Contact information
- jason.exum@quikrete.com
- Phone
- (903) 784-7280
- Address
- 5020 SE LOOP 286, PARIS, TX 75460
- TxDOT prequalification
- Construction qualified
562BidsSep 10, 2013 to Nov 4, 2026
232Wins (low bidder)
41.3%Win rate
$961,007,426Total won
Competitor scorecard
Last 5 years in Texas46.7%Win rate142 of 304 bids
+7.7%Average bid vs estimate
+0.8%Winning bids vs estimate
+15.0%Over the low bid when they loseAverage field: 3.3 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| J. LEE MILLIGAN, INC. | 49 | 26 | 23 | 53% |
| DUININCK, INC. | 49 | 22 | 27 | 45% |
| GILVIN-TERRILL, LTD. | 43 | 31 | 12 | 72% |
| A. L. HELMCAMP, INC. | 38 | 20 | 18 | 53% |
| REECE ALBERT, INC. | 35 | 20 | 15 | 57% |
| KIEWIT INFRASTRUCTURE SOUTH CO. | 29 | 20 | 9 | 69% |
| CK NEWBERRY, LLC | 27 | 16 | 11 | 59% |
| RICHARD DRAKE CONSTRUCTION COMPANY, L.P. | 24 | 12 | 12 | 50% |
| JONES BROS. DIRT & PAVING CONTRACTORS, INC. | 24 | 7 | 17 | 29% |
| EAST TEXAS BRIDGE, INC. | 22 | 11 | 11 | 50% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 4, 2026 | 1017-03-040 | FM 35 Repair and WidenHunt · Paris | 5 of 9 | $7,514,717 | $6,803,596HIGHWAY 19 CONSTRUCTION LLC | +10.5% |
| Nov 4, 2026 | 0157-04-058 | SB US 277 S Y IN HASKELL TO JONES COUNTYHaskell · Abilene | 2 of 9 | $7,796,183 | $6,732,215LONE STAR PAVING COMPANY | +15.8% |
| Nov 4, 2026 | 6504-98-001 | Misc Pavement Repair North FY 27Tom Green · San Angelo | 3 of 4 | $5,112,262 | $3,124,443REECE ALBERT, INC. | +63.6% |
| Nov 3, 2026 | 0045-09-113 | BU 82 H Overlay/ONYXLamar · Paris | 4 of 5 | $3,855,508 | $3,510,998DRAKE COMPANIES LLC | +9.8% |
| Nov 3, 2026 | 6508-84-001 | 6508-84-001 Mill & InlayMidland · Odessa | 2 of 4 | $1,440,884 | $1,285,507RAGLE CONSTRUCTION, INC. | +12.1% |
| Oct 22, 2026 | 6509-82-001 | Hot Mix Daingerfield FY 27Morris · Atlanta | 2 of 2 | $321,000 | $311,000C-RAE MATERIALS LLC | +3.2% |
| Oct 22, 2026 | 6509-85-001 | Linden Hot Mix FY 27Cass · Atlanta | 2 of 2 | $325,600 | $311,000C-RAE MATERIALS LLC | +4.7% |
| Oct 22, 2026 | 6509-87-001 | Mt. Pleasant Hot Mix FY 27Titus · Atlanta | 2 of 2 | $321,000 | $310,000C-RAE MATERIALS LLC | +3.5% |
| Oct 22, 2026 | 6509-88-001 | New Boston Hot Mix FY 27Bowie · Atlanta | 2 of 2 | $323,100 | $306,000C-RAE MATERIALS LLC | +5.6% |
| Oct 22, 2026 | 6509-89-001 | Texarkana Hot Mix FY 27Bowie · Atlanta | 2 of 2 | $313,100 | $306,000C-RAE MATERIALS LLC | +2.3% |
| Oct 15, 2026 | 6510-64-001 | Rock-Rip Rap - Paris District 27Hunt · Paris | 1 of 3 | $402,428 | $402,428 | Won |
| Oct 15, 2026 | 6510-65-001 | Asphalt Concrete Patch - Hunt/ DW FY27Hunt · Paris | 2 of 2 | $301,650 | $293,106HALL BROTHERS, INC. | +2.9% |
| Oct 6, 2026 | 0410-02-047 | US 69 3R RehabGrayson · Paris | 6 of 7 | $11,482,170 | $9,878,022HIGHWAY 19 CONSTRUCTION LLC | +16.2% |
| Oct 6, 2026 | 6501-57-001 | Mill and Inlay (N) FY2027Bowie · Atlanta | 2 of 5 | $6,252,745 | $5,500,500EAST TEXAS BRIDGE, INC. | +13.7% |
| Sep 9, 2026 | 6504-32-001 | RipRap 07 09.26Collin · Dallas | 5 of 5 | $128,300 | $104,965DIGG COMMERCIAL, LLC | +22.2% |
| Sep 3, 2026 | 0221-09-039 | BU 271E from N of FM 2152 to N of US 67Titus · Atlanta | 4 of 4 | $1,331,248 | $1,095,183LONGVIEW BRIDGE AND ROAD, L… | +21.6% |
| Aug 20, 2026 | 6506-71-001 | Hot Mix - Grayson 27Grayson · Paris | 1 of 4 | $596,250 | $596,250 | Won |
| Aug 13, 2026 | 6506-64-001 | ABL - West HMAHoward · Abilene | 1 of 2 | $810,713 | $810,713 | Won |
| Aug 12, 2026 | 6503-48-001 | Aggregate FY 27 DWHarrison · Atlanta | 1 of 1 | $970,787 | $970,787 | Won |
| Aug 12, 2026 | 6501-48-001 | FLEXIBLE BASE COLLIN FY27Collin · Dallas | 1 of 4 | $42,400 | $42,400 | Won |
| Aug 6, 2026 | 6506-23-001 | Aggregate Grayson/DWGrayson · Paris | 1 of 1 | $1,934,598 | $1,934,598 | Won |
| Aug 6, 2026 | 0168-03-038 | US 60- In Friona 5th St. to WalnutParmer · Lubbock | 4 of 5 | $11,340,406 | $9,764,859A. L. HELMCAMP, INC. | +16.1% |
| Aug 6, 2026 | 0069-07-113 | 0069-07-113 US 87 Intersection ImproveTom Green · San Angelo | 2 of 2 | $2,999,977 | $2,825,728REECE ALBERT, INC. | +6.2% |
| Aug 6, 2026 | 0041-07-121 | US 87 HIR AMA CRK TO SL 335Potter · Amarillo | 2 of 3 | $30,964,796 | $30,085,056J. LEE MILLIGAN, INC. | +2.9% |
| Aug 5, 2026 | 6505-22-001 | OVERLAY EASTLAND COUNTYEastland · Brownwood | 4 of 9 | $3,141,304 | $2,982,235BLACKSMITH VENTURES LLC | +5.3% |
| Aug 5, 2026 | 0222-03-065 | SH 11 from US 259 to Cass C/LMorris · Atlanta | 5 of 7 | $12,349,864 | $10,759,105H. H. HOWARD & SONS, INC. | +14.8% |
| Aug 5, 2026 | 0441-09-054 | IH10_1.2MI_E_OF_FM3078_1.6MI_W_FM2903Reeves · Odessa | 2 of 5 | $17,725,675 | $14,980,840FNF CONSTRUCTION, INC. | +18.3% |
| Aug 5, 2026 | 0132-03-036 | US 82 0.422 Miles E Airport to US 83King · Childress | 4 of 5 | $30,406,275 | $28,760,605ZACK BURKETT CO. | +5.7% |
| Jul 29, 2026 | 6505-04-001 | FY 27 Amarillo Area HMACRandall · Amarillo | 1 of 2 | $625,000 | $625,000 | Won |
| Jul 2, 2026 | 0005-04-084 | IH20_RampReversal_SH137_BI20-F EASTMartin · Odessa | 3 of 4 | $10,399,950 | $8,792,883GILVIN-TERRILL, LTD. | +18.3% |
| Jul 2, 2026 | 6502-48-001 | Site Specific Mill & Inlay FY27Lamar · Paris | 1 of 3 | $6,261,324 | $6,261,324 | Won |
| May 7, 2026 | 6500-99-001 | Flex Base & Asph Treatment - Paris DistLamar · Paris | 2 of 2 | $1,645,770 | $1,605,225C-RAE MATERIALS LLC | +2.5% |
| May 6, 2026 | 0572-01-076 | OVERLAY_SH302_SH158_SL338Ector · Odessa | 4 of 5 | $11,715,700 | $9,284,543JONES BROS. DIRT & PAVING C… | +26.2% |
| Apr 30, 2026 | 6500-86-001 | FY 26-27 Ty D hot mixChildress · Childress | 1 of 1 | $125,000 | $125,000 | Won |
| Apr 16, 2026 | 6499-97-001 | Hot Mix - Fannin COFannin · Paris | 1 of 5 | $697,240 | $697,240 | Won |
| Apr 16, 2026 | 6499-98-001 | Hot Mix - Rains CO FY26Rains · Paris | 1 of 4 | $609,315 | $609,315 | Won |
| Apr 16, 2026 | 6500-00-001 | Hot Mix - Franklin CO FY26Franklin · Paris | 1 of 3 | $689,440 | $689,440 | Won |
| Apr 16, 2026 | 6500-01-001 | Hot Mix - Red River CO FY26Red River · Paris | 1 of 2 | $550,240 | $550,240 | Won |
| Apr 16, 2026 | 6500-03-001 | Hot Mix - Lamar CO FY26Lamar · Paris | 1 of 2 | $603,160 | $603,160 | Won |
| Apr 16, 2026 | 6500-11-001 | Asphalt Oil & Emulsion - Delta 26Delta · Paris | 1 of 3 | $603,160 | $603,160 | Won |
| Apr 16, 2026 | 6500-12-001 | Hot Mix - Hopkins CO FY26Hopkins · Paris | 1 of 4 | $627,760 | $627,760 | Won |
| Apr 16, 2026 | 6500-13-001 | Hot Mix - Hunt 26Hunt · Paris | 1 of 6 | $617,190 | $617,190 | Won |
| Apr 8, 2026 | 1823-01-011 | FM1208_FM1212_MIDLAND_C/LMartin · Odessa | 2 of 5 | $10,238,364 | $9,373,792JONES BROS. DIRT & PAVING C… | +9.2% |
| Apr 8, 2026 | 1016-04-021 | FM 548 from SH 276 to SH 205Rockwall · Dallas | 5 of 7 | $3,773,606 | $3,381,745ICOS MANAGEMENT, LLC | +11.6% |
| Apr 8, 2026 | 0005-08-109 | IH 20 WESTBROOK TO COLORADO CITYMitchell · Abilene | 2 of 5 | $12,851,983 | $12,796,839CK NEWBERRY, LLC | +0.4% |
| Mar 5, 2026 | 0083-12-004 | SH 11 FDR w/OverlayHopkins · Paris | 1 of 4 | $1,638,858 | $1,638,858 | Won |
| Mar 4, 2026 | 0034-05-042 | 0034-05-042 US 67 Ballinger OverlayRunnels · San Angelo | 1 of 3 | $10,981,878 | $10,981,878 | Won |
| Feb 5, 2026 | 2398-01-064 | SL 322 OVERLAY IH 20 TO US 83Taylor · Abilene | 3 of 6 | $10,097,096 | $8,968,076J. H. STRAIN & SONS, INC. | +12.6% |
| Feb 5, 2026 | 0361-01-038 | US 380, US 183 to Young CLThrockmorton · Wichita Falls | 3 of 4 | $5,491,030 | $4,679,213ZACK BURKETT CO. | +17.3% |
| Feb 5, 2026 | 0098-03-037 | SH 6 US 70 TO Knox C/L OverlayFoard · Childress | 2 of 7 | $7,411,343 | $6,793,699ZACK BURKETT CO. | +9.1% |
| Feb 5, 2026 | 0140-03-052 | IH10_W_OF_WFM11_TO_FM2886Pecos · Odessa | 3 of 7 | $16,752,674 | $14,714,263FNF CONSTRUCTION, INC. | +13.9% |
| Jan 7, 2026 | 0711-02-045 | FM 104 WideningCottle · Childress | 2 of 8 | $6,587,854 | $6,279,570ZACK BURKETT CO. | +4.9% |
| Jan 6, 2026 | 0032-04-034 | Super 2 FM 1038, S to King C/LCottle · Childress | 3 of 9 | $50,198,785 | $46,493,743ZACK BURKETT CO. | +8.0% |
| Jan 6, 2026 | 0248-02-072 | US 271 from SL 179 to BU 271HCamp · Atlanta | 1 of 3 | $5,003,037 | $5,003,037 | Won |
| Dec 3, 2025 | 0005-10-028 | BI20G E OF FM 700 TO IH 20 MILL AND FILLHoward · Abilene | 1 of 2 | $1,010,383 | $1,010,383 | Won |
| Dec 3, 2025 | 0083-08-055 | SH 11 from S RR Crossing to US 271Camp · Atlanta | 2 of 2 | $955,569 | $932,074EAST TEXAS BRIDGE, INC. | +2.5% |
| Dec 3, 2025 | 6492-97-001 | HMCL - Paris DistrictLamar · Paris | 1 of 2 | $1,597,100 | $1,597,100 | Won |
| Dec 2, 2025 | 0041-02-020 | 2026 HSIP US 385 TURN LANES 1/3Hartley · Amarillo | 2 of 6 | $17,606,323 | $15,925,814J. LEE MILLIGAN, INC. | +10.6% |
| Dec 2, 2025 | 0046-05-048 | US 82 from SH 8 to FM 1398WBowie · Atlanta | 3 of 5 | $11,276,581 | $10,382,445TRUE ROADS CONSTRUCTION LLC | +8.6% |
| Dec 2, 2025 | 6493-01-001 | Aggregate FY 26 DWHarrison · Atlanta | 2 of 2 | $1,452,800 | $1,179,124GREEN DREAM INTERNATIONAL L… | +23.2% |
| Nov 6, 2025 | 6485-71-001 | 6485-71-001 Mill & InlayEctor · Odessa | 3 of 4 | $1,966,532 | $1,760,245RAGLE CONSTRUCTION, INC. | +11.7% |
| Nov 6, 2025 | 0042-12-096 | US 287 Hall C/L to 2102' W of FM 164Childress · Childress | 1 of 8 | $5,183,756 | $5,183,756 | Won |
| Nov 5, 2025 | 0069-01-062 | US 87 NBL RM 33 TO FM 461Howard · Abilene | 1 of 5 | $2,026,248 | $2,026,248 | Won |
| Oct 16, 2025 | 6491-60-001 | Rock-Rip Rap - Paris DistrictHunt · Paris | 3 of 3 | $479,056 | $455,500TOUCHSTONE RESOURCES, LLC | +5.2% |
| Oct 16, 2025 | 6491-75-001 | Asphalt Concrete Patch - Paris DistrictHunt · Paris | 1 of 1 | $311,460 | $311,460 | Won |
| Oct 15, 2025 | 6490-82-001 | Daingerfield Hot Mix FY 26Morris · Atlanta | 2 of 2 | $393,000 | $382,910DRAKE ASPHALT LLC | +2.6% |
| Oct 15, 2025 | 6490-83-001 | Gilmer Hot Mix FY 26Upshur · Atlanta | 2 of 2 | $403,000 | $396,480LONGVIEW ASPHALT, INC. | +1.6% |
| Oct 15, 2025 | 6490-85-001 | Linden Hot Mix FY 26Cass · Atlanta | 2 of 2 | $415,200 | $403,600DRAKE ASPHALT LLC | +2.9% |
| Oct 15, 2025 | 6490-87-001 | Mt. Pleasant Hot Mix FY 26Titus · Atlanta | 2 of 2 | $393,000 | $382,910DRAKE ASPHALT LLC | +2.6% |
| Oct 15, 2025 | 6490-88-001 | New Boston Hot Mix FY 26Bowie · Atlanta | 2 of 2 | $402,700 | $399,000DRAKE ASPHALT LLC | +0.9% |
| Oct 15, 2025 | 6490-89-001 | Texarkana Hot Mix FY 25Bowie · Atlanta | 2 of 2 | $412,700 | $399,000DRAKE ASPHALT LLC | +3.4% |
| Oct 9, 2025 | 0295-03-036 | US 180 SCURRY COUNTY 0295-03Borden · Abilene | 2 of 5 | $7,405,153 | $7,299,030CK NEWBERRY, LLC | +1.5% |
| Oct 9, 2025 | 0380-04-025 | SH 137-US 62 to Dawson CoLn SP2Terry · Lubbock | 4 of 5 | $23,512,697 | $22,303,962A. L. HELMCAMP, INC. | +5.4% |
| Oct 8, 2025 | 0222-04-072 | SH 49 from SH 155 to Marion C/LCass · Atlanta | 7 of 9 | $13,996,913 | $11,029,939L. S. EQUIPMENT CO., INC. | +26.9% |
| Oct 8, 2025 | 0317-02-017 | FM 57 OVERLAY US 180 TO JONES COUNTYFisher · Abilene | 4 of 7 | $3,167,782 | $2,898,665CK NEWBERRY, LLC | +9.3% |
| Oct 8, 2025 | 0076-07-037 | US67_EAST_OF_CR225_SH329Upton · Odessa | 3 of 5 | $33,155,588 | $25,682,913JONES BROS. DIRT & PAVING C… | +29.1% |
| Sep 5, 2025 | 0380-09-104 | OVERLAY_0380-09Midland · Odessa | 3 of 5 | $6,122,193 | $5,391,295JONES BROS. DIRT & PAVING C… | +13.6% |
| Sep 5, 2025 | 0355-05-046 | SH 207 OVHansford · Amarillo | 3 of 5 | $13,154,210 | $12,484,683DUININCK, INC. | +5.4% |
| Sep 5, 2025 | 0380-06-019 | SH 349 Overlay-FM 2052 to MartinDawson · Lubbock | 1 of 9 | $17,135,619 | $17,135,619 | Won |
| Sep 4, 2025 | 6487-53-001 | 6487-53-001 Mill and InlayMidland · Odessa | 1 of 4 | $1,532,796 | $1,532,796 | Won |
| Sep 4, 2025 | 0077-06-107 | 0077-06-107 US 67 ACP OverlayTom Green · San Angelo | 2 of 3 | $21,641,672 | $20,466,166REECE ALBERT, INC. | +5.7% |
| Aug 7, 2025 | 6487-80-001 | Aggregate Materials - Paris DistrictGrayson · Paris | 1 of 3 | $1,954,944 | $1,954,944 | Won |
| Jul 23, 2025 | 6486-01-001 | FY 26 Amarillo Area HMACRandall · Amarillo | 1 of 2 | $625,000 | $625,000 | Won |
| Jul 2, 2025 | 6482-87-001 | District Wide Aggregate FY 26Harrison · Atlanta | 2 of 2 | $1,452,800 | $1,203,506SKYLINE CONSTRUCTION PAVING… | +20.7% |
| Jul 2, 2025 | 6483-25-001 | Site Specific Mill & Inlay FY26Delta · Paris | 1 of 2 | $6,077,146 | $6,077,146 | Won |
| Jun 11, 2025 | 6483-69-001 | Rock/Riprap Materials 01 0625Navarro · Dallas | 5 of 5 | $200,360 | $83,000TOUCHSTONE RESOURCES, LLC | +141.4% |
| Jun 5, 2025 | 6482-60-001 | Aggregate (Seal Coat) - District WideSmith · Tyler | 1 of 3 | $1,960,848 | $1,960,848 | Won |
| Jun 5, 2025 | 0693-02-016 | SH 350 MITCHELL COUNTYMitchell · Abilene | 1 of 6 | $5,996,861 | $5,996,861 | Won |
| Jun 5, 2025 | 0005-04-083 | IH20_E_StantonInterchange_HowardCL_RehabMartin · Odessa | 2 of 5 | $12,371,216 | $11,318,569JONES BROS. DIRT & PAVING C… | +9.3% |
| Jun 4, 2025 | 0279-02-050 | SH 78 FDR W/OverlayFannin · Paris | 7 of 8 | $19,141,321 | $15,468,983D. L. LENNON INCORPORATED -… | +23.7% |
| May 2, 2025 | 6478-38-001 | Flex Base & Asph Trtmt - Paris DistrictLamar · Paris | 1 of 2 | $1,628,050 | $1,628,050 | Won |
| May 2, 2025 | 0173-07-062 | SH 34 - 1Hunt · Paris | 6 of 6 | $7,052,939 | $4,125,934BAKER & COMPANY CONSTRUCTIO… | +70.9% |
| May 1, 2025 | 0052-01-043 | OV-US 70 Farwell to Bailey CCSJParmer · Lubbock | 6 of 8 | $35,975,099 | $29,652,485A. L. HELMCAMP, INC. | +21.3% |
| Apr 23, 2025 | 6482-28-001 | FY 25-26 Dumas Area HMACHartley · Amarillo | 1 of 3 | $625,000 | $625,000 | Won |
| Apr 17, 2025 | 6482-93-001 | Hot Mix - Rains Co.Rains · Paris | 1 of 3 | $637,000 | $637,000 | Won |
| Apr 17, 2025 | 6482-94-001 | Hot Mix - Franklin Co.Franklin · Paris | 1 of 1 | $792,000 | $792,000 | Won |
| Apr 17, 2025 | 6483-09-001 | Hot Mix - Red River Co.Red River · Paris | 1 of 1 | $938,000 | $938,000 | Won |
| Apr 17, 2025 | 6483-11-001 | Hot Mix - Lamar Co.Lamar · Paris | 1 of 1 | $720,500 | $720,500 | Won |
| Apr 17, 2025 | 6483-12-001 | Hot Mix - Delta Co.Delta · Paris | 1 of 1 | $720,500 | $720,500 | Won |
| Apr 17, 2025 | 6483-18-001 | Hot Mix - Hopkins Co.Hopkins · Paris | 1 of 1 | $742,500 | $742,500 | Won |
| Apr 17, 2025 | 6483-19-001 | Hot Mix - Hunt Co.Hunt · Paris | 1 of 3 | $649,750 | $649,750 | Won |
| Apr 17, 2025 | 6478-48-001 | D-GR Hot Mix - Fannin Co.Fannin · Paris | 1 of 3 | $747,200 | $747,200 | Won |
| Apr 9, 2025 | 6481-30-001 | Flexible Base FY25/26Collin · Dallas | 3 of 4 | $250,000 | $230,000TOUCHSTONE RESOURCES, LLC | +8.7% |
| Apr 9, 2025 | 6481-32-001 | Grade 4 Rock FY25/26Collin · Dallas | 2 of 4 | $178,560 | $140,000TOUCHSTONE RESOURCES, LLC | +27.5% |
| Apr 4, 2025 | 0006-03-149 | MILL AND FILL IH 20 FRS WEST OF SH 70Nolan · Abilene | 2 of 5 | $699,319 | $664,504CK NEWBERRY, LLC | +5.2% |
| Apr 3, 2025 | 1873-02-027 | FM 1269 Rehab Scurry CoScurry · Abilene | 3 of 4 | $6,274,117 | $5,573,029CK NEWBERRY, LLC | +12.6% |
| Mar 18, 2025 | 6481-45-001 | ABL-WEST-HMAHoward · Abilene | 1 of 3 | $671,913 | $671,913 | Won |
| Mar 11, 2025 | 6477-27-001 | 6477-27-001 Hot MixMidland · Odessa | 1 of 1 | $354,800 | $354,800 | Won |
| Mar 5, 2025 | 0397-02-041 | SH 152 Super 2Wheeler · Childress | 1 of 6 | $14,172,579 | $14,172,579 | Won |
| Mar 5, 2025 | 0641-01-038 | SH 276 Turn LaneHunt · Paris | 1 of 3 | $7,646,073 | $7,646,073 | Won |
| Mar 4, 2025 | 0202-09-033 | FM 697 - Widen RoadGrayson · Paris | 2 of 5 | $5,580,133 | $5,014,608LAKEY, INC. | +11.3% |
| Mar 4, 2025 | 0053-05-050 | US 84-FM 2458 to CR 386 CCSJGarza · Lubbock | 3 of 5 | $16,251,642 | $13,312,185A. L. HELMCAMP, INC. | +22.1% |
| Feb 7, 2025 | 0053-08-079 | US 84 0053-08 N OF FM 1611 TO AVE E WBScurry · Abilene | 1 of 5 | $8,390,976 | $8,390,976 | Won |
| Feb 7, 2025 | 0156-06-066 | US 82; US 183 to CR 218Baylor · Wichita Falls | 4 of 5 | $7,183,119 | $5,952,851A. L. HELMCAMP, INC. | +20.7% |
| Feb 6, 2025 | 0098-05-036 | SH 6 FM 2534, S to SH 222Knox · Childress | 3 of 5 | $4,508,967 | $4,478,136ZACK BURKETT CO. | +0.7% |
| Feb 6, 2025 | 0140-13-020 | 0140-13-020 IH 10 ACP OVERLAYCrockett · San Angelo | 3 of 6 | $26,437,779 | $24,564,337KIEWIT INFRASTRUCTURE SOUTH… | +7.6% |
| Jan 8, 2025 | 0076-07-040 | US67_REAGAN_C/L_E_OF_CR225Upton · Odessa | 4 of 4 | $18,500,000 | $13,723,466JONES BROS. DIRT & PAVING C… | +34.8% |
| Jan 8, 2025 | 0461-04-026 | SH 214 Sup 2 Morton to YoakumCochran · Lubbock | 4 of 5 | $33,866,914 | $28,894,124JAMES HAMILTON CONSTRUCTION… | +17.2% |
| Jan 7, 2025 | 0047-01-075 | US 75 Heavy Overlay 2bGrayson · Paris | 1 of 4 | $14,667,932 | $14,667,932 | Won |
| Jan 7, 2025 | 6476-19-001 | Dense Graded Hot Mix - Grayson CountyGrayson · Paris | 2 of 2 | $1,079,000 | $1,071,461AUSTIN ASPHALT, INC. | +0.7% |
| Jan 7, 2025 | 0069-04-047 | 0069-04-047 US 87 Sterling Co. Seal CoatSterling · San Angelo | 2 of 3 | $23,083,443 | $22,843,598REECE ALBERT, INC. | +1.0% |
| Dec 4, 2024 | 0011-04-029 | SH 351 SHACKELFORD - JONES TO E OF 604Shackelford · Abilene | 7 of 9 | $6,395,105 | $5,659,269FOUTSCO PAVING COMPANY, LLC | +13.0% |
| Dec 4, 2024 | 0052-05-046 | OV-US 84 Ltlfld to HockleyLamb · Lubbock | 2 of 6 | $29,205,229 | $25,868,924A. L. HELMCAMP, INC. | +12.9% |
| Nov 6, 2024 | 0042-03-047 | FY 25 US 287 OV ARMSTRONG COArmstrong · Amarillo | 3 of 5 | $20,630,583 | $19,891,474DUININCK, INC. | +3.7% |
| Aug 15, 2024 | 6467-86-001 | DENSE GRADED HOT MIXHunt · Paris | 1 of 3 | $463,500 | $463,500 | Won |
| Aug 2, 2024 | 0077-05-031 | PREVENTIVE MAINTENANCEIrion · San Angelo | 1 of 5 | $52,231,941 | $52,231,941 | Won |
| Aug 1, 2024 | 6466-87-001 | AGGREGATEGrayson · Paris | 1 of 2 | $1,495,416 | $1,495,416 | Won |
| Jul 9, 2024 | 6469-03-001 | MILL AND INLAYCarson · Amarillo | 2 of 2 | $4,983,750 | $4,669,500J. LEE MILLIGAN, INC. | +6.7% |
| Jul 9, 2024 | 6467-91-001 | MILL AND INLAYLamar · Paris | 2 of 3 | $7,502,796 | $6,589,398RICHARD DRAKE CONSTRUCTION … | +13.9% |
| Jun 6, 2024 | 1155-01-017 | HIGHWAY IMPROVEMENTMartin · Odessa | 2 of 4 | $28,365,169 | $26,967,769JONES BROS. DIRT & PAVING C… | +5.2% |
| Jun 6, 2024 | 0053-10-047 | RESURFACE ROADWAYScurry · Abilene | 1 of 3 | $9,325,297 | $9,325,297 | Won |
| Jun 6, 2024 | 0045-19-064 | PREVENTIVE MAINTENANCEGrayson · Paris | 3 of 4 | $12,292,784 | $10,591,400OVERLAND CORPORATION | +16.1% |
| Jun 5, 2024 | 2614-01-024 | INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TRandall · Amarillo | 2 of 2 | $35,759,832 | $28,487,051J. LEE MILLIGAN, INC. | +25.5% |
| Jun 5, 2024 | 0090-02-055 | HIGHWAY IMPROVEMENTOldham · Amarillo | 4 of 4 | $21,055,232 | $15,078,258KIEWIT INFRASTRUCTURE SOUTH… | +39.6% |
| Jun 5, 2024 | 6377-06-001 | HOT MIXRandall · Amarillo | 1 of 1 | $394,000 | $394,000 | Won |
| May 8, 2024 | 6465-67-001 | FLEXIBLE BASECollin · Dallas | 1 of 2 | $240,400 | $240,400 | Won |
| May 8, 2024 | 6465-72-001 | AGGREGATECollin · Dallas | 1 of 3 | $148,000 | $148,000 | Won |
| May 3, 2024 | 0005-06-126 | PREVENTIVE MAINTENANCEHoward · Abilene | 1 of 1 | $7,152,987 | $7,152,987 | Won |
| May 2, 2024 | 0455-03-038 | HIGHWAY IMPROVEMENTGray · Amarillo | 1 of 3 | $17,457,097 | $17,457,097 | Won |
| Apr 5, 2024 | 0081-10-052 | PREVENTIVE MAINTENANCEGrayson · Paris | 3 of 4 | $7,135,621 | $5,667,809OVERLAND CORPORATION | +25.9% |
| Apr 5, 2024 | 0045-09-109 | PREVENTIVE MAINTENANCELamar · Paris | 2 of 3 | $5,821,318 | $4,740,741RICHARD DRAKE CONSTRUCTION … | +22.8% |
| Apr 5, 2024 | 6463-59-001 | DENSE GRADED HOT MIXHunt · Paris | 1 of 3 | $652,950 | $652,950 | Won |
| Apr 4, 2024 | 0170-02-023 | PREVENTIVE MAINTENANCELipscomb · Amarillo | 4 of 4 | $21,606,268 | $19,475,601DUININCK, INC. | +10.9% |
| Apr 4, 2024 | 6463-28-001 | FLEXIBLE BASE / ASPHALT TREATMENTLamar · Paris | 2 of 2 | $1,652,070 | $1,592,700RICHARD DRAKE CONSTRUCTION … | +3.7% |
| Apr 4, 2024 | 6463-58-001 | DENSE GRADED HOT MIXHopkins · Paris | 2 of 2 | $755,000 | $742,200RICHARD DRAKE CONSTRUCTION … | +1.7% |
| Mar 6, 2024 | 6463-24-001 | DENSE GRADED HOT MIXFranklin · Paris | 1 of 1 | $832,000 | $832,000 | Won |
| Mar 6, 2024 | 6463-55-001 | DENSE GRADED HOT MIXLamar · Paris | 1 of 2 | $720,500 | $720,500 | Won |
| Mar 6, 2024 | 6463-56-001 | DENSE GRADED HOT MIXDelta · Paris | 1 of 1 | $745,000 | $745,000 | Won |
| Mar 5, 2024 | 6463-21-001 | DENSE GRADED HOT MIXRains · Paris | 1 of 2 | $665,000 | $665,000 | Won |
| Mar 5, 2024 | 6463-54-001 | DENSE GRADED HOT MIXRed River · Paris | 1 of 2 | $1,193,875 | $1,193,875 | Won |
| Mar 5, 2024 | 0264-02-029 | RESURFACE ROADWAYNolan · Abilene | 1 of 3 | $5,657,527 | $5,657,527 | Won |
| Mar 5, 2024 | 6462-85-001 | HOT MIXHartley · Amarillo | 2 of 3 | $630,000 | $600,000BIG CREEK SAND & GRAVEL, IN… | +5.0% |
| Mar 5, 2024 | 6462-15-001 | MILL AND INLAYBowie · Atlanta | 2 of 2 | $6,710,404 | $6,564,750EAST TEXAS BRIDGE, INC. | +2.2% |
| Mar 5, 2024 | 6463-19-001 | DENSE GRADED HOT MIXFannin · Paris | 1 of 3 | $769,200 | $769,200 | Won |
| Feb 2, 2024 | 1727-02-024 | REHABILITATE EXISTING ROADWAYMoore · Amarillo | 3 of 3 | $53,788,763 | $41,097,397J. LEE MILLIGAN, INC. | +30.9% |
| Feb 2, 2024 | 0218-03-086 | SURFACING/ROADWAY RESTORATIONCass · Atlanta | 1 of 3 | $9,573,841 | $9,573,841 | Won |
| Feb 2, 2024 | 0218-02-055 | RESURFACE ROADWAYBowie · Atlanta | 3 of 3 | $12,139,996 | $10,246,641EAST TEXAS BRIDGE, INC. | +18.5% |
| Feb 2, 2024 | 0045-18-043 | PREVENTIVE MAINTENANCEGrayson · Paris | 1 of 5 | $5,645,404 | $5,645,404 | Won |
| Feb 2, 2024 | 6392-01-001 | MILL AND INLAYScurry · Abilene | 1 of 2 | $1,567,467 | $1,567,467 | Won |
| Feb 1, 2024 | 0004-07-138 | ROADWAY REHABILITATIONEctor · Odessa | 2 of 3 | $28,490,918 | $24,827,053JONES BROS. DIRT & PAVING C… | +14.8% |
| Feb 1, 2024 | 0203-02-052 | PREVENTIVE MAINTENANCEHunt · Paris | 2 of 4 | $4,453,769 | $4,408,823EAST TEXAS BRIDGE, INC. | +1.0% |
| Feb 1, 2024 | 6462-31-001 | HOT MIXMidland · Odessa | 1 of 2 | $432,700 | $432,700 | Won |
| Jan 5, 2024 | 0189-05-051 | PREVENTIVE MAINTENANCEFranklin · Paris | 1 of 4 | $12,962,476 | $12,962,476 | Won |
| Jan 5, 2024 | 0218-03-094 | REHABILITATE EXISTING ROADWAYCass · Atlanta | 1 of 3 | $9,155,620 | $9,155,620 | Won |
| Jan 5, 2024 | 0248-01-082 | RESURFACE ROADWAYTitus · Atlanta | 2 of 3 | $2,912,169 | $2,881,430LONGVIEW BRIDGE AND ROAD, L… | +1.1% |
| Jan 5, 2024 | 0296-01-039 | PREVENTIVE MAINTENANCEScurry · Abilene | 2 of 4 | $3,279,734 | $3,120,195J. H. STRAIN & SONS, INC. | +5.1% |
| Jan 4, 2024 | 0693-01-034 | RESURFACE ROADWAYHoward · Abilene | 2 of 4 | $19,247,255 | $17,873,873CK NEWBERRY, LLC | +7.7% |
| Jan 4, 2024 | 0173-07-063 | PREVENTIVE MAINTENANCEHunt · Paris | 1 of 6 | $5,815,035 | $5,815,035 | Won |
| Jan 4, 2024 | 0168-05-043 | HIGHWAY IMPROVEMENTDeaf Smith · Amarillo | 6 of 6 | $2,903,025 | $1,956,451L A FULLER & SONS CONSTRUCT… | +48.4% |
| Dec 6, 2023 | 6437-49-001 | MILL AND INLAYMidland · Odessa | 4 of 5 | $2,864,400 | $2,233,068FNF CONSTRUCTION, INC. | +28.3% |
| Dec 6, 2023 | 6459-59-001 | DENSE GRADED HOT MIXGrayson · Paris | 1 of 2 | $941,000 | $941,000 | Won |
| Dec 5, 2023 | 0067-01-087 | CONSTRUCT PEDESTRIAN INFRASTRUCTURERandall · Amarillo | 4 of 4 | $13,970,181 | $9,542,615TI-ZACK CONCRETE, INC. | +46.4% |
| Nov 16, 2023 | 6458-57-001 | ASPHALTIC PATCHING MATERIALHunt · Paris | 1 of 1 | $293,970 | $293,970 | Won |
| Nov 2, 2023 | 0455-02-031 | HIGHWAY IMPROVEMENTCarson · Amarillo | 1 of 4 | $16,474,504 | $16,474,504 | Won |
| Nov 1, 2023 | 6457-57-001 | AGGREGATEHarrison · Atlanta | 1 of 2 | $314,430 | $314,430 | Won |
| Nov 1, 2023 | 6455-77-001 | HOT-MIX COLD-LAIDLamar · Paris | 2 of 2 | $1,569,600 | $1,525,575RICHARD DRAKE CONSTRUCTION … | +2.9% |
| Oct 17, 2023 | 6453-29-001 | HOT MIXBowie · Atlanta | 1 of 1 | $252,625 | $252,625 | Won |
| Oct 17, 2023 | 6453-15-001 | HOT MIXMorris · Atlanta | 1 of 1 | $236,750 | $236,750 | Won |
| Oct 17, 2023 | 6453-17-001 | HOT MIXUpshur · Atlanta | 3 of 3 | $244,250 | $219,750LONGVIEW BRIDGE AND ROAD, L… | +11.1% |
| Oct 17, 2023 | 6453-21-001 | HOT MIXCass · Atlanta | 1 of 1 | $262,000 | $262,000 | Won |
| Oct 17, 2023 | 6453-25-001 | HOT MIXTitus · Atlanta | 1 of 1 | $236,750 | $236,750 | Won |
| Oct 17, 2023 | 6453-27-001 | HOT MIXBowie · Atlanta | 1 of 1 | $260,125 | $260,125 | Won |
| Oct 6, 2023 | 1718-07-045 | INTERSECTION IMPROVEMENTMidland · Odessa | 2 of 3 | $13,500,000 | $10,681,717JONES BROS. DIRT & PAVING C… | +26.4% |
| Oct 6, 2023 | 0006-01-107 | PREVENTIVE MAINTENANCEMitchell · Abilene | 1 of 1 | $10,261,309 | $10,261,309 | Won |
| Oct 6, 2023 | 0983-03-030 | PREVENTIVE MAINTENANCENolan · Abilene | 5 of 5 | $3,933,569 | $3,360,261REECE ALBERT, INC. | +17.1% |
| Oct 5, 2023 | 0105-02-023 | OVERLAYHall · Childress | 4 of 4 | $8,165,962 | $6,639,790J. LEE MILLIGAN, INC. | +23.0% |
| Oct 5, 2023 | 6452-07-001 | ROCK/RIPRAPHunt · Paris | 4 of 4 | $700,550 | $582,000TOUCHSTONE RESOURCES, LLC | +20.4% |
| Sep 7, 2023 | 0168-08-075 | REHABILITATE EXISTING ROADWAYRandall · Amarillo | 2 of 4 | $38,421,699 | $34,924,134DUININCK, INC. | +10.0% |
| Sep 7, 2023 | 0006-04-080 | PREVENTIVE MAINTENANCETaylor · Abilene | 2 of 3 | $13,824,449 | $12,105,732FOUTSCO PAVING COMPANY, LLC | +14.2% |
| Sep 7, 2023 | 0650-03-036 | REHABILITATE EXISTING ROADWAY / BRIDGE REPLACEMENTRunnels · San Angelo | 1 of 3 | $21,350,245 | $21,350,245 | Won |
| Sep 7, 2023 | 6447-73-001 | AGGREGATEGrayson · Paris | 1 of 1 | $2,055,511 | $2,055,511 | Won |
| Sep 6, 2023 | 2139-04-023 | ADDING SHOULDERS WITH NO ADDED CAPACITYHunt · Paris | 3 of 3 | $13,074,121 | $11,405,903D. L. LENNON INCORPORATED -… | +14.6% |
| Sep 6, 2023 | 0042-06-076 | HIGHWAY IMPROVEMENTDonley · Childress | 3 of 5 | $6,929,166 | $6,446,301J. LEE MILLIGAN, INC. | +7.5% |
| Aug 3, 2023 | 6447-22-001 | DENSE GRADED HOT MIXHunt · Paris | 1 of 3 | $439,560 | $439,560 | Won |
| Aug 2, 2023 | 0558-03-028 | WIDEN ROAD - ADD SHOULDERSBorden · Abilene | 2 of 3 | $3,478,029 | $3,149,254DUININCK, INC. | +10.4% |
| Jun 27, 2023 | 0548-02-043 | INTERSECTION IMPROVEMENTMartin · Odessa | 3 of 5 | $6,998,461 | $5,880,108JONES BROS. DIRT & PAVING C… | +19.0% |
| Jun 27, 2023 | 6397-78-001 | HOT MIXArmstrong · Amarillo | 1 of 1 | $381,000 | $381,000 | Won |
| Jun 27, 2023 | 6443-16-001 | MILL AND INLAYLamar · Paris | 2 of 3 | $6,909,109 | $6,031,609RICHARD DRAKE CONSTRUCTION … | +14.5% |
| May 5, 2023 | 0449-01-023 | WIDEN ROAD - ADD LANES AND SHOULDERSCollingsworth · Childress | 3 of 4 | $8,564,811 | $7,122,577J. LEE MILLIGAN, INC. | +20.2% |
| May 4, 2023 | 0005-06-121 | PREVENTIVE MAINTENANCEHoward · Abilene | 1 of 2 | $8,336,657 | $8,336,657 | Won |
| May 4, 2023 | 1231-01-069 | RESURFACE EXISTING 4-LANE HIGHWAYBowie · Atlanta | 1 of 2 | $1,902,108 | $1,902,108 | Won |
| May 4, 2023 | 6435-78-001 | FLEXIBLE BASELamar · Paris | 2 of 2 | $1,606,120 | $1,533,000RICHARD DRAKE CONSTRUCTION … | +4.8% |
| Apr 5, 2023 | 0494-08-016 | HIGHWAY IMPROVEMENTGlasscock · San Angelo | 1 of 3 | $32,993,651 | $32,993,651 | Won |
| Apr 5, 2023 | 0136-03-066 | PREVENTIVE MAINTENANCEDelta · Paris | 3 of 3 | $8,020,286 | $6,659,254RICHARD DRAKE CONSTRUCTION … | +20.4% |
| Apr 5, 2023 | 2597-01-008 | INSTALL/REPLACE SIGNSHoward · Abilene | 1 of 2 | $5,256,052 | $5,256,052 | Won |
| Apr 5, 2023 | 6435-60-001 | MILL AND INLAYCarson · Amarillo | 2 of 2 | $6,698,500 | $5,263,125J. LEE MILLIGAN, INC. | +27.3% |
| Apr 5, 2023 | 6433-86-001 | DENSE GRADED HOT MIXHunt · Paris | 1 of 3 | $620,500 | $620,500 | Won |
| Mar 14, 2023 | 6397-72-001 | HOT MIXRandall · Amarillo | 3 of 4 | $284,000 | $265,490L A FULLER & SONS CONSTRUCT… | +7.0% |
| Mar 14, 2023 | 6434-58-001 | SANDMidland · Odessa | 3 of 5 | $20,700 | $17,750TOUCHSTONE RESOURCES, LLC | +16.6% |
| Mar 8, 2023 | 6431-68-001 | DENSE GRADED HOT MIXDelta · Paris | 1 of 1 | $632,500 | $632,500 | Won |
| Mar 8, 2023 | 6407-96-001 | MILL AND INLAYReeves · Odessa | 3 of 5 | $2,245,473 | $1,668,546DAN WILLIAMS COMPANY | +34.6% |
| Mar 8, 2023 | 6431-70-001 | DENSE GRADED HOT MIXRed River · Paris | 1 of 1 | $1,157,500 | $1,157,500 | Won |
| Mar 7, 2023 | 6431-66-001 | DENSE GRADED HOT MIXLamar · Paris | 1 of 2 | $632,500 | $632,500 | Won |
| Mar 7, 2023 | 6431-42-001 | DENSE GRADED HOT MIXRains · Paris | 2 of 3 | $621,250 | $620,500TEXAS MATERIALS GROUP, INC. | +0.1% |
| Feb 2, 2023 | 0356-01-107 | HIGHWAY IMPROVEMENTHutchinson · Amarillo | 1 of 4 | $9,658,644 | $9,658,644 | Won |
| Feb 2, 2023 | 3571-02-008 | ROADWAY REHABILITATIONMidland · Odessa | 2 of 3 | $5,993,918 | $5,214,763JONES BROS. DIRT & PAVING C… | +14.9% |
| Feb 2, 2023 | 6430-75-001 | DENSE GRADED HOT MIXFranklin · Paris | 1 of 2 | $712,000 | $712,000 | Won |
| Feb 1, 2023 | 0218-03-087 | REHABILITATE EXISTING FOUR LANE ROADWAYCass · Atlanta | 1 of 2 | $9,089,429 | $9,089,429 | Won |
| Feb 1, 2023 | 6428-70-001 | DENSE GRADED HOT MIXFannin · Paris | 1 of 3 | $704,000 | $704,000 | Won |
| Jan 6, 2023 | 0168-07-050 | REHABILITATE EXISTING ROADWAYDeaf Smith · Amarillo | 1 of 4 | $23,784,486 | $23,784,486 | Won |
| Jan 6, 2023 | 0005-05-113 | PREVENTIVE MAINTENANCEHoward · Abilene | 1 of 1 | $6,309,354 | $6,309,354 | Won |
| Jan 6, 2023 | 6397-69-001 | HOT MIXMoore · Amarillo | 1 of 2 | $578,750 | $578,750 | Won |
| Jan 6, 2023 | 6409-43-001 | MILL AND INLAYEctor · Odessa | 3 of 4 | $1,938,446 | $1,499,254FNF CONSTRUCTION, INC. | +29.3% |
| Jan 6, 2023 | 6425-26-001 | HOT-MIX COLD-LAIDLamar · Paris | 2 of 2 | $1,569,600 | $1,319,550RICHARD DRAKE CONSTRUCTION … | +18.9% |
| Jan 5, 2023 | 0068-07-051 | RESURFACE ROADWAYHoward · Abilene | 1 of 1 | $7,456,744 | $7,456,744 | Won |
| Jan 5, 2023 | 0901-19-176 | PREVENTIVE MAINTENANCEGrayson · Paris | 3 of 3 | $5,064,936 | $4,478,108FNH CONSTRUCTION, LLC | +13.1% |
| Jan 5, 2023 | 6426-10-001 | DENSE GRADED HOT MIXGrayson · Paris | 1 of 2 | $800,000 | $800,000 | Won |
| Nov 15, 2022 | 6423-09-001 | HOT MIXHoward · Abilene | 1 of 1 | $299,900 | $299,900 | Won |
| Nov 3, 2022 | 0141-02-033 | ACP OVERLAYSutton · San Angelo | 2 of 4 | $22,839,593 | $21,298,154DELHUR INDUSTRIES, INC. | +7.2% |
| Nov 2, 2022 | 0141-08-050 | PREVENTIVE MAINTENANCEKimble · San Angelo | 4 of 4 | $10,401,737 | $9,718,660ALLEN KELLER COMPANY | +7.0% |
| Nov 2, 2022 | 0030-07-022 | SURFACING/ROADWAY RESTORATIONHemphill · Amarillo | 4 of 4 | $6,224,843 | $5,382,630DUININCK, INC. | +15.6% |
| Nov 2, 2022 | 6423-64-001 | MILL AND INLAYScurry · Abilene | 1 of 3 | $1,251,245 | $1,251,245 | Won |
| Nov 2, 2022 | 6417-68-001 | AGGREGATEHarrison · Atlanta | 1 of 2 | $727,489 | $727,489 | Won |
| Oct 12, 2022 | 6419-70-001 | HOT MIXMorris · Atlanta | 1 of 1 | $307,962 | $307,962 | Won |
| Oct 12, 2022 | 6419-72-001 | HOT MIXUpshur · Atlanta | 1 of 3 | $320,142 | $320,142 | Won |
| Oct 12, 2022 | 6419-76-001 | HOT MIXCass · Atlanta | 1 of 1 | $336,560 | $336,560 | Won |
| Oct 12, 2022 | 6419-80-001 | HOT MIXTitus · Atlanta | 1 of 1 | $307,962 | $307,962 | Won |
| Oct 12, 2022 | 6419-82-001 | HOT MIXBowie · Atlanta | 1 of 1 | $333,515 | $333,515 | Won |
| Oct 12, 2022 | 6419-84-001 | HOT MIXBowie · Atlanta | 1 of 1 | $321,335 | $321,335 | Won |
| Oct 11, 2022 | 6421-22-001 | SANDPecos · Odessa | 2 of 3 | $22,750 | $19,300TOUCHSTONE RESOURCES, LLC | +17.9% |
| Oct 6, 2022 | 0557-02-019 | SURFACING/ROADWAY RESTORATIONHutchinson · Amarillo | 2 of 5 | $7,194,490 | $7,081,620DUININCK, INC. | +1.6% |
| Oct 6, 2022 | 0157-09-004 | RESURFACE ROADWAYHaskell · Abilene | 6 of 7 | $6,905,024 | $5,949,106A. L. HELMCAMP, INC. | +16.1% |
| Oct 6, 2022 | 0354-04-040 | ROADWAY REHABILITATIONWinkler · Odessa | 1 of 4 | $8,225,180 | $8,225,180 | Won |
| Sep 8, 2022 | 0650-01-035 | WIDEN ROAD - ADD LANESNolan · Abilene | 3 of 3 | $15,997,858 | $14,078,927NOBLES ROAD CONSTRUCTION, I… | +13.6% |
| Sep 8, 2022 | 1245-02-050 | PREVENTIVE MAINTENANCEPotter · Amarillo | 1 of 5 | $7,909,237 | $7,909,237 | Won |
| Sep 8, 2022 | 0005-05-113 | PREVENTIVE MAINTENANCEHoward · Abilene | 1 of 1 | $6,527,873 | $6,527,873 | Won |
| Sep 7, 2022 | 0248-01-081 | REHABILITATE EXISTING ROADWAYTitus · Atlanta | 1 of 2 | $5,186,944 | $5,186,944 | Won |
| Sep 7, 2022 | 0076-06-037 | WIDEN ROAD - ADD LANESUpton · Odessa | 3 of 3 | $30,109,341 | $26,727,485JONES BROS. DIRT & PAVING C… | +12.7% |
| Sep 7, 2022 | 6414-69-001 | AGGREGATEGrayson · Paris | 1 of 2 | $1,614,951 | $1,614,951 | Won |
| Sep 7, 2022 | 0032-01-034 | OVERLAYChildress · Childress | 1 of 5 | $7,466,260 | $7,466,260 | Won |
| Sep 7, 2022 | 0453-04-024 | REHABILIATIONCrosby · Lubbock | 4 of 4 | $27,982,885 | $23,557,971DUININCK, INC. | +18.8% |
| Aug 4, 2022 | 0045-18-044 | HAZARD ELIMINATION & SAFETYGrayson · Paris | 2 of 2 | $1,977,380 | $1,851,967JAGOE-PUBLIC COMPANY | +6.8% |
| Aug 4, 2022 | 0704-02-022 | WIDENING OF A NON-FREEWAY FACILITYChildress · Childress | 1 of 6 | $17,182,341 | $17,182,341 | Won |
| Aug 3, 2022 | 1155-04-013 | WIDEN ROAD - ADD SHOULDERSBorden · Abilene | 3 of 3 | $4,586,229 | $4,392,391GILVIN-TERRILL, LTD. | +4.4% |
| Aug 3, 2022 | 6407-61-001 | ROCK/RIP RAPHunt · Paris | 2 of 2 | $816,000 | $439,200DIGG COMMERCIAL, LLC | +85.8% |
| Jun 30, 2022 | 0292-01-034 | HIGHWAY IMPROVEMENTWinkler · Odessa | 3 of 3 | $39,415,393 | $37,268,536JONES BROS. DIRT & PAVING C… | +5.8% |
| Jun 30, 2022 | 6401-93-001 | MILL AND INLAYLamar · Paris | 2 of 2 | $4,476,564 | $3,805,754RICHARD DRAKE CONSTRUCTION … | +17.6% |
| Jun 29, 2022 | 0218-04-119 | RESURFACE EXISTING 4-LANE ROADWAYCass · Atlanta | 2 of 2 | $12,170,177 | $11,842,462EAST TEXAS BRIDGE, INC. | +2.8% |
| Jun 29, 2022 | 6407-13-001 | HOT MIXRandall · Amarillo | 1 of 2 | $362,000 | $362,000 | Won |
| Jun 29, 2022 | 6403-60-001 | DENSE GRADE HOT MIXHunt · Paris | 1 of 2 | $472,500 | $472,500 | Won |
| Jun 7, 2022 | 6404-32-001 | AGGREGATECollin · Dallas | 3 of 3 | $73,750 | $70,000TOUCHSTONE RESOURCES, LLC | +5.4% |
| May 4, 2022 | 6400-41-001 | FLEX BASE & ASPHALT TREATMENTLamar · Paris | 2 of 2 | $1,349,475 | $1,271,275RICHARD DRAKE CONSTRUCTION … | +6.2% |
| Apr 7, 2022 | 6398-44-001 | DENSE GRADED HOT MIXHopkins · Paris | 1 of 1 | $689,500 | $689,500 | Won |
| Apr 6, 2022 | 6397-98-001 | DENSE GRADED HOT MIXHunt · Paris | 1 of 2 | $587,125 | $587,125 | Won |
| Mar 23, 2022 | 6396-62-001 | HOT-MIX COLD-LAIDTitus · Atlanta | 1 of 1 | $84,250 | $84,250 | Won |
| Feb 16, 2022 | 6396-52-001 | HOT MIXMorris · Atlanta | 1 of 1 | $280,640 | $280,640 | Won |
| Feb 16, 2022 | 6396-53-001 | HOT MIXUpshur · Atlanta | 2 of 2 | $292,240 | $266,000LONGVIEW ASPHALT, INC. | +9.9% |
| Feb 16, 2022 | 6396-55-001 | HOT MIXCass · Atlanta | 1 of 1 | $307,900 | $307,900 | Won |
| Feb 16, 2022 | 6396-57-001 | HOT MIXTitus · Atlanta | 1 of 1 | $280,640 | $280,640 | Won |
| Feb 16, 2022 | 6396-58-001 | HOT MIXBowie · Atlanta | 1 of 1 | $305,000 | $305,000 | Won |
| Feb 16, 2022 | 6396-59-001 | HOT MIXBowie · Atlanta | 1 of 1 | $293,400 | $293,400 | Won |
| Feb 10, 2022 | 6395-93-001 | HOT MIXDeaf Smith · Amarillo | 2 of 2 | $310,800 | $281,390L A FULLER & SONS CONSTRUCT… | +10.5% |
| Feb 10, 2022 | 6396-04-001 | HOT MIXMoore · Amarillo | 1 of 2 | $310,800 | $310,800 | Won |
| Feb 10, 2022 | 6396-05-001 | HOT MIX ASPHALTIC CONCRETE ~ MATERIALS ONLYGray · Amarillo | 2 of 3 | $310,800 | $281,390L A FULLER & SONS CONSTRUCT… | +10.5% |
| Feb 4, 2022 | 6382-48-001 | HOT MIX ASPHALTIC CONCRETE ~ MATERIALS ONLYMoore · Amarillo | 2 of 2 | $2,877,625 | $2,454,970BIG CREEK SAND & GRAVEL, IN… | +17.2% |
| Feb 4, 2022 | 6382-50-001 | HOT MIX ASPHALTIC CONCRETE ~ MATERIALS ONLYOchiltree · | 2 of 3 | $993,050 | $928,000BIG CREEK SAND & GRAVEL, IN… | +7.0% |
| Feb 4, 2022 | 6382-47-001 | AMARILLO AREA HMAC IN-HOUSE PAVING-HOT MIXOldham · Amarillo | 1 of 1 | $1,172,250 | $1,172,250 | Won |
| Feb 4, 2022 | 6395-56-001 | TOTAL MAINTENANCE ROADWAY REPAIRSPotter · Amarillo | 2 of 2 | $6,585,723 | $6,290,664J. LEE MILLIGAN, INC. | +4.7% |
| Feb 4, 2022 | 6395-67-001 | DENSE GRADED HOT MIXDelta · Paris | 1 of 1 | $522,000 | $522,000 | Won |
| Feb 4, 2022 | 6395-68-001 | DENSE GRADED HOT MIXRed River · Paris | 1 of 1 | $455,000 | $455,000 | Won |
| Feb 4, 2022 | 1872-02-019 | INSTALL/REPLACE SIGNSHoward · Abilene | 1 of 3 | $995,017 | $995,017 | Won |
| Feb 4, 2022 | 1245-02-049 | HIGHWAY IMPROVEMENTPotter · Amarillo | 2 of 5 | $13,405,631 | $12,755,021KIEWIT INFRASTRUCTURE SOUTH… | +5.1% |
| Feb 3, 2022 | 6394-41-001 | DENSE GRADED HOT MIXFannin · Paris | 1 of 1 | $455,000 | $455,000 | Won |
| Feb 3, 2022 | 6395-66-001 | DENSE GRADED HOT MIXLamar · Paris | 1 of 1 | $500,500 | $500,500 | Won |
| Feb 3, 2022 | 1245-01-019 | HIGHWAY IMPROVEMENTOldham · Amarillo | 4 of 4 | $21,561,020 | $18,084,714KIEWIT INFRASTRUCTURE SOUTH… | +19.2% |
| Jan 7, 2022 | 0228-04-043 | ROADWAY REHABILITATIONAndrews · Odessa | 4 of 5 | $44,949,687 | $37,642,802REECE ALBERT, INC. | +19.4% |
| Jan 7, 2022 | 0296-01-038 | PREVENTIVE MAINTENANCEScurry · Abilene | 1 of 3 | $7,417,904 | $7,417,904 | Won |
| Jan 7, 2022 | 2879-02-014 | RESURFACE EXISTING ROADWAYBowie · Atlanta | 1 of 3 | $651,270 | $651,270 | Won |
| Jan 7, 2022 | 0379-01-046 | REHABILITATE EXISTING ROADWAYHutchinson · Amarillo | 2 of 5 | $9,569,172 | $9,504,385DUININCK, INC. | +0.7% |
| Jan 6, 2022 | 0033-01-038 | WIDEN ROAD - ADD LANESStonewall · Abilene | 4 of 6 | $15,670,930 | $14,492,854J. H. STRAIN & SONS, INC. | +8.1% |
| Jan 6, 2022 | 0157-04-057 | PREVENTIVE MAINTENANCEHaskell · Abilene | 4 of 5 | $5,973,351 | $5,473,497ZACK BURKETT CO. | +9.1% |
| Jan 6, 2022 | 0127-01-037 | PREVENTIVE MAINTENANCEEastland · Brownwood | 5 of 5 | $3,011,079 | $2,839,911DUININCK, INC. | +6.0% |
| Jan 6, 2022 | 0238-04-038 | HIGHWAY IMPROVEMENTDallam · Amarillo | 1 of 3 | $8,285,085 | $8,285,085 | Won |
| Jan 6, 2022 | 0070-02-091 | PREVENTIVE MAINTENANCETom Green · San Angelo | 3 of 4 | $11,771,171 | $9,737,926REECE ALBERT, INC. | +20.9% |
| Jan 6, 2022 | 0030-01-035 | HIGHWAY IMPROVEMENTOchiltree · | 2 of 4 | $5,889,421 | $5,571,551DUININCK, INC. | +5.7% |
| Jan 6, 2022 | 0133-01-049 | REHABILITATIONKing · Childress | 5 of 5 | $7,278,773 | $5,768,976A. L. HELMCAMP, INC. | +26.2% |
| Jan 6, 2022 | 6393-44-001 | DENSE GRADED HOT MIX (MATERIAL ONLY)Grayson · Paris | 1 of 2 | $623,000 | $623,000 | Won |
| Dec 2, 2021 | 6393-15-001 | DENSE GRADED HOT MIXFranklin · Paris | 1 of 2 | $732,000 | $732,000 | Won |
| Dec 1, 2021 | 0275-01-221 | PREVENTIVE MAINTENANCEPotter · Amarillo | 3 of 3 | $16,824,763 | $13,120,890J. LEE MILLIGAN, INC. | +28.2% |
| Dec 1, 2021 | 0463-03-052 | ROADWAY REHABILITATIONMidland · Odessa | 3 of 6 | $8,621,243 | $6,727,054JONES BROS. DIRT & PAVING C… | +28.2% |
Active prime contracts 14
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6510-64-001Let Oct 15, 2026 | HuntParis · IH0030 | $402,428 | |||
| 0248-02-072Let Jan 6, 2026 | CampAtlanta · US 271 | REHABILITATION OF EXISTING ROAD | $5,204,798 | 98% | |
| 6492-97-001Let Dec 3, 2025 | LamarParis · BU0271B | MAINTENANCE | $3,194,199 | 4% | |
| 0042-12-096Let Nov 6, 2025 | ChildressChildress · US 287 | OVERLAY | $5,195,052 | 78% | |
| 6491-75-001Let Oct 16, 2025 | HuntParis · IH0030 | MAINTENANCE | $622,919 | 19% | |
| 0380-06-019Let Sep 5, 2025 | DawsonLubbock · SH 349 | REHABILITATION OF EXISTING ROAD | $18,376,448 | 90% | |
| 6487-53-001Let Sep 4, 2025 | MidlandOdessa · IH0020 | MAINTENANCE | $1,732,902 | 93% | |
| 6486-01-001Let Jul 23, 2025 | RandallAmarillo · IH0027 | MATERIALS-ONLY CONTRACT | $1,126,500 | 448% | |
| 6482-60-001Let Jun 5, 2025 | SmithTyler · US0069 | MATERIALS-ONLY CONTRACT | $4,118,001 | 65% | |
| 6481-45-001Let Mar 18, 2025 | HowardAbilene · IH0020 | MATERIALS-ONLY CONTRACT | $671,913 | 386% | |
| 0397-02-041Let Mar 5, 2025 | WheelerChildress · SH 152 | MISCELLANEOUS CONSTRUCTION | $14,538,477 | 104% | |
| 0641-01-038Let Mar 5, 2025 | HuntParis · SH 276 | HAZARD ELIMINATION & SAFETY | $8,513,483 | 119% | |
| 0077-05-031Let Aug 2, 2024 | IrionSan Angelo · US 67 | OVERLAY | $54,759,079 | 52% | |
| 0494-08-016Let Apr 5, 2023 | GlasscockSan Angelo · SH 137 | REHABILITATION OF EXISTING ROAD | $35,649,036 | 100% |
Subcontracts on active jobs 13
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 1014-04-018Let Dec 3, 2025 | D. L. LENNON INCORPORATED - CONTRACTOR | CollinDallas | REHABILITATION OF EXISTING ROAD | 14.5% | $885,634 |
| 1815-01-009Let Sep 4, 2025 | A. K. GILLIS & SONS, LLC | FanninParis | REHABILITATION OF EXISTING ROAD | 17.27% | $979,375 |
| 1480-02-035Let Aug 8, 2025 | TI-ZACK CONCRETE, LLC | RandallAmarillo | MISCELLANEOUS CONSTRUCTION | 7.79% | $922,186 |
| 0279-02-050Let Jun 4, 2025 | D. L. LENNON INCORPORATED - CONTRACTOR | FanninParis | REHABILITATION OF EXISTING ROAD | 38.11% | $6,293,369 |
| 1014-01-013Let May 2, 2025 | A. K. GILLIS & SONS, LLC | CollinDallas | REHABILITATION OF EXISTING ROAD | 22.69% | $3,925,190 |
| 0173-06-055Let Mar 5, 2025 | CDM HOLDINGS | HuntParis | REHABILITATION OF EXISTING ROAD | 29.45% | $2,872,867 |
| 1337-01-026Let Mar 4, 2025 | EARTH BUILDERS, L.P. | LipscombAmarillo | BRIDGE REPLACEMENT | 1.31% | $247,648 |
| 0642-02-018Let Jan 8, 2025 | CDM HOLDINGS | HuntParis | REHABILITATION OF EXISTING ROAD | 24.18% | $1,678,663 |
| 0009-18-021Let Dec 3, 2024 | CDM HOLDINGS | HopkinsParis | SEAL COAT | 28.36% | $4,228,235 |
| 2656-01-005Let Jun 5, 2024 | A. K. GILLIS & SONS, LLC | FanninParis | REHABILITATION OF EXISTING ROAD | 26.02% | $1,991,054 |
| 6462-15-001Let Mar 5, 2024 | EAST TEXAS BRIDGE, INC. | BowieAtlanta | MAINTENANCE | 11.92% | $800,000 |
| 0275-04-061Let Dec 5, 2023 | BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | CarsonAmarillo | OVERLAY | 0.64% | $101,737 |
| 2139-04-023Let Sep 6, 2023 | D. L. LENNON INCORPORATED - CONTRACTOR | HuntParis | MISCELLANEOUS CONSTRUCTION | 50.77% | $6,297,068 |