LARRY YOUNG PAVING, INC.

Texas bid history Sign up free

‹ All contractors

Contact information

Email
mark@larryyoungpaving.com
Phone
(979) 823-4888
Fax
(979) 823-4884
Address
1852 SILVER HILL RD., BRYAN, TX 77807
TxDOT prequalification
Construction qualified
90BidsNov 3, 2016 to Nov 4, 2026
28Wins (low bidder)
31.1%Win rate
$107,533,415Total won

Competitor scorecard

Last 5 years in Texas
27.9%Win rate19 of 68 bids
+5.1%Average bid vs estimate
-2.0%Winning bids vs estimate
+16.2%Over the low bid when they loseAverage field: 7.2 bidders

Bid history

ExcelCSV
Let dateCCSJProjectRankTheir bidLow bidvs low
Nov 4, 2026 0262-01-034 FM 485 - W and E of FM 979 - FY 27Milam · Bryan 2 of 7 $10,182,780 $9,787,627BIG CREEK CONSTRUCTION, LTD. +4.0%
Oct 6, 2026 0590-05-057 FM 486 Downtown Streetscape - TASAMilam · Bryan 6 of 10 $377,702 $257,450YOKO EXCAVATING, LLC +46.7%
Aug 6, 2026 0051-09-128 FM 3005: Kiva Rd to S of 89th StGalveston · Houston 7 of 14 $3,030,198 $2,099,052JASCO +44.4%
Aug 6, 2026 0114-10-102 US 290WB F: FM 1155 T: Waller CL -RER 26Washington · Bryan 5 of 6 $5,034,763 $4,287,440BIG CREEK CONSTRUCTION, LTD. +17.4%
Aug 5, 2026 0186-03-071 SH 36 F: S of SH 21 T: CR 122 -IOI FY 26Burleson · Bryan 4 of 6 $5,538,882 $4,987,865BIG CREEK CONSTRUCTION, LTD. +11.0%
Aug 5, 2026 0204-06-069 US 79 at CR 308 - Signal FY 26Milam · Bryan 1 of 4 $366,495 $366,495 Won
Aug 5, 2026 0917-16-040 CR 244 At Eads CreekLeon · Bryan 6 of 8 $2,797,371 $2,572,458THK CONSTRUCTION LLC +8.7%
Jul 1, 2026 0540-03-039 FM 974 F: FM 2776 T: south - FY 27Brazos · Bryan 3 of 8 $4,285,538 $3,771,592BIG CREEK CONSTRUCTION, LTD. +13.6%
Jun 2, 2026 0315-03-070 SH 90 at FM 244 - Turn Lane FY 26Grimes · Bryan 1 of 7 $1,241,183 $1,241,183 Won
May 7, 2026 0110-01-052 SH 75 at FM 2296 - FY 25Walker · Bryan 2 of 5 $3,123,380 $2,980,129BIG CREEK CONSTRUCTION, LTD. +4.8%
May 6, 2026 0643-05-067 FM 3090/Blackshear St. - TASAGrimes · Bryan 2 of 10 $2,041,635 $1,828,629GARRET SHIELDS INFRASTRUCTU… +11.6%
Apr 8, 2026 0114-10-108 US 290 F: FM 577 T: FM 1155 - FY 26Washington · Bryan 6 of 7 $7,656,043 $6,537,278DURWOOD GREENE CONSTRUCTION… +17.1%
Apr 7, 2026 0917-19-062 CR 830 AT EAST FORK OF MILL CREEK - BRWashington · Bryan 8 of 9 $941,452 $732,054GARRET SHIELDS INFRASTRUCTU… +28.6%
Mar 5, 2026 0917-29-149 William D Fitch at Pebble Creek SignalBrazos · Bryan 1 of 9 $421,790 $421,790 Won
Jan 7, 2026 1986-01-073 FM 1314: N of SH 242Montgomery · Houston 3 of 12 $2,384,656 $2,219,724R CONSTRUCTION CIVIL, LLC +7.4%
Jan 7, 2026 1607-01-056 FM 1764 - I-45 to SH 146Galveston · Houston 11 of 12 $5,083,058 $4,291,676THIRD COAST SERVICES LLC +18.4%
Jan 6, 2026 1259-02-022 FM 1097, SH 75 to Walker C/LMontgomery · Houston 5 of 7 $5,972,417 $4,872,185DURWOOD GREENE CONSTRUCTION… +22.6%
Dec 3, 2025 0265-14-018 BS 71E SIDEWALKS 2709Fayette · Yoakum 1 of 12 $4,027,355 $4,027,355 Won
Dec 2, 2025 0833-13-014 FM 2039 AT PORTER CREEK - BRBurleson · Bryan 1 of 9 $2,315,333 $2,315,333 Won
Nov 12, 2025 6492-11-001 FY27 - Large Guide Sign -11Brazos · Bryan 7 of 10 $219,254 $179,565HAZMAT INTERNATIONAL, INC. +22.1%
Nov 6, 2025 0117-05-063 SH 21 E of IH 45 - TWLT FY 26Madison · Bryan 2 of 8 $2,378,582 $2,014,433BIG CREEK CONSTRUCTION, LTD. +18.1%
Nov 5, 2025 0315-06-047 SH 105 AT JACKSON CREEK - BRWashington · Bryan 1 of 12 $2,813,308 $2,813,308 Won
Oct 9, 2025 2017-01-010 FM 2145 REHABILITATE ROADWAY 2404Fayette · Yoakum 3 of 7 $6,582,737 $5,752,555DEAN WORD COMPANY, LTD. +14.4%
Oct 9, 2025 0917-18-088 Va Robertson County - Back Plates FY 26Robertson · Bryan 8 of 9 $122,139 $71,003THIRD COAST SERVICES LLC +72.0%
Oct 8, 2025 0459-02-012 FM 1580 at Mims CreekFreestone · Bryan 2 of 7 $2,751,365 $2,573,940PMCO CONSTRUCTION LLC +6.9%
Oct 8, 2025 1073-01-021 FM 696 from US 290 to Mundine RoadBastrop · Austin 3 of 9 $7,066,611 $6,445,912DEAN WORD COMPANY, LTD. +9.6%
Sep 5, 2025 0187-01-047 BS 36J F: W Commerce St T: US 290 - PedWashington · Bryan 3 of 6 $2,796,816 $2,318,046JFO SERVICES, LLC +20.7%
Sep 4, 2025 0639-02-026 FM 39 F:US 190 T:THE GRIMES CO LINEMadison · Bryan 2 of 5 $18,459,645 $18,290,693KNIFE RIVER CORPORATION - S… +0.9%
Aug 8, 2025 0323-01-028 SH 95 from SL 230 to South of FM 535Bastrop · Austin 4 of 6 $21,764,590 $18,841,535C. E. BARKER, LTD. +15.5%
Aug 7, 2025 0540-03-037 FM 974 at SH 6 FR - TWLT FY 25Brazos · Bryan 1 of 5 $2,808,685 $2,808,685 Won
Jul 2, 2025 2134-01-031 FM 2293 F:FM 46 T:FM 979 - Rehab FY 25Robertson · Bryan 3 of 7 $21,187,537 $18,180,795KNIFE RIVER CORPORATION - S… +16.5%
Jul 1, 2025 0166-07-068 SH 75 at IH 45 Vertical Curve - FY 25Madison · Bryan 2 of 5 $894,308 $820,741CORNERSTONE PAVING AND CONS… +9.0%
Jul 1, 2025 0917-29-148 Holleman Dr. Ped CrosswalkBrazos · Bryan 3 of 4 $141,519 $89,848MB WESTERN INDUSTRIAL CONTR… +57.5%
Jun 5, 2025 2399-01-085 FM 2818 near Welsh - SUPBrazos · Bryan 1 of 10 $1,789,919 $1,789,919 Won
May 2, 2025 0114-09-099 US 290 R-Cuts West Washington - FY 25Washington · Bryan 2 of 7 $1,020,481 $965,907CORNERSTONE PAVING AND CONS… +5.7%
May 1, 2025 0049-09-102 BS 6-R F:N of SH 21. T:FM 158 - InterimBrazos · Bryan 1 of 4 $4,454,973 $4,454,973 Won
Apr 4, 2025 0187-03-078 REHABILITATE ROADWAY 2701Austin · Yoakum 5 of 7 $5,072,110 $4,364,003TEXAS MATERIALS GROUP, INC. +16.2%
Apr 3, 2025 0205-05-051 US 79 F: SH 75 T:FM 1848 - TWLTL FY 25Leon · Bryan 1 of 6 $2,870,625 $2,870,625 Won
Feb 7, 2025 0912-00-615 Districtwide Lighting FM 2234 & FM 518Harris · Houston 3 of 10 $1,419,982 $1,290,192THIRD COAST SERVICES LLC +10.1%
Feb 7, 2025 0210-02-029 US 77 at FM 1712 - Turn Lane FY 24Milam · Bryan 1 of 7 $1,382,358 $1,382,358 Won
Feb 7, 2025 0110-03-084 SH 75, SL 336N to SH 105Montgomery · Houston 3 of 6 $3,665,994 $3,303,124VULCAN MATERIALS ASPHALT AN… +11.0%
Feb 7, 2025 0111-08-127 BS 288B At Kyle RoadBrazoria · Houston 2 of 4 $370,729 $354,848TRAF-TEX, INC. +4.5%
Feb 6, 2025 0205-01-046 US 79 at FM 2549 - Intersection FY 25Robertson · Bryan 3 of 7 $939,062 $897,290CORNERSTONE PAVING AND CONS… +4.7%
Jan 7, 2025 1062-03-053 FM 1485, Old Houston to Kidd Cemetery RdMontgomery · Houston 4 of 5 $9,798,851 $8,172,669VULCAN MATERIALS ASPHALT AN… +19.9%
Nov 7, 2024 0204-09-045 US 79 AT LITTLE BRAZOS RIVER - BRRobertson · Bryan 1 of 5 $18,997,916 $18,997,916 Won
Nov 6, 2024 0315-04-087 SH 105 Navasota - PED FY 25Grimes · Bryan 2 of 8 $851,969 $782,803GARRET SHIELDS INFRASTRUCTU… +8.8%
Aug 2, 2024 0185-03-033 INTERSECTION IMPROVEMENTS WITH TURN LANESMilam · Bryan 4 of 4 $3,538,446 $3,193,317TEXAS MATERIALS GROUP, INC. +10.8%
Aug 1, 2024 0117-05-059 CONSTRUCT TWO-WAY LEFT TURN LANEMadison · Bryan 1 of 4 $938,332 $938,332 Won
Aug 1, 2024 0186-05-045 TRAFFIC SIGNAL IMPROVEMENTSWashington · Bryan 1 of 4 $522,513 $522,513 Won
Jun 6, 2024 0212-04-039 BRIDGE REPLACEMENTGrimes · Bryan 2 of 6 $12,700,647 $12,337,845BIG CREEK CONSTRUCTION, LTD. +2.9%
Jun 5, 2024 0338-01-068 INTERSECTION IMPROVEMENTS W/ RT AND/OR LT TRN LANEGrimes · Bryan 3 of 6 $11,938,491 $10,784,375KNIFE RIVER CORPORATION - S… +10.7%
May 3, 2024 0917-12-088 BRIDGE REPLACEMENTMilam · Bryan 7 of 10 $1,342,230 $974,112C. E. BARKER, LTD. +37.8%
Apr 5, 2024 3538-01-060 INSTALL/UPGRADE DRAINAGE STRUCTURE(S)Montgomery · Houston 9 of 11 $12,228,687 $8,197,532R CONSTRUCTION CIVIL, LLC +49.2%
Apr 5, 2024 0578-03-055 INTERSECTION IMPROVEMENTS W/ TURN LANESWalker · Bryan 1 of 5 $1,514,151 $1,514,151 Won
Feb 2, 2024 0213-01-048 INTERSECTION IMPROVEMENTS WITH LEFT TURN LANEWalker · Bryan 2 of 8 $1,057,150 $1,036,981KNIFE RIVER CORPORATION - S… +1.9%
Feb 2, 2024 0540-02-027 BRIDGE REPLACEMENTRobertson · Bryan 2 of 9 $1,864,485 $1,750,130KNIFE RIVER CORPORATION - S… +6.5%
Feb 2, 2024 0675-08-120 HIGHWAY IMPROVEMENTMontgomery · Houston 4 of 9 $3,442,108 $3,167,866JAMES CONSTRUCTION GROUP, L… +8.7%
Jan 5, 2024 0265-03-053 RESURFACE ROADWAYBastrop · Austin 4 of 5 $8,606,538 $6,520,251LONE STAR PAVING COMPANY +32.0%
Aug 3, 2023 1402-03-012 SURFACING/ROADWAY RESTORATIONMontgomery · Houston 3 of 7 $2,047,778 $2,012,093TEXAS MATERIALS GROUP, INC. +1.8%
Aug 3, 2023 0720-01-044 WIDEN ROAD - ADD SHOULDERSGrimes · Bryan 1 of 4 $5,572,269 $5,572,269 Won
Aug 2, 2023 0914-18-120 CONSTRUCT PEDESTRIAN INFRASTRUCTUREBastrop · Austin 2 of 7 $4,901,084 $4,210,9823LW CIVIL LLC +16.4%
Aug 2, 2023 0205-02-070 WIDEN ROAD - ADD LANESRobertson · Bryan 1 of 4 $4,456,784 $4,456,784 Won
Aug 2, 2023 1706-02-008 SURFACING/ROADWAY RESTORATIONMontgomery · Houston 2 of 8 $1,040,361 $1,006,889TEXAS MATERIALS GROUP, INC. +3.3%
Aug 2, 2023 0917-17-081 CONSTRUCT PEDESTRIAN INFRASTRUCTUREGrimes · Bryan 2 of 6 $859,199 $854,655FUQUA CONSTRUCTION CO., INC. +0.5%
Jun 28, 2023 0540-05-051 REHABILITATE EXISTING ROADWAYBrazos · Bryan 2 of 5 $10,869,225 $9,980,814GLENN FUQUA, INC. +8.9%
Jun 27, 2023 1316-01-081 CONSTRUCT PEDESTRIAN INFRASTRUCTUREBrazos · Bryan 1 of 9 $4,034,959 $4,034,959 Won
Feb 1, 2023 1416-03-018 HOT MIX OVERLAYMontgomery · Houston 3 of 7 $4,630,250 $4,541,532JAMES CONSTRUCTION GROUP, L… +2.0%
Dec 2, 2021 0049-09-087 INSTALL RAISED MEDIANBrazos · Bryan 1 of 4 $4,137,993 $4,137,993 Won
Nov 3, 2021 0205-02-067 INTERSECTION IMPROVEMENTS WITH LEFT TURN LNRobertson · Bryan 3 of 6 $875,000 $734,213KNIFE RIVER CORPORATION - S… +19.2%
Sep 2, 2021 2447-01-032 INTERSECTION IMPROVEMENTWashington · Bryan 3 of 5 $628,598 $576,065CORNERSTONE PAVING AND CONS… +9.1%
Aug 5, 2021 0186-06-091 INSTALL TRAFFIC SIGNALWashington · Bryan 1 of 2 $1,649,907 $1,649,907 Won
Aug 4, 2021 0050-03-096 HAZARD ELIMINATION & SAFETYGrimes · Bryan 1 of 6 $18,052,622 $18,052,622 Won
Aug 4, 2021 1316-01-067 INSTALL RAISED MEDIANBrazos · Bryan 1 of 4 $1,423,097 $1,423,097 Won
Jul 2, 2021 0648-03-049 WIDEN ROAD - ADD LANESBurleson · Bryan 2 of 8 $35,916,523 $34,287,618BIG CREEK CONSTRUCTION, LTD. +4.8%
Jun 3, 2021 0540-08-008 HAZARD ELIMINATION & SAFETYBrazos · Bryan 2 of 3 $2,806,675 $2,611,582KNIFE RIVER CORPORATION - S… +7.5%
Jun 3, 2021 6373-97-001 SPOT BASE REPAIRBrazos · Bryan 4 of 6 $952,530 $654,818BIG CREEK CONSTRUCTION, LTD. +45.5%
Feb 5, 2021 2850-01-018 INTERSECTION IMPROVEMENTS, RT & LT TURN LANESWalker · Bryan 2 of 10 $2,194,135 $2,117,590VULCAN CONSTRUCTION +3.6%
Nov 5, 2020 1400-02-025 SFT- SAFETY IMPROVEMENT PROJECTGrimes · Bryan 1 of 6 $6,403,546 $6,403,546 Won
Oct 2, 2020 0540-04-005 INTRSEC IMPROVEMENTS AT RR CROSSINGBrazos · Bryan 1 of 5 $2,432,739 $2,432,739 Won
Jul 9, 2020 0204-06-060 SIDEWALK, RAMPS, BENCHES & LIGHT'GMilam · Bryan 4 of 7 $5,480,961 $4,509,032BIG CREEK CONSTRUCTION, LTD. +21.6%
Jul 8, 2020 3138-01-029 INSTALL RAISED MEDIANBrazos · Bryan 1 of 4 $2,417,982 $2,417,982 Won
Nov 5, 2019 1145-02-022 REHABILITATE EXISTING ROADWAYLeon · Bryan 2 of 5 $10,181,938 $9,543,192KNIFE RIVER CORPORATION - S… +6.7%
Oct 3, 2019 0211-05-019 CONSTRUCTION OF ADDITIONAL PAVED SURFACE WIDTHLee · Austin 1 of 6 $7,577,299 $7,577,299 Won
Aug 6, 2019 0049-12-115 PEDESTRIAN, SIDEWALKS AND CURB RAMPSBrazos · Bryan 1 of 8 $1,105,702 $1,105,702 Won
Mar 6, 2019 0050-01-086 CONCRETE PAVEMENT REPAIRBrazos · Bryan 3 of 3 $7,294,332 $5,989,655MAIN LANE INDUSTRIES LTD. +21.8%
Jul 11, 2018 0050-01-080 INSTALL RAISED MEDIANBrazos · Bryan 2 of 5 $1,157,837 $1,137,292KNIFE RIVER CORPORATION - S… +1.8%
Apr 4, 2018 1400-04-037 WIDEN TO 4-LANE DIVIDED RURALMontgomery · Houston 2 of 6 $18,599,527 $18,498,791JAMES CONSTRUCTION GROUP, L… +0.5%
Aug 8, 2017 0917-29-129 PEDESTRIAN AND BICYCLE IMPROVEMENTSBrazos · Bryan 1 of 5 $1,803,581 $1,803,581 Won
Nov 3, 2016 6305-47-001 SLOPE REPAIRBrazos · Bryan 2 of 10 $1,218,785 $1,149,333ANGEL BROTHERS HOLDINGS COR… +6.0%
Nov 3, 2016 6306-41-001 HMA MILL AND INLAYBrazos · Bryan 5 of 5 $818,831 $671,410BIG CREEK CONSTRUCTION, LTD. +22.0%

Active prime contracts 11

CCSJWhereWorkContractCompleteReport
0265-14-018Let Dec 3, 2025 FayetteYoakum · BS 71E HAZARD ELIMINATION & SAFETY$4,030,857 32% PDF
0833-13-014Let Dec 2, 2025 BurlesonBryan · FM 2039 BRIDGE REPLACEMENT$2,378,174 68% PDF
0315-06-047Let Nov 5, 2025 WashingtonBryan · SH 105 BRIDGE REPLACEMENT$2,898,512 15% PDF
0540-03-037Let Aug 7, 2025 BrazosBryan · FM 974 HAZARD ELIMINATION & SAFETY$2,875,282 63% PDF
2399-01-085Let Jun 5, 2025 BrazosBryan · FM 2818 HAZARD ELIMINATION & SAFETY$1,890,779 94% PDF
0049-09-102Let May 1, 2025 BrazosBryan · BS 6R HAZARD ELIMINATION & SAFETY$4,469,916 53% PDF
0205-05-051Let Apr 3, 2025 LeonBryan · US 79 HAZARD ELIMINATION & SAFETY$3,092,438 105% PDF
0204-09-045Let Nov 7, 2024 RobertsonBryan · US 79 BRIDGE REPLACEMENT$19,115,760 89% PDF
0116-04-111Let Jul 10, 2024 BrazosBryan · SH 21 HAZARD ELIMINATION & SAFETY$7,077,676 100% PDF
1316-01-081Let Jun 27, 2023 BrazosBryan · FM 1179 HAZARD ELIMINATION & SAFETY$4,317,835 102% PDF
0212-03-050Let Jun 2, 2022 BrazosBryan · FM 158 MISCELLANEOUS CONSTRUCTION$17,823,822 91% PDF

Subcontracts on active jobs 6

CCSJPrime contractorWhereWorkShareValue (est.)
0187-03-078Let Apr 4, 2025 TEXAS MATERIALS GROUP, INC. AustinYoakumREHABILITATION OF EXISTING ROAD 4.47%$206,715
0049-12-110Let Mar 5, 2025 FLUOR HEAVY CIVIL, LLC BrazosBryanWIDEN FREEWAY 1.29%$8,957,065
0912-72-559Let Jun 5, 2024 R CONSTRUCTION CIVIL, LLC HarrisHoustonBRIDGE REPLACEMENT 2%$140,789
0338-04-060Let Aug 4, 2022 JAMES CONSTRUCTION GROUP, LLC MontgomeryHoustonWIDEN NON-FREEWAY 1.6%$852,329
1259-01-044Let Aug 4, 2021 JAMES CONSTRUCTION GROUP, LLC MontgomeryHoustonWIDEN NON-FREEWAY 0.91%$206,422
2399-01-074Let Sep 4, 2020 KNIFE RIVER CORPORATION - SOUTH BrazosBryanWIDEN NON-FREEWAY 3.49%$1,885,304