| 1 | 100-6002 |
PREPARING ROW | 4.05 | STA |
$6,500.00 |
$9,962.43 |
$1,068.87 |
$1,000.00 |
$1,100.00 |
$4,500.00 |
$8,400.00 |
| 2 | 100-6004 |
PREPARING ROW(TREE)(12" TO 24" DIA) | 3 | EA |
$2,000.00 |
$951.12 |
$926.35 |
$1,000.00 |
$1,925.00 |
$2,000.00 |
$3,000.00 |
| 3 | 100-6011 |
PREPARING ROW(TREE)(24" TO 36" DIA.) | 2 | EA |
$3,500.00 |
$2,280.08 |
$1,710.19 |
$2,500.00 |
$3,080.00 |
$10,000.00 |
$5,000.00 |
| 4 | 104-6015 |
REMOVING CONC (SIDEWALKS) | 218 | SY |
$12.00 |
$14.99 |
$25.63 |
$40.00 |
$28.45 |
$46.50 |
$40.00 |
| 5 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 209 | SY |
$16.00 |
$19.24 |
$25.62 |
$40.00 |
$37.09 |
$46.50 |
$40.00 |
| 6 | 105-6014 |
REMOVING STAB BASE & ASPH PAV (7"-12") | 500 | SY |
$16.00 |
$6.38 |
$23.94 |
$40.00 |
$31.01 |
$24.00 |
$33.00 |
| 7 | 110-6001 |
EXCAVATION (ROADWAY) | 25 | CY |
$25.00 |
$12.01 |
$80.15 |
$40.00 |
$31.01 |
$50.00 |
$100.00 |
| 8 | 132-6002 |
EMBANKMENT (FINAL)(DENS CONT)(TY A) | 387 | CY |
$18.50 |
$16.28 |
$81.87 |
$40.00 |
$120.56 |
$30.00 |
$84.00 |
| 9 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 1,473 | SY |
$3.50 |
$1.60 |
$8.54 |
$30.00 |
$8.42 |
$9.65 |
$10.00 |
| 10 | 162-6002 |
BLOCK SODDING | 1,473 | SY |
$5.50 |
$5.00 |
$8.34 |
$3.00 |
$6.60 |
$6.50 |
$6.00 |
| 11 | 168-6001 |
VEGETATIVE WATERING | 44.2 | MG |
$25.00 |
$14.57 |
$35.68 |
$1.00 |
$1.10 |
$115.00 |
$36.00 |
| 12 | 351-6039 |
FLEX PAVEMENT STRUCTURE REPAIR (8"-12") | 61 | SY |
$85.00 |
$119.00 |
$270.18 |
$200.00 |
$126.50 |
$236.00 |
$190.00 |
| 13 | 400-6005 |
CEM STABIL BKFL | 17 | CY |
$75.00 |
$111.23 |
$319.90 |
$200.00 |
$330.00 |
$338.00 |
$300.00 |
| 14 | 416-6001 |
DRILL SHAFT (18 IN) | 60 | LF |
$79.00 |
$168.94 |
$303.32 |
$250.00 |
$440.00 |
$370.00 |
$430.00 |
| 15 | 420-6013 |
CL C CONC (ABUT) | 12.44 | CY |
$1,200.00 |
$1,572.40 |
$1,761.73 |
$1,200.00 |
$4,235.00 |
$2,000.00 |
$3,000.00 |
| 16 | 423-6004 |
RETAINING WALL (CONC BLOCK) | 1,665 | SF |
$60.00 |
$66.01 |
$68.86 |
$60.00 |
$60.50 |
$112.00 |
$150.00 |
| 17 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 162 | CY |
$150.00 |
$210.29 |
$213.41 |
$200.00 |
$220.00 |
$180.00 |
$315.00 |
| 18 | 450-6051 |
RAIL (HANDRAIL)(TY E) | 57 | LF |
$200.00 |
$198.18 |
$136.82 |
$160.00 |
$280.50 |
$262.00 |
$200.00 |
| 19 | 465-6005 |
JCTBOX(COMPL)(PJB)(3FTX3FT) | 2 | EA |
$4,000.00 |
$7,121.62 |
$6,011.01 |
$10,000.00 |
$9,350.00 |
$5,000.00 |
$7,000.00 |
| 20 | 479-6001 |
ADJUSTING MANHOLES | 1 | EA |
$1,200.00 |
$1,089.80 |
$544.97 |
$800.00 |
$487.92 |
$3,300.00 |
$1,400.00 |
| 21 | 496-6099 |
REMOVE STR (RAIL) | 30 | LF |
$30.00 |
$37.81 |
$25.29 |
$50.00 |
$27.50 |
$50.00 |
$40.00 |
| 22 | 500-6001 |
MOBILIZATION | 1 | LS |
$85,000.00 |
$77,695.80 |
$85,201.89 |
$81,000.00 |
$62,851.26 |
$125,000.00 |
$100,000.00 |
| 23 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$3,000.00 |
$12,374.28 |
$1,623.14 |
$8,500.00 |
$4,950.00 |
$5,000.00 |
$7,000.00 |
| 24 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 496 | LF |
$7.50 |
$3.92 |
$7.13 |
$1.00 |
$5.50 |
$5.60 |
$5.00 |
| 25 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 493 | LF |
$2.50 |
$0.9660 |
$2.14 |
$1.00 |
$1.10 |
$1.67 |
$1.50 |
| 26 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,289 | LF |
$5.00 |
$6.66 |
$6.41 |
$1.00 |
$11.00 |
$5.00 |
$4.50 |
| 27 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,289 | LF |
$1.25 |
$1.68 |
$1.43 |
$1.00 |
$1.10 |
$1.15 |
$1.00 |
| 28 | 530-6004 |
DRIVEWAYS (CONC) | 125 | SY |
$75.00 |
$115.84 |
$139.17 |
$120.00 |
$148.00 |
$156.00 |
$130.00 |
| 29 | 530-6017 |
DRIVEWAYS (CONC) (HES) | 594 | SY |
$95.00 |
$110.24 |
$139.82 |
$180.00 |
$154.72 |
$167.00 |
$130.00 |
| 30 | 531-6003 |
CONC SIDEWALKS (6") | 1,365 | SY |
$72.00 |
$97.90 |
$94.65 |
$110.00 |
$148.00 |
$122.00 |
$125.00 |
| 31 | 531-6004 |
CURB RAMPS (TY 1) | 2 | EA |
$2,000.00 |
$2,695.84 |
$2,583.35 |
$2,500.00 |
$2,790.00 |
$3,000.00 |
$2,900.00 |
| 32 | 531-6010 |
CURB RAMPS (TY 7) | 8 | EA |
$2,000.00 |
$2,792.87 |
$2,524.56 |
$2,500.00 |
$2,790.00 |
$3,000.00 |
$2,600.00 |
| 33 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$750.00 |
$881.26 |
$961.99 |
$800.00 |
$275.00 |
$800.00 |
$810.00 |
| 34 | 644-6071 |
RELOCATE SM RD SN SUP&AM TY TWT | 3 | EA |
$475.00 |
$548.84 |
$705.45 |
$300.00 |
$715.00 |
$590.00 |
$720.00 |
| 35 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 87 | LF |
$30.00 |
$18.68 |
$64.13 |
$30.00 |
$44.00 |
$26.50 |
$29.00 |
| 36 | 4122-6004 |
THERMO PIPE(18")(HDPE)(TY S)(CSB) | 55 | LF |
$60.00 |
$94.26 |
$185.48 |
$200.00 |
$60.50 |
$90.00 |
$120.00 |
| 37 | 4196-6007 |
PED STL TRUSS BRG SPAN (60 FT) | 1 | EA |
$160,000.00 |
$109,480.00 |
$135,406.72 |
$120,000.00 |
$137,500.00 |
$128,720.00 |
$110,000.00 |
| 38 | 6185-6005 |
TMA (MOBILE OPERATION) | 20 | DAY |
$350.00 |
$280.00 |
$425.12 |
$300.00 |
$1.10 |
$250.00 |
$300.00 |