 | 0499-02-031F 2021(723) | Newton Beaumont |
SURFACING/ROADWAY RESTORATIONSH 12 · | $1,586,505 | $1,509,218 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | -4.9% | 3 |
| Jul 2, 2021 | 6382-89-001RMC - 638289001 | Ellis Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 35E · | $1,511,380 | $1,445,731 | FOUTSCO PAVING COMPANY, LLC | -4.3% | 4 |
| Jul 2, 2021 | 0152-03-062STP 2021(682)FRS | Caldwell Austin |
TRAFFIC SIGNAL IMPROVEMENTSUS 183 · | $759,881 | $1,315,225 | ANGEL BROTHERS HOLDINGS CORP. | +73.1% | 3 |
| Jul 2, 2021 | 0023-05-086STP 2021(672)HES | Uvalde San Antonio |
HAZARD ELIMINATION & SAFETYUS 90 · | $1,051,481 | $1,296,838 | E-Z BEL CONSTRUCTION, LLC | +23.3% | 1 |
| Jul 2, 2021 | 6381-11-001RMC - 638111001 | Nueces Corpus Christi |
MILL AND INLAYUS 77 · | $1,040,606 | $1,295,000 | BAY LTD. | +24.4% | 1 |
| Jul 2, 2021 | 0913-18-036BR 2021(255) | Jackson Yoakum |
REPLACE BRIDGE AND APPROACHESCR · | $1,267,649 | $1,283,045 | TREVWAY, INC. | +1.2% | 3 |
| Jul 2, 2021 | 6380-47-001RMC - 638047001 | Wichita Wichita Falls |
METAL BEAM GUARD FENCE REPAIRIH 44 · | $1,287,955 | $1,230,701 | MARCOM'S MOWING SERVICE, LLC | -4.4% | 2 |
| Jul 2, 2021 | 0911-28-051BR 2B20(127) | Houston Lufkin |
BRIDGE REPLACEMENTCR · | $1,087,093 | $1,191,639 | A. L. HELMCAMP, INC. | +9.6% | 5 |
| Jul 2, 2021 | 0128-01-116F 2021(450)HES | Brown Brownwood |
SAFETY TREAT FIXED OBJECTS & RUMBLE STRIPSUS 377 · | $968,535 | $991,311 | 3LW CIVIL LLC | +2.4% | 5 |
| Jul 2, 2021 | 0913-28-075BR 2020(821) | Fayette Yoakum |
BRIDGE REPLACEMENTCR · | $753,398 | $805,991 | TREVWAY, INC. | +7.0% | 3 |
| Jul 2, 2021 | 6383-35-001RMC - 638335001 | Wichita Wichita Falls |
PAVEMENT MARKINGSUS 82 · | $779,499 | $717,366 | STRIPING TECHNOLOGY, L.P. | -8.0% | 6 |
| Jul 2, 2021 | 6382-71-001RMC - 638271001 | Grayson Paris |
FULL DEPTH CONCRETE REPAIRUS 75 · | $749,330 | $675,350 | PATHFIELD INVESTMENTS LLC | -9.9% | 7 |
| Jul 2, 2021 | 6383-15-001RMC - 638315001 | Kerr San Antonio |
PICNIC AREA MAINTENANCEIH 10 · | $619,760 | $599,880 | JCW CONSTRUCTION, LLC | -3.2% | 1 |
| Jul 2, 2021 | 0915-14-047BR 2021(063) | Wilson San Antonio |
BRIDGE REPLACEMENTCR · | $661,915 | $577,070 | HARPER BROTHERS CONSTRUCTION LLC | -12.8% | 5 |
| Jul 2, 2021 | 0919-30-062BR 2019(354) | Titus Atlanta |
BRIDGE REPLACEMENTCR · | $653,810 | $558,400 | HODGES AND SON CONSTRUCTION COMPANY, INC. | -14.6% | 5 |
| Jul 2, 2021 | 0038-04-069F 2021(731) | Zapata Pharr |
TRAFFIC SIGNAL IMPROVEMENTSUS 83 · | $673,645 | $549,124 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | -18.5% | 4 |
| Jul 2, 2021 | 0922-33-204F 2021(756) | Webb Laredo |
HAZARD ELIMINATION & SAFETYVA · | $880,768 | $548,398 | TRAF-TEX, INC. | -37.7% | 1 |
| Jul 2, 2021 | 0052-07-072STP 2021(669) | Lubbock Lubbock |
INSTALL ILLUMINATIONUS 84 · | $565,398 | $538,625 | VACA UNDERGROUND UTILITIES INC | -4.7% | 7 |
| Jul 2, 2021 | 0915-14-046BR 2021(062) | Wilson San Antonio |
BRIDGE REPLACEMENTCR · | $581,756 | $522,736 | TASCOSA BRIDGE CO., LC | -10.1% | 5 |
| Jul 2, 2021 | 6378-81-001RMC - 637881001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRIH 30 · | $525,035 | $487,381 | FOUTSCO PAVING COMPANY, LLC | -7.2% | 3 |
| Jul 2, 2021 | 6381-43-001RMC - 638143001 | Jefferson Beaumont |
REFLECTORIZED PAVEMENT MARKINGS & MARKERSUS 69 · | $667,972 | $483,872 | BARRICADES UNLIMITED | -27.6% | 6 |
| Jul 2, 2021 | 6381-65-001RMC - 638165001 | Hill Waco |
TREE TRIMMING AND BRUSH REMOVALFM 67 · | $590,823 | $481,357 | PATHFIELD INVESTMENTS LLC | -18.5% | 5 |
| Jul 2, 2021 | 0912-73-212BR 1802(833) | Galveston Houston |
REPLACE BRIDGE AND APPROACHESCS · | $429,837 | $474,034 | TREVWAY, INC. | +10.3% | 6 |
| Jul 2, 2021 | 6379-63-001RMC - 637963001 | Hidalgo Pharr |
TREE TRIMMINGIH 2 · | $437,000 | $468,400 | SAENZ UTILITY CONTRACTORS, LLC | +7.2% | 5 |
| Jul 2, 2021 | 2103-01-039F 2021(687) | Williamson Austin |
INSTALL/UPGRADE ROADWAY LIGHTINGRM 2243 · | $435,193 | $466,270 | ANGEL BROTHERS HOLDINGS CORP. | +7.1% | 2 |
| Jul 2, 2021 | 6375-69-001RMC - 637569001 | Wise Fort Worth |
MOWING HIGHWAY RIGHT OF WAYUS 81 · | $490,393 | $455,626 | CROSS PLUS CONSTRUCTION, LLC | -7.1% | 2 |
| Jul 2, 2021 | 6381-35-001RMC - 638135001 | Lamar Paris |
RAISED PAVEMENT MARKERSUS 82 · | $510,580 | $403,212 | BRYDL CONTRACTING, INC. | -21.0% | 5 |
| Jul 2, 2021 | 0143-04-071F 2021(674) | Wilson San Antonio |
LANDSCAPE DEVELOPMENTUS 87 · | $423,586 | $370,530 | ENCINO LANDSCAPE, INC. | -12.5% | 3 |
| Jul 2, 2021 | 6379-87-001RMC - 637987001 | Grayson Paris |
METAL BEAM GUARD FENCE REPAIRUS 82 · | $699,075 | $349,429 | SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC | -50.0% | 3 |
| Jul 2, 2021 | 1061-01-033STP 2020(655)HES | Liberty Beaumont |
SFT- SAFETY IMPROVEMENT PROJECTFM 1010 · | $212,482 | $311,513 | TEXAS MATERIALS GROUP, INC. | +46.6% | 1 |
| Jul 2, 2021 | 6369-15-001RMC - 636915001 | Williamson Austin |
TREE TRIMMING AND BRUSH REMOVALRM 1431 · | $358,789 | $277,920 | PATHFIELD INVESTMENTS LLC | -22.5% | 5 |
| Jul 2, 2021 | 0901-28-094BR 2B20(080) | Hopkins Paris |
BRIDGE REPLACEMENTCR · | $210,188 | $247,021 | HIGHWAY 19 CONSTRUCTION LLC | +17.5% | 4 |
| Jul 2, 2021 | 1208-01-028F 2021(755) | San Patricio Corpus Christi |
INSTALL ILLUMINATIONSH 188 · | $154,646 | $133,505 | THIRD COAST SERVICES LLC | -13.7% | 8 |
| Jul 1, 2021 | 0139-06-021C 139-6-21 | Reeves Odessa |
WIDEN ROAD - ADD LANESUS 285 · | $65,370,022 | $58,528,501 | KIEWIT INFRASTRUCTURE SOUTH CO. | -10.5% | 5 |
| Jul 1, 2021 | 0044-04-047F 2021(704) | Montague Wichita Falls |
WIDEN ROAD - ADD LANESUS 82 · | $63,899,516 | $48,462,414 | AUSTIN BRIDGE & ROAD SERVICES, LP | -24.2% | 9 |
| Jul 1, 2021 | 2660-01-011C 2660-1-11 | Dimmit Laredo |
BASE, ACP, GRAD, STR, PAV MRKS, SIGNSFM 2688 · | $11,357,045 | $10,393,729 | ANDERSON COLUMBIA CO., INC. | -8.5% | 5 |
| Jul 1, 2021 | 0215-09-035F 2021(675) | Guadalupe San Antonio |
WIDEN ROAD - ADD SHOULDERSFM 725 · | $12,891,468 | $10,378,166 | HUNTER INDUSTRIES, LTD. | -19.5% | 7 |
| Jul 1, 2021 | 0338-03-089F 2021(659) | Montgomery Houston |
HIGHWAY IMPROVEMENTSH 105 · | $12,641,479 | $9,828,203 | ISI CONTRACTING, INC. | -22.3% | 7 |
| Jul 1, 2021 | 6362-04-001RMC - 636204001 | Bowie Atlanta |
TRAFFIC CONTROLUS 59 · | $7,746,000 | $8,486,300 | ELITE CASTLE RESOURCES LLC | +9.6% | 4 |
| Jul 1, 2021 | 0455-02-027BR 2021(709) | Carson Amarillo |
BRIDGE REPLACEMENTSH 152 · | $8,924,621 | $8,225,270 | GILVIN-TERRILL, LTD. | -7.8% | 3 |
| Jul 1, 2021 | 0140-13-021F 2021(715) | Crockett San Angelo |
HAZARD ELIMINATION & SAFETYIH 10 · | $9,322,477 | $7,780,967 | VECTOR UTILITIES LLC | -16.5% | 7 |
| Jul 1, 2021 | 0691-01-040F 2021(753) | Karnes Corpus Christi |
ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDEFM 81 · | $7,903,696 | $7,699,689 | CK NEWBERRY, LLC | -2.6% | 9 |
| Jul 1, 2021 | 0822-01-021STP 2021(711)HES | Cooke Wichita Falls |
WIDEN ROAD - ADD SHOULDERSFM 371 · | $7,914,758 | $7,175,268 | EUROVIA ATLANTIC COAST LLC | -9.3% | 6 |
| Jul 1, 2021 | 0168-07-049F 2021(708) | Deaf Smith Amarillo |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 60 · | $5,551,660 | $5,647,434 | GILVIN-TERRILL, LTD. | +1.7% | 4 |
| Jul 1, 2021 | 0192-02-059F 2021(729) | Brazoria Houston |
RESURFACE ROADWAYSH 6 · | $6,009,004 | $5,272,929 | JAMES CONSTRUCTION GROUP, LLC | -12.2% | 3 |
| Jul 1, 2021 | 0581-02-151C 581-2-151 | Dallas Dallas |
PLANING, CONCRETE FDR, OVERLAY & PAVEMENT MRKSSL 12 · | $5,522,097 | $4,659,681 | TEXAS MATERIALS GROUP, INC. | -15.6% | 5 |
| Jul 1, 2021 | 0911-00-109F 2021(697) | Angelina Lufkin |
HIGHWAY IMPROVEMENTVA · | $4,952,509 | $4,639,697 | A. L. HELMCAMP, INC. | -6.3% | 4 |
| Jul 1, 2021 | 0221-03-070F 2021(726) | Red River Paris |
PREVENTIVE MAINTENANCEUS 271 · | $5,029,236 | $4,563,506 | RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | -9.3% | 4 |
| Jul 1, 2021 | 0918-47-096C 918-47-96 | Dallas Dallas |
GR, STR, AND BASE REPAIRFD · | $4,405,761 | $4,547,348 | A. L. HELMCAMP, INC. | +3.2% | 6 |
| Jul 1, 2021 | 6380-07-001RMC - 638007001 | Bowie Atlanta |
MILL AND INLAYIH 30 · | $4,249,000 | $3,873,220 | RK HALL, LLC | -8.8% | 3 |
| Jul 1, 2021 | 0408-05-028BR 2021(722) | Austin Yoakum |
BRIDGE REPLACEMENTFM 331 · | $5,771,362 | $3,813,979 | TEXAS STEEL INDUSTRIAL PLACING, LLC | -33.9% | 3 |
| Jul 1, 2021 | 0142-09-044STP 2021(673)HES | Kendall San Antonio |
HAZARD ELIMINATION & SAFETYRM 473 · | $3,953,037 | $3,777,155 | FARIS INDUSTRIES, INC. | -4.4% | 4 |
| Jul 1, 2021 | 6382-13-001RMC - 638213001 | Lamar Paris |
MILL AND INLAYBU 82H · | $4,257,897 | $3,571,148 | RK HALL, LLC | -16.1% | 2 |
| Jul 1, 2021 | 0089-19-014F 2021(720) | Victoria Yoakum |
INSTALL RAISED MEDIAN BARRIER AND SIDEWALKSBU 59-T · | $3,489,224 | $3,461,135 | TEXAS STEEL INDUSTRIAL PLACING, LLC | -0.8% | 3 |
| Jul 1, 2021 | 0053-07-040F 2021(743) | Scurry Abilene |
INSTALL/UPGRADE ROADWAY LIGHTINGUS 84 · | $2,896,172 | $3,245,690 | A. L. HELMCAMP, INC. | +12.1% | 4 |
| Jul 1, 2021 | 0834-02-031BR 2021(679) | Hill Waco |
BRIDGE REPLACEMENTFM 308 · | $3,558,120 | $3,137,766 | KNIFE RIVER CORPORATION - SOUTH | -11.8% | 7 |
| Jul 1, 2021 | 1730-01-043STP 2021(677)HES | Bandera San Antonio |
HAZARD ELIMINATION & SAFETYFM 1283 · | $3,129,991 | $2,946,881 | ANGEL BROTHERS HOLDINGS CORP. | -5.9% | 5 |
| Jul 1, 2021 | 0906-00-189C 906-00-189 | Ector Odessa |
PAVEMENT MARKINGS (NON-IH)VA · | $3,767,798 | $2,533,347 | CENTERLINE TECHNOLOGIES, LLC | -32.8% | 9 |
| Jul 1, 2021 | 0026-02-037F 2021(544) | Fayette Yoakum |
BICYCLE AND PEDESTRIAN IMPROVEMENTSUS 90 · | $3,012,747 | $2,466,461 | PROJECT ALLIED RESOURCES, LLC | -18.1% | 3 |
| Jul 1, 2021 | 0001-01-063STP 2021(688)HES | El Paso El Paso |
HAZARD ELIMINATION & SAFETYSH 20 · | $3,786,535 | $2,433,661 | HAWK CONSTRUCTION | -35.7% | 6 |
| Jul 1, 2021 | 0877-01-043F 2021(758) | Jasper Beaumont |
SURFACING/ROADWAY RESTORATIONRE 255 · | $2,208,767 | $2,233,852 | TEXAS MATERIALS GROUP, INC. | +1.1% | 4 |
| Jul 1, 2021 | 0305-07-071F 2021(757) | Orange Beaumont |
SURFACING/ROADWAY RESTORATIONSH 87 · | $2,523,304 | $1,985,537 | TEXAS MATERIALS GROUP, INC. | -21.3% | 2 |
| Jul 1, 2021 | 1194-02-019F 2021(725) | Hardin Beaumont |
SURFACING/ROADWAY RESTORATIONFM 943 · | $1,993,831 | $1,940,016 | TEXAS MATERIALS GROUP, INC. | -2.7% | 2 |
| Jul 1, 2021 | 0209-01-068C 209-1-68 | McLennan Waco |
CONSTRUCT PEDESTRIAN INFRASTRUCTURESL 2 · | $2,043,512 | $1,886,101 | PROJECT ALLIED RESOURCES, LLC | -7.7% | 7 |
| Jul 1, 2021 | 0156-02-033F 2021(707) | Wichita Wichita Falls |
HAZARD ELIMINATION & SAFETYSH 240 · | $1,864,095 | $1,829,639 | DBI SERVICES, LLC | -1.8% | 3 |
| Jul 1, 2021 | 0916-00-234C 916-00-234 | Nueces Corpus Christi |
UPGRADE SIGNAL CABINET AND INTERCONNECTIONVA · | $2,044,416 | $1,718,070 | MALDONADO-BURKETT, LLP | -16.0% | 10 |
| Jul 1, 2021 | 6383-13-001RMC - 638313001 | Washington Bryan |
TRAFFIC CONTROL SERVICESUS 290 · | $2,062,770 | $1,685,260 | PROFESSIONAL TRAFFIC CONTROL LLC | -18.3% | 3 |
| Jul 1, 2021 | 6383-14-001RMC - 638314001 | Brazos Bryan |
TRAFFIC CONTROL SERVICESSH 6 · | $2,062,870 | $1,602,255 | PROFESSIONAL TRAFFIC CONTROL LLC | -22.3% | 4 |
| Jul 1, 2021 | 0911-04-087BR 2B20(099) | Polk Lufkin |
BRIDGE REPLACEMENTCR · | $1,639,124 | $1,594,107 | THK CONSTRUCTION LLC | -2.7% | 6 |
| Jul 1, 2021 | 0902-90-184F 2021(733) | Tarrant Fort Worth |
COMMUNICATION SYSTEMVA · | $1,306,388 | $1,484,096 | AMERICAN LIGHTING AND SIGNALIZATION, LLC | +13.6% | 4 |
| Jul 1, 2021 | 0915-00-234C 915-00-234 | Bexar San Antonio |
TRAFFIC SIGNAL IMPROVEMENTSVA · | $1,562,265 | $1,384,854 | VACA UNDERGROUND UTILITIES INC | -11.4% | 5 |
| Jul 1, 2021 | 0955-01-027STP 2021(719)HES | Burleson Bryan |
SAFETY TREAT FIXED OBJECTSFM 166 · | $1,368,257 | $1,378,418 | ENCINO LANDSCAPE, INC. | +0.7% | 4 |
| Jul 1, 2021 | 0127-02-148F 2021(747) | Eastland Brownwood |
RESURFACE ROADWAYUS 183 · | $1,483,635 | $1,372,072 | BIG CREEK CONSTRUCTION, LTD. | -7.5% | 9 |
| Jul 1, 2021 | 0113-07-075CC 113-7-75 | Hays Austin |
INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TUS 290 · | $1,294,299 | $1,353,925 | RELMCO, INC. | +4.6% | 9 |
| Jul 1, 2021 | 6379-90-001RMC - 637990001 | Hopkins Paris |
FULL DEPTH CONCRETE REPAIRIH 30 · | $1,537,120 | $1,238,768 | GHB EQUIPMENT COMPANY, L.L.C. | -19.4% | 6 |
| Jul 1, 2021 | 0473-02-041F 2021(684) | Lee Austin |
INSTALL ADVANCED WARNING SIGNALS AND SIGNSSH 21 · | $1,204,745 | $1,219,930 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., INC. | +1.3% | 2 |
| Jul 1, 2021 | 1378-01-047F 2021(686) | Travis Austin |
INSTALL/UPGRADE ROADWAY LIGHTINGRM 1431 · | $1,326,051 | $1,213,911 | AUSTIN UNDERGROUND INCORPORATED | -8.5% | 3 |
| Jul 1, 2021 | 2121-04-121C 2121-4-121 | El Paso El Paso |
PREVENTIVE MAINTENANCEIH 10 · | $1,070,953 | $1,097,606 | PENHALL COMPANY | +2.5% | 5 |
| Jul 1, 2021 | 6381-21-001RMC - 638121001 | Jasper Beaumont |
TREE TRIMMING AND BRUSH REMOVALUS 190 · | $1,333,024 | $1,009,791 | BOEN LANDSCAPING & IRRIGATION, LLC | -24.2% | 2 |
| Jul 1, 2021 | 0110-01-049F 2021(717) | Walker Bryan |
INTERSECTION IMPROVEMENTS WITH TURN LANESSH 75 · | $908,262 | $946,422 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | +4.2% | 5 |
| Jul 1, 2021 | 0530-01-007C 530-1-7 | Bastrop Austin |
STATE PARK IMPROVEMENTSPR 1A · | $1,021,630 | $941,091 | BECK-REIT & SONS, LTD. | -7.9% | 6 |
| Jul 1, 2021 | 6380-32-001RMC - 638032001 | Orange Beaumont |
FLEXIBLE PAVEMENT STRUCTURE REPAIRFM 1006 · | $1,157,597 | $802,871 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -30.6% | 3 |
| Jul 1, 2021 | 0924-06-635C 924-6-635 | El Paso El Paso |
LANDSCAPE DEVELOPMENTVA · | $744,422 | $797,516 | MARTINEZ BROS. CONTRACTORS, LLC | +7.1% | 4 |
| Jul 1, 2021 | 6377-32-001BPM - 637732001 | Archer Wichita Falls |
BRIDGE PREVENTATIVE MAINTENANCESH 79 · | $1,010,622 | $758,086 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | -25.0% | 5 |
| Jul 1, 2021 | 6373-94-001RMC - 637394001 | Brazos Bryan |
HMA MILL & INLAYBS 6R · | $732,160 | $708,467 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -3.2% | 4 |
| Jul 1, 2021 | 6378-82-001RMC - 637882001 | Dallas Dallas |
FLEXIBLE PAVEMENT STRUCTURE REPAIRSS 408 · | $692,319 | $649,952 | FOUTSCO PAVING COMPANY, LLC | -6.1% | 3 |
| Jul 1, 2021 | 6376-13-001RMC - 637613001 | Washington Bryan |
SPOT BASE REPAIRUS 290 · | $920,237 | $638,324 | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | -30.6% | 4 |
| Jul 1, 2021 | 6369-61-001RMC - 636961001 | Fayette Yoakum |
METAL BEAM GF UPGRADE/CONCRETE REPAIRSIH 10 · | $1,234,640 | $622,670 | SOUTHEAST HIGHWAY GUARDRAIL & ATTENUATORS, LLC | -49.6% | 3 |
| Jul 1, 2021 | 0912-00-641F 2021(730) | Harris Houston |
HAZARD ELIMINATION & SAFETYVA · | $618,593 | $611,636 | VACA UNDERGROUND UTILITIES INC | -1.1% | 5 |
| Jul 1, 2021 | 0912-56-056BR 2019(422) | Waller Houston |
REPLACE BRIDGE AND APPROACHESCR · | $554,885 | $560,102 | TREVWAY, INC. | +0.9% | 10 |
| Jul 1, 2021 | 6380-65-001RMC - 638065001 | Galveston Houston |
FULL DEPTH CONCRETE REPAIRFM 518 · | $612,046 | $526,275 | DBI SERVICES, LLC | -14.0% | 3 |
| Jul 1, 2021 | 0901-29-094BR 2B20(161) | Lamar Paris |
REHABILITATE BRIDGECS · | $453,962 | $499,929 | HIGHWAY 19 CONSTRUCTION LLC | +10.1% | 6 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.