Contact information
- info@skylinebridge.net
- Phone
- (903) 941-8511
- Address
- 4633 OSTRICH ROAD, GILMER, TX 75645
- TxDOT prequalification
- Construction qualified
77BidsApr 4, 2024 to Aug 6, 2026
10Wins (low bidder)
13.0%Win rate
$24,623,918Total won
Competitor scorecard
Last 5 years in Texas13.0%Win rate10 of 77 bids
+1.5%Average bid vs estimate
-9.1%Winning bids vs estimate
+20.8%Over the low bid when they loseAverage field: 8.5 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| HODGES AND SON CONSTRUCTION COMPANY, INC. | 56 | 36 | 20 | 64% |
| THK CONSTRUCTION LLC | 31 | 10 | 21 | 32% |
| TALBERT COMPANIES LLC | 27 | 16 | 11 | 59% |
| GARRET SHIELDS INFRASTRUCTURE | 24 | 14 | 10 | 58% |
| STX CIVIL | 23 | 13 | 10 | 57% |
| EAST TEXAS BRIDGE, INC. | 18 | 13 | 5 | 72% |
| C. E. BARKER, LTD. | 18 | 12 | 6 | 67% |
| COPPELL CONSTRUCTION CO., INC. | 17 | 15 | 2 | 88% |
| TUCAN CONTRACTING, LLC | 15 | 7 | 8 | 47% |
| KNIFE RIVER CORPORATION - SOUTH | 15 | 8 | 7 | 53% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Aug 6, 2026 | 0911-28-082 | CR 1170 at Sikes Creek - HBPHouston · Lufkin | 3 of 6 | $3,029,411 | $2,809,388THK CONSTRUCTION LLC | +7.8% |
| Aug 5, 2026 | 0901-29-100 | CR 35080 Bridge ReplacementLamar · Paris | 5 of 8 | $990,876 | $800,948HODGES AND SON CONSTRUCTION… | +23.7% |
| Jun 2, 2026 | 0919-13-020 | CR 430 at McFaddin Creek TributaryPanola · Atlanta | 5 of 7 | $2,722,137 | $2,349,069THK CONSTRUCTION LLC | +15.9% |
| Jun 2, 2026 | 0105-04-047 | SH 70 @ Quitaque RiverMotley · Childress | 1 of 9 | $3,403,214 | $3,403,214 | Won |
| May 7, 2026 | 0920-30-090 | S BURTON RD @ SANDY CREEK(BRIDGE REPLACEOrange · Beaumont | 1 of 3 | $1,783,411 | $1,783,411 | Won |
| May 7, 2026 | 1271-01-013 | FM 1107; 1271-01-013; BRWilson · San Antonio | 9 of 17 | $1,190,954 | $948,875D&S CONCRETE CONTRACTORS LLC | +25.5% |
| May 6, 2026 | 3591-01-006 | Leopard Drive Shared Use Path and PedestBowie · Atlanta | 4 of 11 | $1,118,110 | $942,426THK CONSTRUCTION LLC | +18.6% |
| May 6, 2026 | 0643-05-067 | FM 3090/Blackshear St. - TASAGrimes · Bryan | 7 of 10 | $2,547,377 | $1,828,629GARRET SHIELDS INFRASTRUCTU… | +39.3% |
| May 6, 2026 | 0901-19-212 | Rehab Historic Bridge Craft RdGrayson · Paris | 6 of 10 | $979,968 | $802,935HODGES AND SON CONSTRUCTION… | +22.0% |
| May 6, 2026 | 0077-07-010 | FM 72 at Spring Creek BridgeIrion · San Angelo | 2 of 10 | $4,543,261 | $4,405,521DELGADO'S CONTRACTORS, LLC | +3.1% |
| Apr 8, 2026 | 0908-23-058 | REPLACE BRIDGE CR 305 @ ALKALI CRK TRIBFisher · Abilene | 3 of 7 | $1,915,919 | $1,880,830TUCAN CONTRACTING, LLC | +1.9% |
| Apr 8, 2026 | 0909-40-081 | BR | @ WILLIAMS CREEK |(MAP #2)Limestone · Waco | 6 of 10 | $1,983,586 | $1,810,423TUCAN CONTRACTING, LLC | +9.6% |
| Apr 8, 2026 | 0902-51-029 | CS; OLD GRANBURY RD OVER WALNUT CRKHood · Fort Worth | 3 of 8 | $663,794 | $632,977GARRET SHIELDS INFRASTRUCTU… | +4.9% |
| Apr 8, 2026 | 1790-02-048 | SL 323, S. OF US 271 - UPRR, BRGSmith · Tyler | 2 of 9 | $1,528,970 | $1,516,226DRAKE COMPANIES LLC | +0.8% |
| Apr 7, 2026 | 0917-19-062 | CR 830 AT EAST FORK OF MILL CREEK - BRWashington · Bryan | 2 of 9 | $770,647 | $732,054GARRET SHIELDS INFRASTRUCTU… | +5.3% |
| Apr 7, 2026 | 0909-38-100 | BR | CR 325 | FCR 461 @ Hog CreekFalls · Waco | 2 of 12 | $1,087,358 | $1,047,281BLACKSMITH VENTURES LLC | +3.8% |
| Apr 7, 2026 | 0218-05-037 | SH 11 from US 59 to FM 130Cass · Atlanta | 1 of 10 | $1,793,826 | $1,793,826 | Won |
| Apr 7, 2026 | 0908-23-045 | CR 412 AT COTTONWOOD CRK TRIBFisher · Abilene | 1 of 6 | $3,158,064 | $3,158,064 | Won |
| Mar 5, 2026 | 0920-06-040 | CR 2018 @Hackberry Branch Brg ReplaceNewton · Beaumont | 5 of 8 | $1,872,638 | $1,485,796HODGES AND SON CONSTRUCTION… | +26.0% |
| Mar 5, 2026 | 1097-01-018 | Loring Creek ReliefHunt · Paris | 3 of 12 | $2,246,938 | $2,085,509HODGES AND SON CONSTRUCTION… | +7.7% |
| Mar 5, 2026 | 0394-03-045 | FM 699 at Unnamed Trib of Eight Mile CkPanola · Atlanta | 4 of 10 | $710,481 | $492,768C & W SOUTHERN LLC | +44.2% |
| Mar 5, 2026 | 0901-19-229 | Katy Trail Phase TwoGrayson · Paris | 5 of 11 | $2,896,712 | $2,744,602SCOUT 5 CONSTRUCTION LLC | +5.5% |
| Mar 5, 2026 | 0910-00-141 | 2026 District Wide ADASmith · Tyler | 14 of 14 | $1,791,319 | $1,038,973GARRET SHIELDS INFRASTRUCTU… | +72.4% |
| Feb 5, 2026 | 0918-18-142 | NW CR 4340 at Frost BranchNavarro · Dallas | 8 of 15 | $1,519,406 | $1,223,665TUCAN CONTRACTING, LLC | +24.2% |
| Feb 5, 2026 | 0446-06-018 | FM 1093 BRIDGE REPLACEMENT 2610Austin · Yoakum | 5 of 12 | $5,777,135 | $4,981,962R CONSTRUCTION CIVIL, LLC | +16.0% |
| Feb 5, 2026 | 0912-34-213 | CR 234 (C Meyer Rd) at Bee CreekFort Bend · Houston | 5 of 9 | $2,320,680 | $1,818,854TREVWAY, INC. | +27.6% |
| Feb 5, 2026 | 0902-49-074 | CR 351; at Bell BranchErath · Fort Worth | 5 of 12 | $690,708 | $625,625DELGADO'S CONTRACTORS, LLC | +10.4% |
| Feb 4, 2026 | 0912-34-207 | CR 209 (Hopkins Rd) at Turkey CreekFort Bend · Houston | 5 of 13 | $3,324,398 | $2,787,245TREVWAY, INC. | +19.3% |
| Feb 4, 2026 | 0902-20-097 | CR; ROBERTS RD AT PANTHER CREEKWise · Fort Worth | 4 of 9 | $966,060 | $875,772THK CONSTRUCTION LLC | +10.3% |
| Oct 9, 2025 | 0546-01-040 | FM 71 at Lacy CreekTitus · Atlanta | 7 of 7 | $1,571,258 | $1,331,903THK CONSTRUCTION LLC | +18.0% |
| Oct 9, 2025 | 0043-06-097 | US 70 at FM 1763Wilbarger · Wichita Falls | 3 of 5 | $4,154,672 | $3,176,311ALTUS CONSTRUCTION LLC | +30.8% |
| Oct 9, 2025 | 0908-20-029 | REPLACE BRIDGE CR 314 at DRAWNolan · Abilene | 2 of 8 | $929,935 | $918,429DELGADO'S CONTRACTORS, LLC | +1.3% |
| Oct 9, 2025 | 0901-19-222 | Calf Creek Rd Bridge ReplacementGrayson · Paris | 4 of 10 | $2,899,947 | $2,742,958HIGHWAY 19 CONSTRUCTION LLC | +5.7% |
| Oct 8, 2025 | 0903-06-027 | Hancock St at Dry Frk Lttle WichitaClay · Wichita Falls | 2 of 8 | $1,155,641 | $1,149,814HODGES AND SON CONSTRUCTION… | +0.5% |
| Oct 8, 2025 | 0903-30-047 | CR 238 (Sign CR 128W) at Paradise CreekWilbarger · Wichita Falls | 1 of 5 | $1,424,111 | $1,424,111 | Won |
| Sep 5, 2025 | 0574-02-022 | FM 636 at Willow CreekNavarro · Dallas | 2 of 8 | $9,894,124 | $9,649,382INDUS ROAD & BRIDGE, INC. | +2.5% |
| Sep 4, 2025 | 2591-01-015 | FM 2610_At Menard Creek - HBPPolk · Lufkin | 3 of 7 | $2,654,652 | $2,472,737THK CONSTRUCTION LLC | +7.4% |
| Sep 4, 2025 | 0918-46-300 | TRINITY ROAD AT COOPER CREEK IN CITY OFDenton · Dallas | 1 of 8 | $1,636,169 | $1,636,169 | Won |
| Aug 8, 2025 | 1161-02-014 | FM 855, US 69-US 175, SFTYCherokee · Tyler | 2 of 13 | $4,685,132 | $4,101,4393LW CIVIL LLC | +14.2% |
| Aug 8, 2025 | 0902-38-135 | Kings Gate Rd: at Clear Fork Trinity RvParker · Fort Worth | 7 of 8 | $1,867,514 | $1,536,599WESTFIELD INSURANCE COMPANY | +21.5% |
| Aug 7, 2025 | 0911-39-074 | CR 3689_At Cypress Creek - HBPShelby · Lufkin | 8 of 8 | $2,087,399 | $1,630,098HODGES AND SON CONSTRUCTION… | +28.1% |
| Jul 2, 2025 | 0982-05-011 | FM 923 at Bush Knob CrThrockmorton · Wichita Falls | 4 of 8 | $751,775 | $728,607C & W SOUTHERN LLC | +3.2% |
| Jul 2, 2025 | 0911-28-061 | CR 4700_LEE CREEK - HBPHouston · Lufkin | 2 of 6 | $1,478,125 | $1,408,212BLACKSMITH VENTURES LLC | +5.0% |
| Jul 1, 2025 | 0901-19-221 | Prescott Rd Bridge ReplacementGrayson · Paris | 8 of 11 | $2,968,416 | $2,294,027RB CONTRACTING, LLC | +29.4% |
| Jul 1, 2025 | 0903-15-106 | CR 258/SIGN CR 341 at DrawCooke · Wichita Falls | 3 of 8 | $2,657,249 | $2,437,821THK CONSTRUCTION LLC | +9.0% |
| Jun 5, 2025 | 0925-10-037 | CR 20 @ Lelia Lake Creek DonleyDonley · Childress | 1 of 10 | $954,735 | $954,735 | Won |
| Jun 5, 2025 | 0911-04-098 | Bering Road at Long King Creek - HBPPolk · Lufkin | 3 of 8 | $1,853,190 | $1,653,086TRUE ROADS CONSTRUCTION LLC | +12.1% |
| Jun 4, 2025 | 0909-29-047 | BR | @ Leon River | Map #206Hamilton · Waco | 7 of 11 | $4,918,259 | $4,196,407COPPELL CONSTRUCTION CO., I… | +17.2% |
| May 2, 2025 | 0403-01-050 | SH 156 SB_STEPHENS CREEK - BSSPSan Jacinto · Lufkin | 1 of 8 | $4,304,421 | $4,304,421 | Won |
| Mar 4, 2025 | 0902-49-076 | CR 270; AT TRIBUTARY TO NORTH BOSQUEErath · Fort Worth | 6 of 8 | $1,538,436 | $1,421,220KNIFE RIVER CORPORATION - S… | +8.2% |
| Jan 8, 2025 | 0910-12-143 | E.Tyler St, Mill Creek, RBRVan Zandt · Tyler | 6 of 8 | $1,448,657 | $1,162,543EAST TEXAS BRIDGE, INC. | +24.6% |
| Jan 8, 2025 | 0901-19-216 | Bridge Replacement Sister Grove CreekGrayson · Paris | 2 of 6 | $1,972,279 | $1,816,247THK CONSTRUCTION LLC | +8.6% |
| Jan 8, 2025 | 0907-13-017 | 0907-13-017 CR REPLACE BRIDGE AND APPROARunnels · San Angelo | 4 of 8 | $2,637,977 | $1,997,089J. H. STRAIN & SONS, INC. | +32.1% |
| Jan 7, 2025 | 0283-03-024 | SH 79 Str 03-005-0283-03-005 Repl Culv MArcher · Wichita Falls | 1 of 6 | $3,345,238 | $3,345,238 | Won |
| Dec 4, 2024 | 6475-66-001 | FY 25 Post RDC Bagged ASPPMGarza · Maintenance Division | 4 of 5 | $226,700 | $125,000WALLER COUNTY ASPHALT INC. | +81.4% |
| Dec 4, 2024 | 6475-67-001 | FY 25 Athens RDC Bagged ASPPMHenderson · Maintenance Division | 4 of 5 | $260,880 | $150,000WALLER COUNTY ASPHALT INC. | +73.9% |
| Dec 4, 2024 | 6475-63-001 | FY 25 Post RDC Pre-Packaged ConcreteGarza · Maintenance Division | 5 of 7 | $202,980 | $159,800AKA-MATERIALS | +27.0% |
| Dec 4, 2024 | 6475-64-001 | FY 25 Athens RDC Pre-Packaged ConcreteHenderson · Maintenance Division | 4 of 6 | $202,980 | $151,980AKA-MATERIALS | +33.6% |
| Dec 4, 2024 | 0913-22-055 | CR 189 BRIDGE REPLACEMENT 2512Gonzales · Yoakum | 3 of 7 | $3,673,786 | $2,979,227TREVWAY, INC. | +23.3% |
| Dec 3, 2024 | 0923-23-032 | CR 508 at Draw Mills CountyMills · Brownwood | 2 of 9 | $1,576,684 | $1,470,000DELGADO'S CONTRACTORS, LLC | +7.3% |
| Dec 3, 2024 | 0909-38-090 | BR | FCR 157 @ COPPERAS CREEK |(MAP #83)Falls · Waco | 1 of 8 | $2,820,729 | $2,820,729 | Won |
| Nov 7, 2024 | 0919-19-088 | Kennedy Lane Bicycle & Ped ImprovementsBowie · Atlanta | 8 of 8 | $2,950,254 | $1,777,958THK CONSTRUCTION LLC | +65.9% |
| Nov 7, 2024 | 0807-03-038 | FM 153 BRIDGE REPLACEMENT 2504Fayette · Yoakum | 5 of 8 | $3,379,406 | $2,524,150ACME BRIDGE COMPANY, INC. | +33.9% |
| Nov 6, 2024 | 3285-01-009 | FM 3201 Culvert ReplacementStephens · Brownwood | 5 of 11 | $598,024 | $501,899YOKO EXCAVATING, LLC | +19.2% |
| Nov 6, 2024 | 0221-01-083 | BU 271 SidewalkLamar · Paris | 9 of 9 | $4,134,142 | $2,222,429THK CONSTRUCTION LLC | +86.0% |
| Nov 6, 2024 | 0902-40-032 | CAMPSEY RD OVER TRIB OF CROOKED CREEKJack · Fort Worth | 2 of 6 | $805,165 | $788,118YOKO EXCAVATING, LLC | +2.2% |
| Aug 1, 2024 | 0909-37-068 | BRIDGE REPLACEMENTHill · Waco | 4 of 6 | $961,090 | $759,759PMCO CONSTRUCTION LLC | +26.5% |
| Aug 1, 2024 | 0901-28-105 | BRIDGE REPLACEMENTHopkins · Paris | 4 of 5 | $694,429 | $562,559THK CONSTRUCTION LLC | +23.4% |
| Jul 9, 2024 | 0612-01-046 | BRIDGE REPLACEMENTFreestone · Bryan | 2 of 7 | $2,853,360 | $2,767,000PMCO CONSTRUCTION LLC | +3.1% |
| Jun 6, 2024 | 0548-04-025 | BRIDGE REPLACEMENTHoward · Abilene | 3 of 5 | $2,578,954 | $2,389,848TALBERT COMPANIES LLC | +7.9% |
| Jun 6, 2024 | 0911-39-069 | BRIDGE REPLACEMENTShelby · Lufkin | 2 of 6 | $687,267 | $584,995THK CONSTRUCTION LLC | +17.5% |
| Jun 5, 2024 | 0917-30-053 | BRIDGE REPLACEMENTBurleson · Bryan | 3 of 6 | $1,381,730 | $1,209,203A GREATER AUSTIN DEVELOPMEN… | +14.3% |
| Jun 5, 2024 | 0919-30-061 | BRIDGE REPLACEMENTTitus · Atlanta | 3 of 8 | $836,102 | $723,297THK CONSTRUCTION LLC | +15.6% |
| Jun 5, 2024 | 0925-09-036 | BRIDGE REPLACEMENTHall · Childress | 3 of 6 | $922,290 | $879,885THK CONSTRUCTION LLC | +4.8% |
| May 3, 2024 | 0596-01-019 | REPL BR & APPRSHill · Waco | 4 of 5 | $3,233,846 | $2,469,349KNIFE RIVER CORPORATION - S… | +31.0% |
| May 3, 2024 | 0917-12-088 | BRIDGE REPLACEMENTMilam · Bryan | 6 of 10 | $1,302,619 | $974,112C. E. BARKER, LTD. | +33.7% |
| Apr 4, 2024 | 0913-28-092 | BRIDGE REPLACEMENTFayette · Yoakum | 8 of 10 | $1,315,717 | $954,925C. E. BARKER, LTD. | +37.8% |
Active prime contracts 5
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0903-30-047Let Oct 8, 2025 | WilbargerWichita Falls · CR | BRIDGE REPLACEMENT | $1,434,111 | 94% | |
| 0918-46-300Let Sep 4, 2025 | DentonDallas · CS | BRIDGE REPLACEMENT | $1,695,057 | 98% | |
| 0403-01-050Let May 2, 2025 | San JacintoLufkin · SH 156 | BRIDGE REPLACEMENT | $4,349,380 | 79% | |
| 0283-03-024Let Jan 7, 2025 | ArcherWichita Falls · SH 79 | BRIDGE REPLACEMENT | $3,352,238 | 84% | |
| 0923-08-030Let Oct 1, 2024 | ColemanBrownwood · CS | BRIDGE REPLACEMENT | $1,788,508 | 102% |
Subcontracts on active jobs 7
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0921-06-366Let Mar 4, 2026 | LUCANIA CONTRACTORS LLC | CameronPharr | BRIDGE REPLACEMENT | 9.59% | $134,897 |
| 1262-01-016Let Dec 3, 2025 | HUNTER INDUSTRIES, LTD. | FayetteYoakum | BRIDGE REPLACEMENT | 7.09% | $98,380 |
| 0716-03-012Let Dec 3, 2025 | HUNTER INDUSTRIES, LTD. | ColoradoYoakum | BRIDGE REPLACEMENT | 6.05% | $98,670 |
| 0921-06-342Let Aug 7, 2025 | LUCANIA CONTRACTORS LLC | CameronPharr | BRIDGE REPLACEMENT | 12.28% | $203,530 |
| 0913-09-120Let Jun 5, 2025 | TREVWAY, INC. | WhartonYoakum | BRIDGE REPLACEMENT | 15.26% | $404,129 |
| 0042-12-089Let Sep 6, 2024 | WESTFIELD INSURANCE COMPANY | ChildressChildress | BRIDGE REPLACEMENT | 65.65% | $2,684,174 |
| 0548-04-025Let Jun 6, 2024 | WESTFIELD INSURANCE COMPANY | HowardAbilene | BRIDGE REPLACEMENT | 76.81% | $1,948,675 |