| 1 | 134-6001 |
BACKFILL (TY A) | 665 | STA |
$400.00 |
$200.00 |
| 2 | 351-6013 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 17,724 | SY |
$40.00 |
$65.00 |
| 3 | 500-6001 |
MOBILIZATION | 1 | LS |
$620,793.00 |
$422,666.20 |
| 4 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$8,000.00 |
$28,000.00 |
| 5 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 126,478 | LF |
$0.1900 |
$0.1800 |
| 6 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 64 | EA |
$655.00 |
$962.50 |
| 7 | 644-6002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 32 | EA |
$1,040.00 |
$1,072.50 |
| 8 | 644-6028 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 11 | EA |
$1,150.00 |
$1,155.00 |
| 9 | 644-6076 |
REMOVE SM RD SN SUP&AM | 40 | EA |
$100.00 |
$110.00 |
| 10 | 658-6044 |
INSTL DEL ASSM (D-DY)SZ 2(WC)GND | 32 | EA |
$85.00 |
$104.50 |
| 11 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 4,986 | EA |
$1.50 |
$4.00 |
| 12 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 2,535 | LF |
$1.10 |
$1.10 |
| 13 | 666-6300 |
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | 16,616 | LF |
$0.4800 |
$0.5200 |
| 14 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 64,119 | LF |
$0.4500 |
$0.5200 |
| 15 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 63,684 | LF |
$0.4500 |
$0.5200 |
| 16 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 796 | LF |
$15.00 |
$16.50 |
| 17 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 10 | EA |
$342.00 |
$275.00 |
| 18 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 10 | EA |
$425.00 |
$385.00 |
| 19 | 672-6010 |
REFL PAV MRKR TY II-C-R | 961 | EA |
$3.50 |
$4.68 |
| 20 | 3077-6034 |
SP MIXES SP-C SAC-B PG76-22 | 32,649 | TON |
$145.00 |
$154.50 |
| 21 | 3077-6075 |
TACK COAT | 29,959 | GAL |
$6.00 |
$5.58 |
| 22 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$24,389.50 |
| 23 | 6185-6002 |
TMA (STATIONARY) | 127 | DAY |
$325.00 |
$400.00 |
| 24 | 6185-6005 |
TMA (MOBILE OPERATION) | 81 | DAY |
$500.00 |
$800.00 |