Contact information
- mark@larryyoungpaving.com
- Phone
- (979) 823-4888
- Fax
- (979) 823-4884
- Address
- 1852 SILVER HILL RD., BRYAN, TX 77807
- TxDOT prequalification
- Construction qualified
90BidsNov 3, 2016 to Nov 4, 2026
28Wins (low bidder)
31.1%Win rate
$107,533,415Total won
Competitor scorecard
Last 5 years in Texas27.9%Win rate19 of 68 bids
+5.1%Average bid vs estimate
-2.0%Winning bids vs estimate
+16.2%Over the low bid when they loseAverage field: 7.2 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| KNIFE RIVER CORPORATION - SOUTH | 41 | 28 | 13 | 68% |
| TEXAS MATERIALS GROUP, INC. | 39 | 29 | 10 | 74% |
| BIG CREEK CONSTRUCTION, LTD. | 28 | 16 | 12 | 57% |
| BRAZOS PAVING, INC. | 22 | 20 | 2 | 91% |
| CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. | 14 | 8 | 6 | 57% |
| C. E. BARKER, LTD. | 10 | 7 | 3 | 70% |
| A. L. HELMCAMP, INC. | 9 | 8 | 1 | 89% |
| FORDE CONSTRUCTION COMPANY, INC. | 9 | 7 | 2 | 78% |
| GARRET SHIELDS INFRASTRUCTURE | 9 | 3 | 6 | 33% |
| JAMES CONSTRUCTION GROUP, LLC | 9 | 6 | 3 | 67% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 4, 2026 | 0262-01-034 | FM 485 - W and E of FM 979 - FY 27Milam · Bryan | 2 of 7 | $10,182,780 | $9,787,627BIG CREEK CONSTRUCTION, LTD. | +4.0% |
| Oct 6, 2026 | 0590-05-057 | FM 486 Downtown Streetscape - TASAMilam · Bryan | 6 of 10 | $377,702 | $257,450YOKO EXCAVATING, LLC | +46.7% |
| Aug 6, 2026 | 0051-09-128 | FM 3005: Kiva Rd to S of 89th StGalveston · Houston | 7 of 14 | $3,030,198 | $2,099,052JASCO | +44.4% |
| Aug 6, 2026 | 0114-10-102 | US 290WB F: FM 1155 T: Waller CL -RER 26Washington · Bryan | 5 of 6 | $5,034,763 | $4,287,440BIG CREEK CONSTRUCTION, LTD. | +17.4% |
| Aug 5, 2026 | 0186-03-071 | SH 36 F: S of SH 21 T: CR 122 -IOI FY 26Burleson · Bryan | 4 of 6 | $5,538,882 | $4,987,865BIG CREEK CONSTRUCTION, LTD. | +11.0% |
| Aug 5, 2026 | 0204-06-069 | US 79 at CR 308 - Signal FY 26Milam · Bryan | 1 of 4 | $366,495 | $366,495 | Won |
| Aug 5, 2026 | 0917-16-040 | CR 244 At Eads CreekLeon · Bryan | 6 of 8 | $2,797,371 | $2,572,458THK CONSTRUCTION LLC | +8.7% |
| Jul 1, 2026 | 0540-03-039 | FM 974 F: FM 2776 T: south - FY 27Brazos · Bryan | 3 of 8 | $4,285,538 | $3,771,592BIG CREEK CONSTRUCTION, LTD. | +13.6% |
| Jun 2, 2026 | 0315-03-070 | SH 90 at FM 244 - Turn Lane FY 26Grimes · Bryan | 1 of 7 | $1,241,183 | $1,241,183 | Won |
| May 7, 2026 | 0110-01-052 | SH 75 at FM 2296 - FY 25Walker · Bryan | 2 of 5 | $3,123,380 | $2,980,129BIG CREEK CONSTRUCTION, LTD. | +4.8% |
| May 6, 2026 | 0643-05-067 | FM 3090/Blackshear St. - TASAGrimes · Bryan | 2 of 10 | $2,041,635 | $1,828,629GARRET SHIELDS INFRASTRUCTU… | +11.6% |
| Apr 8, 2026 | 0114-10-108 | US 290 F: FM 577 T: FM 1155 - FY 26Washington · Bryan | 6 of 7 | $7,656,043 | $6,537,278DURWOOD GREENE CONSTRUCTION… | +17.1% |
| Apr 7, 2026 | 0917-19-062 | CR 830 AT EAST FORK OF MILL CREEK - BRWashington · Bryan | 8 of 9 | $941,452 | $732,054GARRET SHIELDS INFRASTRUCTU… | +28.6% |
| Mar 5, 2026 | 0917-29-149 | William D Fitch at Pebble Creek SignalBrazos · Bryan | 1 of 9 | $421,790 | $421,790 | Won |
| Jan 7, 2026 | 1986-01-073 | FM 1314: N of SH 242Montgomery · Houston | 3 of 12 | $2,384,656 | $2,219,724R CONSTRUCTION CIVIL, LLC | +7.4% |
| Jan 7, 2026 | 1607-01-056 | FM 1764 - I-45 to SH 146Galveston · Houston | 11 of 12 | $5,083,058 | $4,291,676THIRD COAST SERVICES LLC | +18.4% |
| Jan 6, 2026 | 1259-02-022 | FM 1097, SH 75 to Walker C/LMontgomery · Houston | 5 of 7 | $5,972,417 | $4,872,185DURWOOD GREENE CONSTRUCTION… | +22.6% |
| Dec 3, 2025 | 0265-14-018 | BS 71E SIDEWALKS 2709Fayette · Yoakum | 1 of 12 | $4,027,355 | $4,027,355 | Won |
| Dec 2, 2025 | 0833-13-014 | FM 2039 AT PORTER CREEK - BRBurleson · Bryan | 1 of 9 | $2,315,333 | $2,315,333 | Won |
| Nov 12, 2025 | 6492-11-001 | FY27 - Large Guide Sign -11Brazos · Bryan | 7 of 10 | $219,254 | $179,565HAZMAT INTERNATIONAL, INC. | +22.1% |
| Nov 6, 2025 | 0117-05-063 | SH 21 E of IH 45 - TWLT FY 26Madison · Bryan | 2 of 8 | $2,378,582 | $2,014,433BIG CREEK CONSTRUCTION, LTD. | +18.1% |
| Nov 5, 2025 | 0315-06-047 | SH 105 AT JACKSON CREEK - BRWashington · Bryan | 1 of 12 | $2,813,308 | $2,813,308 | Won |
| Oct 9, 2025 | 2017-01-010 | FM 2145 REHABILITATE ROADWAY 2404Fayette · Yoakum | 3 of 7 | $6,582,737 | $5,752,555DEAN WORD COMPANY, LTD. | +14.4% |
| Oct 9, 2025 | 0917-18-088 | Va Robertson County - Back Plates FY 26Robertson · Bryan | 8 of 9 | $122,139 | $71,003THIRD COAST SERVICES LLC | +72.0% |
| Oct 8, 2025 | 0459-02-012 | FM 1580 at Mims CreekFreestone · Bryan | 2 of 7 | $2,751,365 | $2,573,940PMCO CONSTRUCTION LLC | +6.9% |
| Oct 8, 2025 | 1073-01-021 | FM 696 from US 290 to Mundine RoadBastrop · Austin | 3 of 9 | $7,066,611 | $6,445,912DEAN WORD COMPANY, LTD. | +9.6% |
| Sep 5, 2025 | 0187-01-047 | BS 36J F: W Commerce St T: US 290 - PedWashington · Bryan | 3 of 6 | $2,796,816 | $2,318,046JFO SERVICES, LLC | +20.7% |
| Sep 4, 2025 | 0639-02-026 | FM 39 F:US 190 T:THE GRIMES CO LINEMadison · Bryan | 2 of 5 | $18,459,645 | $18,290,693KNIFE RIVER CORPORATION - S… | +0.9% |
| Aug 8, 2025 | 0323-01-028 | SH 95 from SL 230 to South of FM 535Bastrop · Austin | 4 of 6 | $21,764,590 | $18,841,535C. E. BARKER, LTD. | +15.5% |
| Aug 7, 2025 | 0540-03-037 | FM 974 at SH 6 FR - TWLT FY 25Brazos · Bryan | 1 of 5 | $2,808,685 | $2,808,685 | Won |
| Jul 2, 2025 | 2134-01-031 | FM 2293 F:FM 46 T:FM 979 - Rehab FY 25Robertson · Bryan | 3 of 7 | $21,187,537 | $18,180,795KNIFE RIVER CORPORATION - S… | +16.5% |
| Jul 1, 2025 | 0166-07-068 | SH 75 at IH 45 Vertical Curve - FY 25Madison · Bryan | 2 of 5 | $894,308 | $820,741CORNERSTONE PAVING AND CONS… | +9.0% |
| Jul 1, 2025 | 0917-29-148 | Holleman Dr. Ped CrosswalkBrazos · Bryan | 3 of 4 | $141,519 | $89,848MB WESTERN INDUSTRIAL CONTR… | +57.5% |
| Jun 5, 2025 | 2399-01-085 | FM 2818 near Welsh - SUPBrazos · Bryan | 1 of 10 | $1,789,919 | $1,789,919 | Won |
| May 2, 2025 | 0114-09-099 | US 290 R-Cuts West Washington - FY 25Washington · Bryan | 2 of 7 | $1,020,481 | $965,907CORNERSTONE PAVING AND CONS… | +5.7% |
| May 1, 2025 | 0049-09-102 | BS 6-R F:N of SH 21. T:FM 158 - InterimBrazos · Bryan | 1 of 4 | $4,454,973 | $4,454,973 | Won |
| Apr 4, 2025 | 0187-03-078 | REHABILITATE ROADWAY 2701Austin · Yoakum | 5 of 7 | $5,072,110 | $4,364,003TEXAS MATERIALS GROUP, INC. | +16.2% |
| Apr 3, 2025 | 0205-05-051 | US 79 F: SH 75 T:FM 1848 - TWLTL FY 25Leon · Bryan | 1 of 6 | $2,870,625 | $2,870,625 | Won |
| Feb 7, 2025 | 0912-00-615 | Districtwide Lighting FM 2234 & FM 518Harris · Houston | 3 of 10 | $1,419,982 | $1,290,192THIRD COAST SERVICES LLC | +10.1% |
| Feb 7, 2025 | 0210-02-029 | US 77 at FM 1712 - Turn Lane FY 24Milam · Bryan | 1 of 7 | $1,382,358 | $1,382,358 | Won |
| Feb 7, 2025 | 0110-03-084 | SH 75, SL 336N to SH 105Montgomery · Houston | 3 of 6 | $3,665,994 | $3,303,124VULCAN MATERIALS ASPHALT AN… | +11.0% |
| Feb 7, 2025 | 0111-08-127 | BS 288B At Kyle RoadBrazoria · Houston | 2 of 4 | $370,729 | $354,848TRAF-TEX, INC. | +4.5% |
| Feb 6, 2025 | 0205-01-046 | US 79 at FM 2549 - Intersection FY 25Robertson · Bryan | 3 of 7 | $939,062 | $897,290CORNERSTONE PAVING AND CONS… | +4.7% |
| Jan 7, 2025 | 1062-03-053 | FM 1485, Old Houston to Kidd Cemetery RdMontgomery · Houston | 4 of 5 | $9,798,851 | $8,172,669VULCAN MATERIALS ASPHALT AN… | +19.9% |
| Nov 7, 2024 | 0204-09-045 | US 79 AT LITTLE BRAZOS RIVER - BRRobertson · Bryan | 1 of 5 | $18,997,916 | $18,997,916 | Won |
| Nov 6, 2024 | 0315-04-087 | SH 105 Navasota - PED FY 25Grimes · Bryan | 2 of 8 | $851,969 | $782,803GARRET SHIELDS INFRASTRUCTU… | +8.8% |
| Aug 2, 2024 | 0185-03-033 | INTERSECTION IMPROVEMENTS WITH TURN LANESMilam · Bryan | 4 of 4 | $3,538,446 | $3,193,317TEXAS MATERIALS GROUP, INC. | +10.8% |
| Aug 1, 2024 | 0117-05-059 | CONSTRUCT TWO-WAY LEFT TURN LANEMadison · Bryan | 1 of 4 | $938,332 | $938,332 | Won |
| Aug 1, 2024 | 0186-05-045 | TRAFFIC SIGNAL IMPROVEMENTSWashington · Bryan | 1 of 4 | $522,513 | $522,513 | Won |
| Jun 6, 2024 | 0212-04-039 | BRIDGE REPLACEMENTGrimes · Bryan | 2 of 6 | $12,700,647 | $12,337,845BIG CREEK CONSTRUCTION, LTD. | +2.9% |
| Jun 5, 2024 | 0338-01-068 | INTERSECTION IMPROVEMENTS W/ RT AND/OR LT TRN LANEGrimes · Bryan | 3 of 6 | $11,938,491 | $10,784,375KNIFE RIVER CORPORATION - S… | +10.7% |
| May 3, 2024 | 0917-12-088 | BRIDGE REPLACEMENTMilam · Bryan | 7 of 10 | $1,342,230 | $974,112C. E. BARKER, LTD. | +37.8% |
| Apr 5, 2024 | 3538-01-060 | INSTALL/UPGRADE DRAINAGE STRUCTURE(S)Montgomery · Houston | 9 of 11 | $12,228,687 | $8,197,532R CONSTRUCTION CIVIL, LLC | +49.2% |
| Apr 5, 2024 | 0578-03-055 | INTERSECTION IMPROVEMENTS W/ TURN LANESWalker · Bryan | 1 of 5 | $1,514,151 | $1,514,151 | Won |
| Feb 2, 2024 | 0213-01-048 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LANEWalker · Bryan | 2 of 8 | $1,057,150 | $1,036,981KNIFE RIVER CORPORATION - S… | +1.9% |
| Feb 2, 2024 | 0540-02-027 | BRIDGE REPLACEMENTRobertson · Bryan | 2 of 9 | $1,864,485 | $1,750,130KNIFE RIVER CORPORATION - S… | +6.5% |
| Feb 2, 2024 | 0675-08-120 | HIGHWAY IMPROVEMENTMontgomery · Houston | 4 of 9 | $3,442,108 | $3,167,866JAMES CONSTRUCTION GROUP, L… | +8.7% |
| Jan 5, 2024 | 0265-03-053 | RESURFACE ROADWAYBastrop · Austin | 4 of 5 | $8,606,538 | $6,520,251LONE STAR PAVING COMPANY | +32.0% |
| Aug 3, 2023 | 1402-03-012 | SURFACING/ROADWAY RESTORATIONMontgomery · Houston | 3 of 7 | $2,047,778 | $2,012,093TEXAS MATERIALS GROUP, INC. | +1.8% |
| Aug 3, 2023 | 0720-01-044 | WIDEN ROAD - ADD SHOULDERSGrimes · Bryan | 1 of 4 | $5,572,269 | $5,572,269 | Won |
| Aug 2, 2023 | 0914-18-120 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREBastrop · Austin | 2 of 7 | $4,901,084 | $4,210,9823LW CIVIL LLC | +16.4% |
| Aug 2, 2023 | 0205-02-070 | WIDEN ROAD - ADD LANESRobertson · Bryan | 1 of 4 | $4,456,784 | $4,456,784 | Won |
| Aug 2, 2023 | 1706-02-008 | SURFACING/ROADWAY RESTORATIONMontgomery · Houston | 2 of 8 | $1,040,361 | $1,006,889TEXAS MATERIALS GROUP, INC. | +3.3% |
| Aug 2, 2023 | 0917-17-081 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREGrimes · Bryan | 2 of 6 | $859,199 | $854,655FUQUA CONSTRUCTION CO., INC. | +0.5% |
| Jun 28, 2023 | 0540-05-051 | REHABILITATE EXISTING ROADWAYBrazos · Bryan | 2 of 5 | $10,869,225 | $9,980,814GLENN FUQUA, INC. | +8.9% |
| Jun 27, 2023 | 1316-01-081 | CONSTRUCT PEDESTRIAN INFRASTRUCTUREBrazos · Bryan | 1 of 9 | $4,034,959 | $4,034,959 | Won |
| Feb 1, 2023 | 1416-03-018 | HOT MIX OVERLAYMontgomery · Houston | 3 of 7 | $4,630,250 | $4,541,532JAMES CONSTRUCTION GROUP, L… | +2.0% |
| Dec 2, 2021 | 0049-09-087 | INSTALL RAISED MEDIANBrazos · Bryan | 1 of 4 | $4,137,993 | $4,137,993 | Won |
| Nov 3, 2021 | 0205-02-067 | INTERSECTION IMPROVEMENTS WITH LEFT TURN LNRobertson · Bryan | 3 of 6 | $875,000 | $734,213KNIFE RIVER CORPORATION - S… | +19.2% |
| Sep 2, 2021 | 2447-01-032 | INTERSECTION IMPROVEMENTWashington · Bryan | 3 of 5 | $628,598 | $576,065CORNERSTONE PAVING AND CONS… | +9.1% |
| Aug 5, 2021 | 0186-06-091 | INSTALL TRAFFIC SIGNALWashington · Bryan | 1 of 2 | $1,649,907 | $1,649,907 | Won |
| Aug 4, 2021 | 0050-03-096 | HAZARD ELIMINATION & SAFETYGrimes · Bryan | 1 of 6 | $18,052,622 | $18,052,622 | Won |
| Aug 4, 2021 | 1316-01-067 | INSTALL RAISED MEDIANBrazos · Bryan | 1 of 4 | $1,423,097 | $1,423,097 | Won |
| Jul 2, 2021 | 0648-03-049 | WIDEN ROAD - ADD LANESBurleson · Bryan | 2 of 8 | $35,916,523 | $34,287,618BIG CREEK CONSTRUCTION, LTD. | +4.8% |
| Jun 3, 2021 | 0540-08-008 | HAZARD ELIMINATION & SAFETYBrazos · Bryan | 2 of 3 | $2,806,675 | $2,611,582KNIFE RIVER CORPORATION - S… | +7.5% |
| Jun 3, 2021 | 6373-97-001 | SPOT BASE REPAIRBrazos · Bryan | 4 of 6 | $952,530 | $654,818BIG CREEK CONSTRUCTION, LTD. | +45.5% |
| Feb 5, 2021 | 2850-01-018 | INTERSECTION IMPROVEMENTS, RT & LT TURN LANESWalker · Bryan | 2 of 10 | $2,194,135 | $2,117,590VULCAN CONSTRUCTION | +3.6% |
| Nov 5, 2020 | 1400-02-025 | SFT- SAFETY IMPROVEMENT PROJECTGrimes · Bryan | 1 of 6 | $6,403,546 | $6,403,546 | Won |
| Oct 2, 2020 | 0540-04-005 | INTRSEC IMPROVEMENTS AT RR CROSSINGBrazos · Bryan | 1 of 5 | $2,432,739 | $2,432,739 | Won |
| Jul 9, 2020 | 0204-06-060 | SIDEWALK, RAMPS, BENCHES & LIGHT'GMilam · Bryan | 4 of 7 | $5,480,961 | $4,509,032BIG CREEK CONSTRUCTION, LTD. | +21.6% |
| Jul 8, 2020 | 3138-01-029 | INSTALL RAISED MEDIANBrazos · Bryan | 1 of 4 | $2,417,982 | $2,417,982 | Won |
| Nov 5, 2019 | 1145-02-022 | REHABILITATE EXISTING ROADWAYLeon · Bryan | 2 of 5 | $10,181,938 | $9,543,192KNIFE RIVER CORPORATION - S… | +6.7% |
| Oct 3, 2019 | 0211-05-019 | CONSTRUCTION OF ADDITIONAL PAVED SURFACE WIDTHLee · Austin | 1 of 6 | $7,577,299 | $7,577,299 | Won |
| Aug 6, 2019 | 0049-12-115 | PEDESTRIAN, SIDEWALKS AND CURB RAMPSBrazos · Bryan | 1 of 8 | $1,105,702 | $1,105,702 | Won |
| Mar 6, 2019 | 0050-01-086 | CONCRETE PAVEMENT REPAIRBrazos · Bryan | 3 of 3 | $7,294,332 | $5,989,655MAIN LANE INDUSTRIES LTD. | +21.8% |
| Jul 11, 2018 | 0050-01-080 | INSTALL RAISED MEDIANBrazos · Bryan | 2 of 5 | $1,157,837 | $1,137,292KNIFE RIVER CORPORATION - S… | +1.8% |
| Apr 4, 2018 | 1400-04-037 | WIDEN TO 4-LANE DIVIDED RURALMontgomery · Houston | 2 of 6 | $18,599,527 | $18,498,791JAMES CONSTRUCTION GROUP, L… | +0.5% |
| Aug 8, 2017 | 0917-29-129 | PEDESTRIAN AND BICYCLE IMPROVEMENTSBrazos · Bryan | 1 of 5 | $1,803,581 | $1,803,581 | Won |
| Nov 3, 2016 | 6305-47-001 | SLOPE REPAIRBrazos · Bryan | 2 of 10 | $1,218,785 | $1,149,333ANGEL BROTHERS HOLDINGS COR… | +6.0% |
| Nov 3, 2016 | 6306-41-001 | HMA MILL AND INLAYBrazos · Bryan | 5 of 5 | $818,831 | $671,410BIG CREEK CONSTRUCTION, LTD. | +22.0% |
Active prime contracts 11
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0265-14-018Let Dec 3, 2025 | FayetteYoakum · BS 71E | HAZARD ELIMINATION & SAFETY | $4,030,857 | 32% | |
| 0833-13-014Let Dec 2, 2025 | BurlesonBryan · FM 2039 | BRIDGE REPLACEMENT | $2,378,174 | 68% | |
| 0315-06-047Let Nov 5, 2025 | WashingtonBryan · SH 105 | BRIDGE REPLACEMENT | $2,898,512 | 15% | |
| 0540-03-037Let Aug 7, 2025 | BrazosBryan · FM 974 | HAZARD ELIMINATION & SAFETY | $2,875,282 | 63% | |
| 2399-01-085Let Jun 5, 2025 | BrazosBryan · FM 2818 | HAZARD ELIMINATION & SAFETY | $1,890,779 | 94% | |
| 0049-09-102Let May 1, 2025 | BrazosBryan · BS 6R | HAZARD ELIMINATION & SAFETY | $4,469,916 | 53% | |
| 0205-05-051Let Apr 3, 2025 | LeonBryan · US 79 | HAZARD ELIMINATION & SAFETY | $3,092,438 | 105% | |
| 0204-09-045Let Nov 7, 2024 | RobertsonBryan · US 79 | BRIDGE REPLACEMENT | $19,115,760 | 89% | |
| 0116-04-111Let Jul 10, 2024 | BrazosBryan · SH 21 | HAZARD ELIMINATION & SAFETY | $7,077,676 | 100% | |
| 1316-01-081Let Jun 27, 2023 | BrazosBryan · FM 1179 | HAZARD ELIMINATION & SAFETY | $4,317,835 | 102% | |
| 0212-03-050Let Jun 2, 2022 | BrazosBryan · FM 158 | MISCELLANEOUS CONSTRUCTION | $17,823,822 | 91% |
Subcontracts on active jobs 6
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0187-03-078Let Apr 4, 2025 | TEXAS MATERIALS GROUP, INC. | AustinYoakum | REHABILITATION OF EXISTING ROAD | 4.47% | $206,715 |
| 0049-12-110Let Mar 5, 2025 | FLUOR HEAVY CIVIL, LLC | BrazosBryan | WIDEN FREEWAY | 1.29% | $8,957,065 |
| 0912-72-559Let Jun 5, 2024 | R CONSTRUCTION CIVIL, LLC | HarrisHouston | BRIDGE REPLACEMENT | 2% | $140,789 |
| 0338-04-060Let Aug 4, 2022 | JAMES CONSTRUCTION GROUP, LLC | MontgomeryHouston | WIDEN NON-FREEWAY | 1.6% | $852,329 |
| 1259-01-044Let Aug 4, 2021 | JAMES CONSTRUCTION GROUP, LLC | MontgomeryHouston | WIDEN NON-FREEWAY | 0.91% | $206,422 |
| 2399-01-074Let Sep 4, 2020 | KNIFE RIVER CORPORATION - SOUTH | BrazosBryan | WIDEN NON-FREEWAY | 3.49% | $1,885,304 |