| 1 | 104-6009 |
REMOVING CONC (RIPRAP) | 20 | SY |
$15.00 |
$19.00 |
$20.00 |
$40.00 |
$18.00 |
$36.00 |
| 2 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 2,237 | SY |
$15.00 |
$19.00 |
$30.00 |
$40.00 |
$18.00 |
$37.00 |
| 3 | 104-6021 |
REMOVING CONC (CURB) | 14,599 | LF |
$6.00 |
$5.40 |
$12.00 |
$16.60 |
$5.00 |
$12.00 |
| 4 | 105-6011 |
REMOVING STAB BASE AND ASPH PAV (2"-6") | 1,111 | SY |
$10.00 |
$10.25 |
$20.00 |
$12.00 |
$21.30 |
$15.00 |
| 5 | 134-6004 |
BACKFILL (TY A OR B) | 82.18 | STA |
$180.00 |
$188.00 |
$200.00 |
$175.00 |
$164.07 |
$430.00 |
| 6 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 7,301 | SY |
$1.50 |
$1.35 |
$3.00 |
$7.40 |
$0.5000 |
$2.00 |
| 7 | 162-6002 |
BLOCK SODDING | 7,301 | SY |
$4.10 |
$6.50 |
$6.00 |
$5.25 |
$7.08 |
$7.00 |
| 8 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 7,301 | SY |
$0.7500 |
$0.4200 |
$0.4000 |
$0.6000 |
$1.48 |
$0.4100 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 2,180 | MG |
$5.00 |
$0.0100 |
$20.00 |
$42.00 |
$0.1000 |
$21.00 |
| 10 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 858 | SY |
$50.00 |
$65.00 |
$65.00 |
$81.00 |
$90.00 |
$81.00 |
| 11 | 354-6022 |
PLANE ASPH CONC PAV(0" TO 3") | 11,990 | SY |
$3.00 |
$2.20 |
$5.00 |
$2.50 |
$3.50 |
$5.00 |
| 12 | 361-6065 |
FULL-DEPTH REPAIR CRCP (8"-10") | 7,036 | SY |
$215.00 |
$213.00 |
$200.00 |
$191.50 |
$205.00 |
$225.00 |
| 13 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 32 | LF |
$10.00 |
$10.25 |
$40.00 |
$30.00 |
$10.00 |
$68.00 |
| 14 | 432-6001 |
RIPRAP (CONC)(4 IN) | 3 | CY |
$500.00 |
$820.00 |
$1,000.00 |
$835.00 |
$700.00 |
$1,000.00 |
| 15 | 464-6003 |
RC PIPE (CL III)(18 IN) | 4 | LF |
$100.00 |
$450.00 |
$200.00 |
$650.00 |
$400.00 |
$200.00 |
| 16 | 464-6004 |
RC PIPE (CL III)(21 IN) | 6 | LF |
$130.00 |
$477.00 |
$200.00 |
$444.00 |
$425.00 |
$405.00 |
| 17 | 465-6126 |
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT) | 1 | EA |
$5,250.00 |
$6,800.00 |
$6,000.00 |
$6,000.00 |
$6,100.00 |
$8,000.00 |
| 18 | 465-6176 |
INLET (COMPL)(CURB)(TY C1) | 1 | EA |
$8,500.00 |
$8,100.00 |
$6,000.00 |
$9,650.00 |
$7,300.00 |
$9,500.00 |
| 19 | 479-6002 |
ADJUSTING INLETS | 28 | EA |
$3,000.00 |
$3,350.00 |
$4,000.00 |
$6,550.00 |
$3,100.00 |
$3,300.00 |
| 20 | 479-6006 |
ADJUSTING INLET (CAP) | 2 | EA |
$1,500.00 |
$2,650.00 |
$4,000.00 |
$4,500.00 |
$2,500.00 |
$3,400.00 |
| 21 | 500-6001 |
MOBILIZATION | 1 | LS |
$430,850.77 |
$554,116.00 |
$580,000.00 |
$600,000.00 |
$600,000.00 |
$391,218.35 |
| 22 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 8 | MO |
$15,000.00 |
$23,000.00 |
$10,000.00 |
$5,000.00 |
$32,000.00 |
$12,500.00 |
| 23 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 63 | SY |
$40.00 |
$41.00 |
$40.00 |
$65.00 |
$40.00 |
$41.00 |
| 24 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 63 | SY |
$15.00 |
$12.30 |
$10.00 |
$25.00 |
$12.00 |
$13.00 |
| 25 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 877 | LF |
$4.00 |
$4.11 |
$4.00 |
$4.40 |
$4.00 |
$4.10 |
| 26 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 877 | LF |
$1.00 |
$0.2600 |
$0.2500 |
$1.25 |
$0.2500 |
$0.3000 |
| 27 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 2,741 | LF |
$4.80 |
$6.20 |
$3.00 |
$5.00 |
$6.00 |
$7.00 |
| 28 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 2,741 | LF |
$1.20 |
$1.04 |
$0.5000 |
$1.20 |
$1.00 |
$1.15 |
| 29 | 529-6008 |
CONC CURB & GUTTER (TY II) | 14,599 | LF |
$28.00 |
$45.00 |
$37.00 |
$37.50 |
$41.00 |
$24.00 |
| 30 | 530-6001 |
INTERSECTIONS (CONC) | 622 | SY |
$220.00 |
$104.00 |
$175.00 |
$99.00 |
$93.00 |
$140.00 |
| 31 | 530-6002 |
INTERSECTIONS (ACP) | 676 | SY |
$80.00 |
$47.00 |
$75.00 |
$52.50 |
$61.00 |
$185.00 |
| 32 | 530-6005 |
DRIVEWAYS (ACP) | 435 | SY |
$80.00 |
$64.00 |
$78.00 |
$70.00 |
$110.00 |
$263.00 |
| 33 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 1,615 | SY |
$100.00 |
$100.00 |
$140.00 |
$98.00 |
$90.00 |
$160.00 |
| 34 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 10 | EA |
$300.00 |
$268.00 |
$275.00 |
$375.00 |
$350.00 |
$350.00 |
| 35 | 560-6012 |
MAILBOX INSTALL-D (TWW-POST) TY 4 | 2 | EA |
$330.00 |
$322.00 |
$285.50 |
$428.00 |
$400.00 |
$400.00 |
| 36 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 2 | EA |
$700.00 |
$780.00 |
$760.00 |
$860.00 |
$800.00 |
$800.00 |
| 37 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 54 | EA |
$750.00 |
$673.00 |
$815.25 |
$700.00 |
$650.00 |
$650.00 |
| 38 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 30 | EA |
$800.00 |
$845.00 |
$905.75 |
$910.00 |
$850.00 |
$850.00 |
| 39 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 1 | EA |
$1,500.00 |
$1,015.00 |
$1,105.00 |
$1,040.00 |
$970.00 |
$970.00 |
| 40 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 5 | EA |
$1,100.00 |
$1,175.00 |
$1,190.00 |
$1,230.00 |
$1,150.00 |
$1,150.00 |
| 41 | 644-6033 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 3 | EA |
$1,150.00 |
$1,185.00 |
$1,290.00 |
$1,180.00 |
$1,100.00 |
$1,100.00 |
| 42 | 644-6036 |
IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | 1 | EA |
$1,400.00 |
$1,485.00 |
$1,410.00 |
$1,480.00 |
$1,385.00 |
$1,385.00 |
| 43 | 644-6070 |
RELOCATE SM RD SN SUP&AM TY S80 | 1 | EA |
$750.00 |
$755.00 |
$695.00 |
$675.00 |
$630.00 |
$650.00 |
| 44 | 644-6076 |
REMOVE SM RD SN SUP&AM | 90 | EA |
$150.00 |
$85.00 |
$75.00 |
$21.00 |
$20.00 |
$22.00 |
| 45 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 2,851 | EA |
$2.00 |
$1.10 |
$4.00 |
$1.70 |
$0.5500 |
$1.30 |
| 46 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 554 | EA |
$1.50 |
$1.10 |
$4.00 |
$1.70 |
$0.5700 |
$1.30 |
| 47 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 2,216 | LF |
$1.50 |
$1.00 |
$0.9100 |
$1.05 |
$1.10 |
$1.00 |
| 48 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 768 | LF |
$9.50 |
$6.40 |
$6.10 |
$7.00 |
$10.00 |
$7.00 |
| 49 | 666-6054 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 26 | EA |
$150.00 |
$123.00 |
$120.00 |
$150.00 |
$125.00 |
$132.00 |
| 50 | 666-6078 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 18 | EA |
$185.00 |
$128.00 |
$124.00 |
$185.00 |
$200.00 |
$135.00 |
| 51 | 666-6102 |
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) | 192 | EA |
$45.00 |
$36.00 |
$35.00 |
$32.00 |
$20.00 |
$38.00 |
| 52 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 4,128 | LF |
$0.7000 |
$0.6200 |
$0.6000 |
$1.05 |
$0.8000 |
$0.7000 |
| 53 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 15,189 | LF |
$0.6000 |
$0.5600 |
$0.5400 |
$0.5500 |
$0.5200 |
$0.6000 |
| 54 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 420 | LF |
$0.6500 |
$1.05 |
$1.00 |
$1.05 |
$1.00 |
$1.10 |
| 55 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 15,657 | LF |
$0.6500 |
$0.5700 |
$0.5400 |
$0.5500 |
$0.5500 |
$0.6000 |
| 56 | 672-6007 |
REFL PAV MRKR TY I-C | 321 | EA |
$6.00 |
$4.12 |
$4.00 |
$4.25 |
$4.00 |
$4.50 |
| 57 | 672-6009 |
REFL PAV MRKR TY II-A-A | 140 | EA |
$6.50 |
$4.12 |
$4.00 |
$4.25 |
$6.00 |
$4.50 |
| 58 | 730-6107 |
FULL - WIDTH MOWING | 3 | CYC |
$5,000.00 |
$2,035.00 |
$2,500.00 |
$700.00 |
$3,000.00 |
$4,500.00 |
| 59 | 764-6001 |
DRAIN INLET CLEANING | 49 | EA |
$500.00 |
$615.00 |
$350.00 |
$580.00 |
$200.00 |
$300.00 |
| 60 | 3000-6003 |
CAM (ASPHALT) PG(76-22) | 333.4 | TON |
$155.00 |
$200.00 |
$208.00 |
$208.00 |
$210.00 |
$225.00 |
| 61 | 3000-6004 |
CAM (AGGREGATE) | 4,162.82 | TON |
$140.00 |
$200.00 |
$208.00 |
$208.00 |
$210.00 |
$225.00 |
| 62 | 3002-6001 |
MEMBRANE UNDERSEAL | 14,044 | GAL |
$5.50 |
$3.90 |
$4.00 |
$4.00 |
$4.50 |
$4.50 |
| 63 | 3077-6023 |
SP MIXES SP-C SAC-B PG70-22 | 8,058.01 | TON |
$110.00 |
$130.00 |
$130.00 |
$130.00 |
$151.00 |
$150.00 |
| 64 | 3077-6075 |
TACK COAT | 7,745 | GAL |
$4.00 |
$0.0100 |
$0.0100 |
$0.0100 |
$1.00 |
$1.00 |
| 65 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 5 | EA |
$12,000.00 |
$7,400.00 |
$7,500.00 |
$10,000.00 |
$200.00 |
$10,000.00 |
| 66 | 6185-6002 |
TMA (STATIONARY) | 134 | DAY |
$250.00 |
$258.00 |
$150.00 |
$120.00 |
$305.00 |
$300.00 |
| 67 | 6185-6003 |
TMA (MOBILE OPERATION) | 240 | HR |
$100.00 |
$0.0100 |
$75.00 |
$60.00 |
$10.00 |
$150.00 |