Contact information
- ward@scci1992.com
- Phone
- (940) 479-2970
- Fax
- (940) 479-2971
- Address
- 7484 FM 2449, PONDER, TX 76259
- TxDOT prequalification
- Construction qualified
85BidsOct 8, 2013 to Nov 4, 2026
19Wins (low bidder)
22.4%Win rate
$42,145,274Total won
Competitor scorecard
Last 5 years in Texas16.7%Win rate6 of 36 bids
+10.7%Average bid vs estimate
-5.6%Winning bids vs estimate
+33.0%Over the low bid when they loseAverage field: 6.0 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| O. TREVINO CONSTRUCTION, LLC | 19 | 6 | 13 | 32% |
| SCR CIVIL CONSTRUCTION, LLC | 11 | 5 | 6 | 45% |
| GARRET SHIELDS INFRASTRUCTURE | 9 | 4 | 5 | 44% |
| GREY SKY CONSTRUCTION LLC | 9 | 8 | 1 | 89% |
| BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | 7 | 5 | 2 | 71% |
| ROY JORGENSEN ASSOCIATES, INC. | 7 | 3 | 4 | 43% |
| RAGLE CONSTRUCTION, INC. | 6 | 2 | 4 | 33% |
| HJC FARMS, INC. | 6 | 1 | 5 | 17% |
| ED BELL CONSTRUCTION COMPANY | 6 | 2 | 4 | 33% |
| GRATIOT CONSTRUCTION, LTD. | 5 | 0 | 5 | 0% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 4, 2026 | 0353-01-031 | SH 114 at Alliance BlvdWise · Fort Worth | 5 of 7 | $649,060 | $482,224XIT PAVING AND CONSTRUCTION… | +34.6% |
| Sep 3, 2026 | 2266-02-169 | SH 360; Arkansas Ln to SH 180Tarrant · Fort Worth | 4 of 6 | $5,120,757 | $4,581,050FOUTSCO PAVING COMPANY, LLC | +11.8% |
| Aug 5, 2026 | 0013-08-154 | HSIP Systemic Median BarrierWise · Fort Worth | 5 of 5 | $1,539,472 | $1,237,814GRATIOT CONSTRUCTION, LTD. | +24.4% |
| Jan 6, 2026 | 0062-04-052 | US 59 from SH 155 to Marion C/LCass · Atlanta | 1 of 5 | $7,736,641 | $7,736,641 | Won |
| Jan 6, 2026 | 0014-16-288 | IH 35W: Luella to AltamesaTarrant · Fort Worth | 8 of 9 | $5,712,079 | $3,872,524O. TREVINO CONSTRUCTION, LLC | +47.5% |
| Dec 3, 2025 | 0905-12-046 | FY 26 CRCP on IH 27 Hale CoHale · Lubbock | 3 of 3 | $2,689,358 | $2,229,251WINDING ROAD CONSTRUCTION, … | +20.6% |
| Dec 2, 2025 | 6489-09-001 | FULL DEPTH CONCRETE REPAIR KAUFMAN FY'26Kaufman · Dallas | 8 of 8 | $2,446,985 | $1,708,740ROY JORGENSEN ASSOCIATES, I… | +43.2% |
| Nov 5, 2025 | 0495-01-082 | SS 557 from US 80 to IH 20Kaufman · Dallas | 6 of 8 | $10,062,413 | $8,281,477O. TREVINO CONSTRUCTION, LLC | +21.5% |
| Oct 9, 2025 | 0047-14-093 | US 75 Grayson Co Line to Valley Creek TrCollin · Dallas | 2 of 6 | $2,748,675 | $2,620,351ROY JORGENSEN ASSOCIATES, I… | +4.9% |
| Oct 8, 2025 | 6486-40-001 | BPM - US175 @ Prairie Creek 03 1025Dallas · Dallas | 12 of 15 | $1,827,814 | $994,560JACKSON EXCAVATION, LLC | +83.8% |
| Sep 5, 2025 | 0909-00-105 | RES | Pot Hole Repair along IH35McLennan · Waco | 2 of 9 | $2,839,861 | $2,806,854O. TREVINO CONSTRUCTION, LLC | +1.2% |
| Sep 4, 2025 | 0461-06-028 | SH 214-NBI051850046106005-ParmerParmer · Lubbock | 4 of 10 | $4,696,702 | $4,197,908PATHFIELD INVESTMENTS LLC | +11.9% |
| Aug 8, 2025 | 0380-01-094 | US0062-2-1/2Lubbock · Lubbock | 6 of 7 | $3,547,892 | $2,699,559MASSANA CONSTRUCTION INC. | +31.4% |
| Aug 8, 2025 | 0091-04-067 | SH 289 from East Broadway St to FM 455Collin · Dallas | 5 of 7 | $2,832,176 | $2,298,355O. TREVINO CONSTRUCTION, LLC | +23.2% |
| Jul 2, 2025 | 0619-03-067 | FM 544 at Heritage Pkwy to SH 78Collin · Dallas | 5 of 6 | $1,099,703 | $848,975GARRET SHIELDS INFRASTRUCTU… | +29.5% |
| Jul 1, 2025 | 0261-02-083 | US 67 From US 67 SB at Wheatland RoadDallas · Dallas | 4 of 6 | $6,511,605 | $4,922,876RAGLE CONSTRUCTION, INC. | +32.3% |
| Jul 1, 2025 | 6484-32-001 | ON-CALL CONCRETE REPAIR FY 2026Wichita · Wichita Falls | 3 of 3 | $2,416,200 | $2,136,200GHB EQUIPMENT COMPANY, L.L.… | +13.1% |
| May 2, 2025 | 0836-02-079 | HSIP | SH 195 | .7S FM2670 -WilliamsonBell · Waco | 7 of 7 | $6,308,234 | $4,930,555BIG CREEK CONSTRUCTION, LTD. | +27.9% |
| Mar 5, 2025 | 0905-06-128 | FY 25 CRCP on IH 27Lubbock · Lubbock | 2 of 5 | $2,590,965 | $2,186,699O. TREVINO CONSTRUCTION, LLC | +18.5% |
| Feb 6, 2025 | 2681-01-029 | FM 2499 FM 1171 to Tarrant CLDenton · Dallas | 3 of 6 | $2,366,239 | $1,920,305ROY JORGENSEN ASSOCIATES, I… | +23.2% |
| Jun 5, 2024 | 0013-07-086 | HIGHWAY IMPROVEMENTWise · Fort Worth | 5 of 5 | $7,622,449 | $5,886,834GRATIOT CONSTRUCTION, LTD. | +29.5% |
| May 3, 2024 | 6466-43-001 | REPAIR/REPLACE CONCRETE BARRIERWilbarger · Wichita Falls | 2 of 3 | $1,428,520 | $1,281,472MB WESTERN INDUSTRIAL CONTR… | +11.5% |
| Jan 4, 2024 | 6457-03-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 1 of 7 | $1,030,771 | $1,030,771 | Won |
| Oct 10, 2023 | 6405-14-001 | BRIDGE JOINT CLEANING AND SEALINGDenton · Dallas | 7 of 7 | $816,385 | $226,358GARRET SHIELDS INFRASTRUCTU… | +260.7% |
| Aug 3, 2023 | 0013-05-065 | HAZARD ELIMINATION & SAFETYMontague · Wichita Falls | 4 of 4 | $2,737,073 | $2,243,729HJC FARMS, INC. | +22.0% |
| Aug 2, 2023 | 0134-07-075 | HAZARD ELIMINATION & SAFETYWise · Fort Worth | 1 of 5 | $5,064,956 | $5,064,956 | Won |
| Aug 2, 2023 | 0013-07-087 | CONSTRUCT REST AREAWise · Fort Worth | 4 of 6 | $2,720,539 | $2,289,336ED BELL CONSTRUCTION COMPANY | +18.8% |
| Jun 27, 2023 | 0249-07-079 | HAZARD ELIMINATION & SAFETYJack · Fort Worth | 3 of 5 | $1,580,992 | $1,303,125ROADWAY SPECIALTIES, INC. | +21.3% |
| Apr 5, 2023 | 2250-02-020 | REHABILITATE EXISTING ROADWAYDenton · Dallas | 1 of 3 | $1,362,511 | $1,362,511 | Won |
| Jan 5, 2023 | 0067-05-053 | REHABILITATE EXISTING ROADWAYHale · Lubbock | 1 of 3 | $2,049,919 | $2,049,919 | Won |
| Nov 2, 2022 | 0045-18-046 | HAZARD ELIMINATION & SAFETYGrayson · Paris | 3 of 7 | $6,374,309 | $5,981,039STATELINE CONSTRUCTION, LLC | +6.6% |
| Oct 7, 2022 | 0173-04-057 | RECONSTRUCTION OF EXISTING ROADWAYKaufman · Dallas | 2 of 5 | $5,979,864 | $5,861,109TEXAS MATERIALS GROUP, INC. | +2.0% |
| Oct 7, 2022 | 0134-07-069 | REHABILITATE EXISTING ROADWAYWise · Fort Worth | 1 of 4 | $3,489,536 | $3,489,536 | Won |
| Sep 8, 2022 | 0096-07-052 | INSTALLING MEDIAN BARRIERHarrison · Atlanta | 4 of 5 | $2,249,847 | $1,862,982MASSANA CONSTRUCTION INC. | +20.8% |
| Sep 7, 2022 | 6408-61-001 | BRIDGE REPAIRDallas · Dallas | 5 of 5 | $1,620,534 | $1,038,346GIBSON & ASSOCIATES, INC. | +56.1% |
| Feb 4, 2022 | 2374-03-096 | BRIDGE MAINTENANCEDallas · Dallas | 2 of 5 | $9,753,324 | $7,163,237GIBSON & ASSOCIATES, INC. | +36.2% |
| Sep 1, 2021 | 0009-02-065 | MILL, FULL DEPTH REPAIR, OV & PAVEMENT MARKINGSDallas · Dallas | 1 of 9 | $2,049,364 | $2,049,364 | Won |
| Aug 5, 2021 | 6378-75-001 | FULL DEPTH CONCRETE REPAIRWichita · Wichita Falls | 3 of 4 | $924,250 | $857,850O. TREVINO CONSTRUCTION, LLC | +7.7% |
| Aug 4, 2021 | 0043-09-144 | BRIDGE MAINTENANCEWichita · Wichita Falls | 4 of 4 | $4,598,422 | $3,356,261GIBSON & ASSOCIATES, INC. | +37.0% |
| Jun 3, 2021 | 0031-05-045 | BRIDGE MAINTENANCEChildress · Childress | 3 of 10 | $4,393,316 | $4,197,228BUILT RIGHT CONSTRUCTION OF… | +4.7% |
| May 6, 2021 | 6379-77-001 | FULL DEPTH CONCRETE REPAIRPotter · Amarillo | 3 of 3 | $1,297,150 | $1,074,720WINDING ROAD CONSTRUCTION, … | +20.7% |
| Apr 7, 2021 | 0459-01-080 | BRIDGE MAINTENANCEFreestone · Bryan | 6 of 11 | $1,252,491 | $926,052GIBSON & ASSOCIATES, INC. | +35.3% |
| Apr 7, 2021 | 0033-05-095 | CONCRETE PAVEMENTJones · Abilene | 3 of 6 | $345,990 | $251,560O. TREVINO CONSTRUCTION, LLC | +37.5% |
| Feb 4, 2021 | 0134-09-067 | CABLE BARRIER INSTALLATIONDenton · Dallas | 1 of 10 | $1,626,067 | $1,626,067 | Won |
| Feb 4, 2021 | 0081-01-049 | RESURFACE ROADWAYTarrant · Fort Worth | 6 of 8 | $1,516,389 | $1,193,707AUSTIN BRIDGE & ROAD SERVIC… | +27.0% |
| Feb 4, 2021 | 6374-14-001 | FULL DEPTH CONCRETE REPAIRRockwall · Dallas | 3 of 8 | $812,460 | $737,950O. TREVINO CONSTRUCTION, LLC | +10.1% |
| Jan 7, 2021 | 0062-05-062 | RESURFACE EXISTING 4 LANE DIVIDED HIGHWAYMarion · Atlanta | 2 of 3 | $3,085,849 | $2,827,414MADDEN CONTRACTING COMPANY,… | +9.1% |
| Jan 7, 2021 | 0906-00-203 | BRIDGE JOINT REPAIR PROGRAM (2021)Ector · Odessa | 4 of 12 | $1,379,039 | $1,267,114SCR CIVIL CONSTRUCTION, LLC | +8.8% |
| Dec 3, 2020 | 6370-37-001 | 2021 BRIDGE PREVENTATIVE MAINTENANCECottle · Childress | 2 of 15 | $398,937 | $359,682ROAD DOCTORS LLC | +10.9% |
| Dec 2, 2020 | 0901-19-196 | PREVENTIVE MAINTENANCEGrayson · Paris | 2 of 8 | $1,299,175 | $1,248,625O. TREVINO CONSTRUCTION, LLC | +4.0% |
| Nov 5, 2020 | 6365-28-001 | FY 2021 BPM PROJECTMoore · Amarillo | 4 of 6 | $724,071 | $666,090PBX BRIDGE COMPANY | +8.7% |
| Nov 5, 2020 | 6370-22-001 | BRIDGE JOINT REPAIREctor · Odessa | 8 of 14 | $271,568 | $173,811SCOTT TUCKER CONSTRUCTION C… | +56.2% |
| Oct 2, 2020 | 0047-01-063 | REMOVE/REPLACE BRIDGE RAILGrayson · Paris | 2 of 10 | $1,416,257 | $1,354,337J.D. ABRAMS, L.P. | +4.6% |
| Oct 1, 2020 | 0275-11-085 | SURFACING/ROADWAY RESTORATIONGray · Amarillo | 4 of 5 | $3,050,726 | $2,747,711WINDING ROAD CONSTRUCTION, … | +11.0% |
| Oct 1, 2020 | 0195-03-095 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGSDenton · Dallas | 2 of 7 | $1,193,946 | $1,113,468O. TREVINO CONSTRUCTION, LLC | +7.2% |
| Apr 9, 2020 | 2374-03-094 | FOR THE CONSTRUCTION OF BRIDGE DECK REPAIRDallas · Dallas | 1 of 6 | $4,328,706 | $4,328,706 | Won |
| Mar 4, 2020 | 2681-01-025 | FULL DEPTH CONCRETE REPAIRS AND PAVEMENT MARKINGSDenton · Dallas | 1 of 9 | $997,921 | $997,921 | Won |
| Jan 10, 2020 | 6343-42-001 | FY 2020 BPM PROJECTPotter · Amarillo | 4 of 8 | $820,236 | $660,194PBX BRIDGE COMPANY | +24.2% |
| Dec 3, 2019 | 6343-71-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 2 of 4 | $742,039 | $695,630ROY JORGENSEN ASSOCIATES, I… | +6.7% |
| Nov 6, 2019 | 0081-13-064 | UPGRADE BRIDGE RAILING AND APPROACH RAILINGDenton · Dallas | 2 of 5 | $1,489,080 | $1,398,590ED BELL CONSTRUCTION COMPANY | +6.5% |
| Oct 2, 2019 | 0196-01-110 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 1 of 6 | $1,486,329 | $1,486,329 | Won |
| Jul 10, 2019 | 6337-07-001 | BPM - BRIDGE JOINT REPAIRDenton · Dallas | 5 of 7 | $853,500 | $555,904SELECT STRIPING LLC | +53.5% |
| Jun 5, 2019 | 6343-40-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 1 of 4 | $626,903 | $626,903 | Won |
| Apr 3, 2019 | 2250-02-017 | INSTALL MEDIAN CONCRETE BARRIERSDenton · Dallas | 4 of 10 | $3,354,587 | $3,179,441ED BELL CONSTRUCTION COMPANY | +5.5% |
| Feb 6, 2019 | 0195-02-077 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 1 of 5 | $1,062,400 | $1,062,400 | Won |
| Jan 9, 2019 | 2208-02-022 | FULL DEPTH REPAIR CP, OVERLAY & PAVEMENT MARKINGSDallas · Dallas | 4 of 4 | $3,616,466 | $2,756,289O. TREVINO CONSTRUCTION, LLC | +31.2% |
| Dec 5, 2018 | 6336-59-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 2 of 4 | $460,963 | $410,919ROY JORGENSEN ASSOCIATES, I… | +12.2% |
| Oct 3, 2018 | 6323-04-001 | CALL OUT CONCRETE PAV REPAIRWheeler · Childress | 1 of 4 | $975,435 | $975,435 | Won |
| May 1, 2018 | 0043-06-088 | MILL HOT MIX ON BRIDGE AND APPROACHESWilbarger · Wichita Falls | 1 of 5 | $1,693,705 | $1,693,705 | Won |
| Apr 3, 2018 | 2980-01-013 | CONCRETE FULL DEPTH REPAIRDenton · Dallas | 2 of 9 | $2,330,109 | $2,203,011O. TREVINO CONSTRUCTION, LLC | +5.8% |
| Apr 3, 2018 | 6318-53-001 | BRIDGE REPAIRDallas · Dallas | 6 of 8 | $522,763 | $249,653ED BELL CONSTRUCTION COMPANY | +109.4% |
| Mar 7, 2018 | 6325-49-001 | FULL DEPTH CONCRETE REPAIRDenton · Dallas | 2 of 7 | $935,731 | $857,457ROY JORGENSEN ASSOCIATES, I… | +9.1% |
| Feb 2, 2018 | 6324-98-001 | 2018 BPM PROJECTChildress · Childress | 2 of 10 | $603,934 | $553,766CDM HOLDINGS, LLC | +9.1% |
| Jan 4, 2018 | 6316-00-001 | CALLOUT CONCRETE PAVEMENT REPAIRHarrison · Atlanta | 1 of 6 | $4,189,000 | $4,189,000 | Won |
| Dec 5, 2017 | 0043-05-107 | DECK AND CONCRETE STRUCTURE REPAIRWilbarger · Wichita Falls | 3 of 8 | $2,167,018 | $1,842,668GIBSON & ASSOCIATES, INC. | +17.6% |
| Aug 9, 2017 | 0114-07-082 | INSTALL MEDIAN BARRIERLee · Austin | 5 of 6 | $1,742,837 | $1,336,983DAN WILLIAMS COMPANY | +30.4% |
| Aug 8, 2017 | 0005-06-119 | INSTALL MEDIAN BARRIERHoward · Abilene | 2 of 8 | $1,681,044 | $1,664,669MASSANA CONSTRUCTION INC. | +1.0% |
| Jun 7, 2017 | 0095-14-028 | PVT REPAIR, SLOT STITCHKaufman · Dallas | 2 of 7 | $1,277,398 | $1,088,533IIPL USA LLC | +17.4% |
| May 2, 2017 | 0009-12-212 | PAVEMENT REPAIR & PAVEMENT MARKINGSRockwall · Dallas | 3 of 7 | $2,685,390 | $2,315,894O. TREVINO CONSTRUCTION, LLC | +16.0% |
| Feb 3, 2017 | 6313-52-001 | FULL DEPTH CONCRETE REPAIRPotter · Amarillo | 2 of 5 | $960,300 | $950,535O. TREVINO CONSTRUCTION, LLC | +1.0% |
| Feb 2, 2017 | 0197-02-118 | MILL,CONC,REPAIR,OVERLAYDallas · Dallas | 6 of 9 | $1,852,988 | $1,511,373AUSTIN BRIDGE & ROAD SERVIC… | +22.6% |
| Jan 5, 2017 | 6304-49-001 | BRIDGE MAINTENANCEHall · Childress | 1 of 10 | $469,370 | $469,370 | Won |
| Jan 4, 2017 | 6309-75-001 | BRIDGE REPAIRDallas · Dallas | 1 of 5 | $259,824 | $259,824 | Won |
| Nov 5, 2013 | 6260-70-001 | BPM (BRIDGE APPROACH & PARTIAL DEPTH REPAIR)Dallas · Dallas | 2 of 5 | $363,889 | $346,416GIBSON & ASSOCIATES, INC. | +5.0% |
| Oct 8, 2013 | 6261-63-001 | CALLOUT CONCRETE PAVEMENT REPAIRPanola · Atlanta | 1 of 4 | $1,645,917 | $1,645,917 | Won |
Active prime contracts 1
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0062-04-052Let Jan 6, 2026 | CassAtlanta · US 59 | RESTORATION | $7,800,634 | 52% |
Subcontracts on active jobs 3
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 2352-02-026Let Nov 5, 2025 | EUROVIA ATLANTIC COAST LLC | DentonDallas | REHABILITATION OF EXISTING ROAD | 2.41% | $127,927 |
| 0092-02-144Let Sep 5, 2025 | TEXAS MATERIALS GROUP, INC. | DallasDallas | REHABILITATION OF EXISTING ROAD | 7.89% | $1,512,942 |
| 0579-02-014Let Aug 2, 2023 | D. L. LENNON INCORPORATED - CONTRACTOR | HuntParis | REHABILITATION OF EXISTING ROAD | 0% | $0 |