| 1 | 104-6010 |
REMOVING CONC (RIPRAP) | 12 | CY |
$100.00 |
$87.00 |
$75.00 |
| 2 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 39 | CY |
$50.00 |
$61.00 |
$55.00 |
| 3 | 134-6001 |
BACKFILL (TY A) | 191 | STA |
$165.00 |
$195.00 |
$190.00 |
| 4 | 150-6002 |
BLADING | 80 | HR |
$72.00 |
$100.00 |
$110.00 |
| 5 | 162-6002 |
BLOCK SODDING | 135 | SY |
$10.00 |
$12.55 |
$10.00 |
| 6 | 168-6001 |
VEGETATIVE WATERING | 107 | MG |
$40.00 |
$18.00 |
$25.00 |
| 7 | 247-6001 |
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH) | 3,292 | CY |
$65.00 |
$99.00 |
$65.00 |
| 8 | 275-6001 |
CEMENT | 1,156 | TON |
$200.00 |
$225.00 |
$235.00 |
| 9 | 275-6014 |
CEMENT TREAT (MX EXST MTL & NW BS)(8") | 59,251 | SY |
$3.60 |
$2.15 |
$4.35 |
| 10 | 316-6029 |
ASPH (RC-250) | 11,851 | GAL |
$4.00 |
$3.45 |
$4.50 |
| 11 | 316-6485 |
AGGR (TY-D GR-5 OR TY-L GR-5) | 439 | CY |
$140.00 |
$196.00 |
$175.00 |
| 12 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 623 | SY |
$13.50 |
$10.15 |
$10.00 |
| 13 | 400-6005 |
CEM STABIL BKFL | 75 | CY |
$75.00 |
$101.00 |
$131.00 |
| 14 | 400-6008 |
CUT & RESTORE ASPH PAVING | 75 | SY |
$98.00 |
$116.00 |
$142.00 |
| 15 | 432-6016 |
RIPRAP (STONE TY R)(DRY)(12 IN) | 11 | CY |
$140.00 |
$161.00 |
$105.00 |
| 16 | 464-6004 |
RC PIPE (CL III)(21 IN) | 56 | LF |
$420.00 |
$116.00 |
$116.00 |
| 17 | 464-6005 |
RC PIPE (CL III)(24 IN) | 176 | LF |
$60.00 |
$128.00 |
$126.00 |
| 18 | 464-6006 |
RC PIPE (CL III)(27 IN) | 56 | LF |
$100.00 |
$156.00 |
$147.00 |
| 19 | 464-6007 |
RC PIPE (CL III)(30 IN) | 148 | LF |
$125.00 |
$166.00 |
$163.00 |
| 20 | 464-6010 |
RC PIPE (CL III)(48 IN) | 20 | LF |
$255.00 |
$231.00 |
$231.00 |
| 21 | 496-6007 |
REMOV STR (PIPE) | 351 | LF |
$20.00 |
$19.00 |
$16.00 |
| 22 | 500-6001 |
MOBILIZATION | 1 | LS |
$174,876.00 |
$164,000.00 |
$200,000.00 |
| 23 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$3,500.00 |
$2,000.00 |
$4,200.00 |
| 24 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 1,000 | LF |
$6.00 |
$3.51 |
$3.68 |
| 25 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,000 | LF |
$1.50 |
$1.01 |
$1.05 |
| 26 | 530-6008 |
TURNOUTS (ACP) | 20 | SY |
$260.00 |
$96.00 |
$250.00 |
| 27 | 530-6016 |
DRIVEWAYS (BASE) | 628 | SY |
$40.00 |
$38.00 |
$11.00 |
| 28 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 38,090 | LF |
$0.1500 |
$0.0900 |
$0.4300 |
| 29 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 19,045 | LF |
$0.2100 |
$0.0900 |
$0.4400 |
| 30 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 1 | EA |
$600.00 |
$596.00 |
$625.00 |
| 31 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 1 | EA |
$485.00 |
$496.00 |
$520.00 |
| 32 | 644-6076 |
REMOVE SM RD SN SUP&AM | 1 | EA |
$75.00 |
$96.00 |
$100.00 |
| 33 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 38,090 | LF |
$0.3000 |
$0.3800 |
$0.2700 |
| 34 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 583 | EA |
$1.00 |
$2.36 |
$0.7500 |
| 35 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 38,090 | LF |
$0.3600 |
$0.3500 |
$0.3400 |
| 36 | 666-6311 |
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) | 4,620 | LF |
$0.3600 |
$0.3500 |
$0.3400 |
| 37 | 666-6314 |
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | 4,707 | LF |
$0.3600 |
$0.3500 |
$0.3400 |
| 38 | 672-6009 |
REFL PAV MRKR TY II-A-A | 309 | EA |
$3.70 |
$3.01 |
$4.04 |
| 39 | 3076-6066 |
TACK COAT | 5,926 | GAL |
$3.00 |
$3.52 |
$3.20 |
| 40 | 3077-6033 |
SP MIXES SP-C SAC-A PG76-22 | 6,518 | TON |
$115.00 |
$98.00 |
$102.00 |
| 41 | 6185-6002 |
TMA (STATIONARY) | 130 | DAY |
$225.00 |
$238.00 |
$65.00 |
| 42 | 6185-6005 |
TMA (MOBILE OPERATION) | 10 | DAY |
$100.00 |
$204.00 |
$65.00 |
| 43 | 6227-6002 |
SOLAR POWERED LED ROADSIDE SIGN | 1 | EA |
$4,313.00 |
$4,800.00 |
$5,050.00 |