Contact information
- estimating@ibctx.com
- Phone
- (940) 279-4200
- Fax
- (940) 279-4204
- Address
- 507 MAIN STREET SUITE B, LAKE DALLAS, TX 75065
- TxDOT prequalification
- Construction qualified
115BidsMar 10, 2020 to Nov 12, 2026
17Wins (low bidder)
14.8%Win rate
$36,798,089Total won
Competitor scorecard
Last 5 years in Texas15.0%Win rate12 of 80 bids
+21.6%Average bid vs estimate
-0.9%Winning bids vs estimate
+43.6%Over the low bid when they loseAverage field: 6.1 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| GARRET SHIELDS INFRASTRUCTURE | 33 | 7 | 26 | 21% |
| GIBSON & ASSOCIATES, INC. | 27 | 14 | 13 | 52% |
| RAGLE CONSTRUCTION, INC. | 20 | 14 | 6 | 70% |
| BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC | 18 | 13 | 5 | 72% |
| FNH CONSTRUCTION, LLC | 18 | 15 | 3 | 83% |
| SHALOM SERVICES CORPORATION | 14 | 3 | 11 | 21% |
| ED BELL CONSTRUCTION COMPANY | 13 | 8 | 5 | 62% |
| STRUCTURAL INTEGRITY GROUP LLC | 13 | 8 | 5 | 62% |
| ROY JORGENSEN ASSOCIATES, INC. | 13 | 7 | 6 | 54% |
| ICOS MANAGEMENT, LLC | 10 | 3 | 7 | 30% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 12, 2026 | 6506-91-001 | Repair/Replace CTB 1226Navarro · Dallas | 4 of 6 | $448,900 | $252,894FIREMAN EXCAVATING, INC. | +77.5% |
| Oct 14, 2026 | 6485-46-001 | BPM Denton Underseal FY 27Denton · Dallas | 5 of 6 | $135,565 | $83,076GARRET SHIELDS INFRASTRUCTU… | +63.2% |
| Oct 14, 2026 | 6503-16-001 | Repair/Replace Conc Barrier Denton FY 27Denton · Dallas | 2 of 3 | $199,750 | $166,500GARRET SHIELDS INFRASTRUCTU… | +20.0% |
| Aug 12, 2026 | 6497-54-001 | BPM Misc Concrete RepairDenton · Dallas | 7 of 8 | $302,000 | $168,250ROAD DOCTORS LLC | +79.5% |
| Aug 6, 2026 | 0081-01-053 | SH 121: SH 121 WB@ IH 35W SBTarrant · Fort Worth | 2 of 2 | $4,002,559 | $2,868,397RAGLE CONSTRUCTION, INC. | +39.5% |
| Aug 5, 2026 | 0014-03-103 | IH 35W; N of Woodbine Dr to S of CR 530BJohnson · Fort Worth | 2 of 8 | $2,932,360 | $2,800,124FOUTSCO PAVING COMPANY, LLC | +4.7% |
| Jun 3, 2026 | 0918-46-334 | Frankford Rd WB AT Furneaux CreekDenton · Dallas | 4 of 5 | $2,876,413 | $2,342,967TUCAN CONTRACTING, LLC | +22.8% |
| Jun 2, 2026 | 2266-02-168 | SH 360 NBFR: At AVE JTarrant · Fort Worth | 1 of 7 | $1,177,759 | $1,177,759 | Won |
| Apr 16, 2026 | 6481-24-001 | BPM Grayson FY26 #2Grayson · Paris | 4 of 7 | $576,523 | $418,851SCR CIVIL CONSTRUCTION, LLC | +37.6% |
| Apr 7, 2026 | 0009-11-278 | IH 30 at Hunnicut Rd in Dallas CountyDallas · Dallas | 7 of 12 | $480,540 | $319,026ROAD DOCTORS LLC | +50.6% |
| Mar 11, 2026 | 6495-44-001 | Bridge Preventative Maintenance 09 0326Ellis · Dallas | 10 of 12 | $614,875 | $369,500GARRET SHIELDS INFRASTRUCTU… | +66.4% |
| Mar 4, 2026 | 0904-02-050 | N HUGHES ST @ BNSF RR OFF-SYSTEM BRIDGEPotter · Amarillo | 2 of 6 | $6,120,788 | $4,519,471ALTUS CONSTRUCTION LLC | +35.4% |
| Feb 5, 2026 | 0918-18-142 | NW CR 4340 at Frost BranchNavarro · Dallas | 15 of 15 | $2,206,176 | $1,223,665TUCAN CONTRACTING, LLC | +80.3% |
| Jan 6, 2026 | 0014-16-288 | IH 35W: Luella to AltamesaTarrant · Fort Worth | 5 of 9 | $4,993,594 | $3,872,524O. TREVINO CONSTRUCTION, LLC | +28.9% |
| Dec 10, 2025 | 6488-43-001 | Repair/Replace CTB 1225Navarro · Dallas | 7 of 9 | $298,850 | $124,287FIREMAN EXCAVATING, INC. | +140.5% |
| Dec 10, 2025 | 6489-37-001 | R/R Concrete Barrier 07 12.25Collin · Dallas | 3 of 7 | $210,680 | $89,809FIREMAN EXCAVATING, INC. | +134.6% |
| Dec 2, 2025 | 0918-24-285 | W Parker Road at Pittman CreekCollin · Dallas | 6 of 8 | $2,641,480 | $1,814,251PALMER HALL CONSTRUCTION | +45.6% |
| Nov 12, 2025 | 6489-23-001 | Repair/Replace Concrete Barrier 09 1125Ellis · Dallas | 3 of 7 | $562,300 | $408,528BK FIELD OPERATIONS LLC | +37.6% |
| Oct 15, 2025 | 6489-96-001 | BRIDGE REPAIR 02 1025Dallas · Dallas | 4 of 5 | $610,479 | $438,264BK FIELD OPERATIONS LLC | +39.3% |
| Oct 8, 2025 | 6486-40-001 | BPM - US175 @ Prairie Creek 03 1025Dallas · Dallas | 6 of 15 | $1,474,425 | $994,560JACKSON EXCAVATION, LLC | +48.2% |
| Sep 18, 2025 | 6477-36-001 | FY25 BRIDGE BEAM REPAIR, PARKER COUNTYParker · Fort Worth | 5 of 5 | $444,738 | $142,050GARRET SHIELDS INFRASTRUCTU… | +213.1% |
| Sep 4, 2025 | 0918-46-300 | TRINITY ROAD AT COOPER CREEK IN CITY OFDenton · Dallas | 5 of 8 | $1,783,810 | $1,636,169SKYLINE BRIDGE LLC | +9.0% |
| Aug 13, 2025 | 6482-13-001 | BPM FM1393 0825Navarro · Dallas | 5 of 9 | $471,400 | $335,539SHALOM SERVICES CORPORATION | +40.5% |
| Aug 13, 2025 | 6483-07-001 | Misc. Concrete Repair KRAO FY'25Kaufman · Dallas | 2 of 5 | $330,600 | $318,290JACKSON EXCAVATION, LLC | +3.9% |
| Jul 1, 2025 | 0918-22-159 | CR OLD ALMA ROAD AT DRAWEllis · Dallas | 9 of 13 | $3,530,862 | $3,124,045STX CIVIL | +13.0% |
| Jul 1, 2025 | 0903-15-106 | CR 258/SIGN CR 341 at DrawCooke · Wichita Falls | 7 of 8 | $3,237,266 | $2,437,821THK CONSTRUCTION LLC | +32.8% |
| May 6, 2025 | 6479-82-001 | FY25 - Freestone IH 45 BPM - 05Freestone · Bryan | 12 of 12 | $769,052 | $422,313BK FIELD OPERATIONS LLC | +82.1% |
| May 2, 2025 | 0918-47-234 | CS FROM BELT LINE ROAD AT GOFF BRANCH TODallas · Dallas | 3 of 6 | $8,962,082 | $8,168,666HIGHWAY 19 CONSTRUCTION LLC | +9.7% |
| Mar 5, 2025 | 0442-02-161 | IH 35E AT BEAR CREEK ROADDallas · Dallas | 1 of 4 | $16,449,139 | $16,449,139 | Won |
| Jan 8, 2025 | 2208-01-071 | SS 303; SP 303/RUSH CRK RELIEFTarrant · Fort Worth | 1 of 7 | $7,221,685 | $7,221,685 | Won |
| Jan 7, 2025 | 0283-03-024 | SH 79 Str 03-005-0283-03-005 Repl Culv MArcher · Wichita Falls | 3 of 6 | $3,812,320 | $3,345,238SKYLINE BRIDGE LLC | +14.0% |
| Dec 4, 2024 | 0095-03-110 | US 80 at Buffalo Creek Relief to FM 548Kaufman · Dallas | 2 of 12 | $3,518,597 | $3,495,000ED BELL CONSTRUCTION COMPANY | +0.7% |
| Dec 3, 2024 | 0081-01-053 | SH 121: SH 121 WB@ IH 35W SBTarrant · Fort Worth | 2 of 5 | $2,674,732 | $2,584,708BUILT RIGHT CONSTRUCTION OF… | +3.5% |
| Dec 2, 2024 | 6477-56-001 | EMC IH635 @ MacAuthur 05 1224Dallas · Dallas | 1 of 1 | $750,740 | $750,740 | Won |
| Aug 15, 2024 | 6467-75-001 | BRIDGE PREVENTATIVE MAINTENANCEGrayson · Paris | 4 of 4 | $337,438 | $237,915ROAD DOCTORS LLC | +41.8% |
| Aug 7, 2024 | 6462-80-001 | REPAIR/REPLACE CONCRETE BARRIERDenton · Dallas | 1 of 4 | $256,900 | $256,900 | Won |
| Aug 1, 2024 | 0009-02-074 | BICYCLE AND PEDESTRIAN IMPROVEMENTSDallas · Dallas | 1 of 7 | $861,720 | $861,720 | Won |
| Jun 6, 2024 | 0902-90-019 | REHABILITATE BRIDGETarrant · Fort Worth | 2 of 2 | $4,999,315 | $3,188,000RAGLE CONSTRUCTION, INC. | +56.8% |
| May 8, 2024 | 6461-60-001 | MISCELLANEOUS CONCRETE REPAIRKaufman · Dallas | 6 of 6 | $322,950 | $237,950GARRET SHIELDS INFRASTRUCTU… | +35.7% |
| Mar 12, 2024 | 6460-69-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 4 of 4 | $316,075 | $244,970RHINO EQUITY, LLC | +29.0% |
| Mar 5, 2024 | 6460-70-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 5 of 8 | $369,010 | $260,661ICOS MANAGEMENT, LLC | +41.6% |
| Feb 23, 2024 | 6388-99-001 | BRIDGE PREVENTATIVE MAINTENANCEWise · Fort Worth | 5 of 5 | $269,652 | $136,896SCOUT 5 CONSTRUCTION LLC | +97.0% |
| Feb 23, 2024 | 6451-69-001 | BRIDGE JOINT REPAIRWise · Fort Worth | 3 of 3 | $276,725 | $162,075STRUCTURAL INTEGRITY GROUP … | +70.7% |
| Jan 5, 2024 | 0092-14-108 | BRIDGE MAINTENANCEDallas · Dallas | 3 of 6 | $3,442,616 | $3,175,651BECK-REIT & SONS, LTD. | +8.4% |
| Dec 12, 2023 | 6449-87-001 | MISCELLANEOUS CONCRETE REPAIRCollin · Dallas | 2 of 3 | $164,850 | $144,280GARRET SHIELDS INFRASTRUCTU… | +14.3% |
| Dec 6, 2023 | 6450-97-001 | REPAIR/REPLACE CONCRETE BARRIERCollin · Dallas | 2 of 4 | $390,050 | $377,800GARRET SHIELDS INFRASTRUCTU… | +3.2% |
| Dec 5, 2023 | 6420-31-001 | BRIDGE PREVENTATIVE MAINTENANCEDenton · Dallas | 5 of 5 | $997,760 | $700,820O. TREVINO CONSTRUCTION, LLC | +42.4% |
| Nov 1, 2023 | 6444-26-001 | BRIDGE SCOUR REPAIRDallas · Dallas | 7 of 11 | $910,290 | $668,959SHALOM SERVICES CORPORATION | +36.1% |
| Oct 24, 2023 | 6446-98-001 | BRIDGE SCOUR REPAIRDenton · Dallas | 4 of 4 | $270,200 | $143,300GARRET SHIELDS INFRASTRUCTU… | +88.6% |
| Jun 27, 2023 | 0008-14-124 | BRIDGE MAINTENANCETarrant · Fort Worth | 1 of 4 | $1,932,278 | $1,932,278 | Won |
| Jun 27, 2023 | 6435-74-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 4 of 7 | $962,435 | $757,170SJ&J CONSTRUCTION, LLC | +27.1% |
| Jun 27, 2023 | 6437-31-001 | REPAIR/REPLACE CONCRETE BARRIEREllis · Dallas | 1 of 3 | $451,100 | $451,100 | Won |
| May 4, 2023 | 0008-13-249 | REHABILITATE BRIDGETarrant · Fort Worth | 2 of 2 | $5,376,939 | $4,830,946RAGLE CONSTRUCTION, INC. | +11.3% |
| Mar 14, 2023 | 6405-16-001 | MISCELLANEOUS CONCRETE REPAIRDenton · Dallas | 4 of 4 | $325,610 | $212,810GARRET SHIELDS INFRASTRUCTU… | +53.0% |
| Mar 7, 2023 | 6426-99-001 | REPAIR/REPLACE CONCRETE BARRIERDallas · Dallas | 3 of 3 | $1,194,500 | $712,950GIBSON & ASSOCIATES, INC. | +67.5% |
| Feb 1, 2023 | 0442-02-169 | BRIDGE MAINTENANCEDallas · Dallas | 1 of 3 | $2,531,499 | $2,531,499 | Won |
| Feb 1, 2023 | 0422-03-084 | DRAINAGE IMPROVEMENTSJohnson · Fort Worth | 9 of 9 | $953,720 | $524,587WESSON CONSTRUCTION SERVICE… | +81.8% |
| Jan 6, 2023 | 0902-90-125 | BRIDGE REPLACEMENTTarrant · Fort Worth | 2 of 6 | $3,918,306 | $3,861,247INDUS ROAD & BRIDGE, INC. | +1.5% |
| Jan 6, 2023 | 6422-93-001 | REPAIR/REPLACE CONCRETE BARRIERDallas · Dallas | 4 of 4 | $1,660,750 | $1,082,175GIBSON & ASSOCIATES, INC. | +53.5% |
| Jan 5, 2023 | 0092-03-057 | REPAIR ROADWAYEllis · Dallas | 4 of 5 | $3,242,219 | $2,668,749GIBSON & ASSOCIATES, INC. | +21.5% |
| Dec 7, 2022 | 6415-26-001 | MISCELLANEOUS CONCRETE REPAIRCollin · Dallas | 1 of 4 | $143,800 | $143,800 | Won |
| Dec 1, 2022 | 6416-84-001 | REPAIR/REPLACE CONCRETE BARRIERCollin · Dallas | 1 of 6 | $399,000 | $399,000 | Won |
| Nov 3, 2022 | 0902-00-337 | REHABILITATE BRIDGETarrant · Fort Worth | 6 of 6 | $1,791,701 | $996,9953LW CIVIL LLC | +79.7% |
| Nov 3, 2022 | 6409-53-001 | REPAIR/REPLACE CONCRETE BARRIERNavarro · Dallas | 1 of 7 | $305,600 | $305,600 | Won |
| Nov 2, 2022 | 0094-02-145 | EMBANKMENT STABILIZATIONTarrant · Fort Worth | 2 of 4 | $877,712 | $857,399RAGLE CONSTRUCTION, INC. | +2.4% |
| May 4, 2022 | 6396-79-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 3 of 6 | $516,243 | $435,647TALBRAN ENTERPRISES LLC | +18.5% |
| Apr 6, 2022 | 6393-61-001 | BRIDGE REPAIRDallas · Dallas | 2 of 5 | $1,335,960 | $1,200,300PATHFIELD INVESTMENTS LLC | +11.3% |
| Mar 24, 2022 | 6394-36-001 | BRIDGE PREVENTATIVE MAINTENANCECollin · Dallas | 2 of 3 | $226,065 | $164,135SHALOM SERVICES CORPORATION | +37.7% |
| Mar 17, 2022 | 6397-23-001 | BRIDGE BEAM REPAIRLamar · Paris | 3 of 8 | $144,555 | $127,669PENHALL COMPANY | +13.2% |
| Mar 17, 2022 | 6395-95-001 | BRIDGE BEAM REPAIRHopkins · Paris | 4 of 7 | $267,450 | $228,100GIBSON & ASSOCIATES, INC. | +17.3% |
| Mar 8, 2022 | 6383-66-001 | CULVERT EXTENSION & CROSS DRAINAGEKaufman · Dallas | 5 of 5 | $473,035 | $228,954SHALOM SERVICES CORPORATION | +106.6% |
| Mar 8, 2022 | 6378-73-001 | MISCELLANEOUS CONCRETE REPAIRDenton · Dallas | 2 of 2 | $283,700 | $246,475GIBSON & ASSOCIATES, INC. | +15.1% |
| Mar 3, 2022 | 6393-23-001 | BRIDGE REPAIRDallas · Dallas | 2 of 5 | $511,710 | $389,185PATHFIELD INVESTMENTS LLC | +31.5% |
| Feb 8, 2022 | 6392-05-001 | REPAIR/REPLACE CONCRETE BARRIERNavarro · Dallas | 2 of 6 | $313,000 | $295,394GIBSON & ASSOCIATES, INC. | +6.0% |
| Feb 4, 2022 | 2374-03-096 | BRIDGE MAINTENANCEDallas · Dallas | 4 of 5 | $10,547,598 | $7,163,237GIBSON & ASSOCIATES, INC. | +47.2% |
| Jan 6, 2022 | 0903-15-105 | BRIDGE REPLACEMENTCooke · Wichita Falls | 4 of 5 | $1,784,006 | $1,461,248CDM HOLDINGS, LLC | +22.1% |
| Jan 6, 2022 | 6389-53-001 | BRIDGE REPAIRDallas · Dallas | 3 of 6 | $665,100 | $567,860HIGHWAY 19 CONSTRUCTION LLC | +17.1% |
| Dec 16, 2021 | 6385-52-001 | BRIDGE PREVENTATIVE MAINTENANCEGrayson · Paris | 2 of 3 | $224,050 | $135,514IDEA CONTRACTING LLC | +65.3% |
| Dec 16, 2021 | 6385-53-001 | BRIDGE PREVENTATIVE MAINTENANCEFannin · Paris | 3 of 6 | $363,420 | $222,335IDEA CONTRACTING LLC | +63.5% |
| Dec 2, 2021 | 0923-09-066 | BRIDGE REPLACEMENTEastland · Brownwood | 4 of 5 | $1,976,759 | $1,317,857HODGES AND SON CONSTRUCTION… | +50.0% |
| Oct 26, 2021 | 6384-03-001 | BRIDGE PREVENTATIVE MAINTENANCEKaufman · Dallas | 4 of 7 | $108,590 | $69,312SHALOM SERVICES CORPORATION | +56.7% |
| Oct 26, 2021 | 6387-70-001 | REPAIR/REPLACE CONCRETE BARRIERCollin · Dallas | 1 of 3 | $158,250 | $158,250 | Won |
| Oct 26, 2021 | 6386-39-001 | BRIDGE PREVENTATIVE MAINTENANCENavarro · Dallas | 8 of 8 | $217,660 | $146,611SHALOM SERVICES CORPORATION | +48.5% |
| Sep 2, 2021 | 0918-47-148 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 7 of 7 | $2,157,806 | $1,766,279SEMA CONSTRUCTION, INC. | +22.2% |
| Aug 5, 2021 | 6383-12-001 | REPAIR/REPLACE CONCRETE BARRIERDallas · Dallas | 2 of 6 | $771,000 | $696,400GIBSON & ASSOCIATES, INC. | +10.7% |
| Jul 29, 2021 | 6386-48-001 | BRIDGE PREVENTATIVE MAINTENANCEDenton · Dallas | 4 of 4 | $164,999 | $122,653SCOTT TUCKER CONSTRUCTION C… | +34.5% |
| Jun 3, 2021 | 0172-06-101 | BRIDGE MAINTENANCETarrant · Fort Worth | 2 of 6 | $3,646,272 | $2,870,123FLUOR HEAVY CIVIL, LLC | +27.0% |
| Jun 3, 2021 | 0197-03-076 | REMOVE/REPLACE BRIDGE RAILKaufman · Dallas | 5 of 13 | $1,956,066 | $1,587,186SOUTHEAST HIGHWAY GUARDRAIL… | +23.2% |
| May 6, 2021 | 2374-03-074 | IMPROVE APPROACH, WIDEN BRIDGE TO ADD TURN LANEDallas · Dallas | 1 of 5 | $3,246,151 | $3,246,151 | Won |
| May 5, 2021 | 6377-23-001 | REPAIR/REPLACE CONCRETE BARRIERDallas · Dallas | 6 of 7 | $1,399,825 | $1,118,400ROY JORGENSEN ASSOCIATES, I… | +25.2% |
| Apr 7, 2021 | 0909-22-180 | REPLACE BRIDGE AND APPROACHESMcLennan · Waco | 8 of 8 | $730,617 | $458,027HODGES AND SON CONSTRUCTION… | +59.5% |
| Apr 7, 2021 | 0459-01-080 | BRIDGE MAINTENANCEFreestone · Bryan | 3 of 11 | $1,071,258 | $926,052GIBSON & ASSOCIATES, INC. | +15.7% |
| Mar 16, 2021 | 6365-14-001 | BRIDGE REPAIRHenderson · Tyler | 8 of 8 | $542,394 | $205,234RED BARON BUILDING COMPANY,… | +164.3% |
| Mar 5, 2021 | 0902-38-120 | BRIDGE REPLACEMENTParker · Fort Worth | 9 of 12 | $1,272,143 | $1,069,862SEMA CONSTRUCTION, INC. | +18.9% |
| Feb 5, 2021 | 6373-64-001 | CROSS DRAIN STRUCTURES REPAIR OR REPLACEMENTCollin · Dallas | 9 of 13 | $308,308 | $197,225TALBRAN ENTERPRISES LLC | +56.3% |
| Feb 4, 2021 | 0802-02-069 | INTERSECTION IMPROVEMENTSWichita · Wichita Falls | 4 of 6 | $3,064,272 | $2,851,006COPPELL CONSTRUCTION CO., I… | +7.5% |
| Feb 4, 2021 | 0901-19-191 | BRIDGE REPLACEMENTGrayson · Paris | 11 of 12 | $515,216 | $334,515STATELINE CONSTRUCTION, LLC | +54.0% |
| Jan 7, 2021 | 6346-89-001 | CLEAN/SEAL JOINTS/EROSION CNTRL/CONC REPNewton · Beaumont | 6 of 6 | $699,590 | $303,665SJ&J CONSTRUCTION, LLC | +130.4% |
| Dec 3, 2020 | 6351-10-001 | BPM - BRIDGE REPAIRSCollin · Dallas | 7 of 14 | $413,440 | $348,405DBI SERVICES, LLC | +18.7% |
| Dec 2, 2020 | 0596-02-040 | REPLACE BRIDGE AND APPROACHESEllis · Dallas | 6 of 16 | $2,825,862 | $2,491,390KNIFE RIVER CORPORATION - S… | +13.4% |
| Dec 2, 2020 | 6370-75-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 2 of 9 | $407,700 | $404,070CROSS PLUS CONSTRUCTION, LLC | +0.9% |
| Dec 2, 2020 | 6370-76-001 | MISCELLANEOUS CONCRETE REPAIRDallas · Dallas | 3 of 9 | $410,975 | $398,600DBI SERVICES, LLC | +3.1% |
| Nov 19, 2020 | 6372-62-001 | BRIDGE DECK AND RAIL REPAIRHunt · Paris | 6 of 8 | $206,575 | $155,950STRUCTURAL INTEGRITY GROUP … | +32.5% |
| Nov 19, 2020 | 6368-29-001 | REPAIR OF EXISTING BRIDGE BEAMPalo Pinto · Fort Worth | 5 of 7 | $66,000 | $41,824TEXCON GENERAL CONTRACTORS | +57.8% |
| Nov 5, 2020 | 0918-11-096 | REPLACE BRIDGE AND APPROACHESKaufman · Dallas | 11 of 14 | $1,137,551 | $839,520STATELINE CONSTRUCTION, LLC | +35.5% |
| Oct 23, 2020 | 6366-10-001 | MISCELLANEOUS CONCRETE REPAIRKaufman · Dallas | 4 of 7 | $202,940 | $190,350SJ&J CONSTRUCTION, LLC | +6.6% |
| Oct 8, 2020 | 6369-54-001 | REPAIR/REPLACE CONCRETE BARRIERKaufman · Dallas | 1 of 5 | $229,545 | $229,545 | Won |
| Oct 1, 2020 | 0902-48-732 | BRIDGE REPLACEMENTTarrant · Fort Worth | 3 of 11 | $888,752 | $879,188ED BELL CONSTRUCTION COMPANY | +1.1% |
| Oct 1, 2020 | 0902-48-893 | BRIDGE REPLACEMENTTarrant · Fort Worth | 8 of 12 | $1,277,571 | $1,053,948COPPELL CONSTRUCTION CO., I… | +21.2% |
| Sep 3, 2020 | 6354-22-001 | BRIDGE PREVENTATIVE MAINTENANCETarrant · Fort Worth | 4 of 7 | $378,760 | $275,544GIBSON & ASSOCIATES, INC. | +37.5% |
| Aug 6, 2020 | 0902-48-892 | BRIDGE REPLACEMENTTarrant · Fort Worth | 1 of 9 | $516,409 | $516,409 | Won |
| Aug 5, 2020 | 0902-48-850 | BRIDGE REPLACEMENTTarrant · Fort Worth | 4 of 8 | $615,777 | $533,000FLUOR HEAVY CIVIL, LLC | +15.5% |
| Apr 8, 2020 | 0043-09-142 | UPGRADE BRIDGE AND APPROACH RAILINGWichita · Wichita Falls | 7 of 7 | $1,392,696 | $948,264HJC FARMS, INC. | +46.9% |
| Mar 10, 2020 | 6353-92-001 | MISCELLANEOUS CONCRETE REPAIRCollin · Dallas | 1 of 3 | $166,515 | $166,515 | Won |
| Mar 10, 2020 | 6354-89-001 | CULVERT CLEANING & DITCH MAINTENANCECollin · Dallas | 2 of 4 | $331,046 | $290,942SHALOM SERVICES CORPORATION | +13.8% |
Active prime contracts 2
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6511-20-001Let Nov 2, 2026 | TarrantFort Worth · US0287 | $2,028,910 | |||
| 0442-02-161Let Mar 5, 2025 | DallasDallas · IH 35E | INTERCHANGE (NEW OR RECONSTRUCTED) | $18,112,917 | 60% |
Subcontracts on active jobs 11
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 1181-04-049Let Oct 8, 2025 | NORTHEASTERN PAVERS, LLC | JohnsonFort Worth | REHABILITATION OF EXISTING ROAD | 1.76% | $81,115 |
| 0092-02-144Let Sep 5, 2025 | TEXAS MATERIALS GROUP, INC. | DallasDallas | REHABILITATION OF EXISTING ROAD | 0.58% | $111,218 |
| 0171-05-096Let Sep 4, 2025 | FOUTSCO PAVING COMPANY, LLC | TarrantFort Worth | OVERLAY | 0% | $0 |
| 1016-02-021Let Aug 7, 2025 | A. K. GILLIS & SONS, LLC | CollinDallas | HAZARD ELIMINATION & SAFETY | 8.16% | $652,477 |
| 0008-03-122Let Jul 2, 2025 | PRATER DIRT WORK LLC | ParkerFort Worth | REHABILITATION OF EXISTING ROAD | 2.5% | $128,491 |
| 0312-04-034Let Jul 1, 2025 | FOUTSCO PAVING COMPANY, LLC | WiseFort Worth | OVERLAY | 1.85% | $280,735 |
| 0172-01-055Let Mar 4, 2025 | FOUTSCO PAVING COMPANY, LLC | TarrantFort Worth | OVERLAY | 0.96% | $120,575 |
| 0031-02-031Let Oct 2, 2024 | GIBSON & ASSOCIATES, INC. | CollingsworthChildress | MAINTENANCE | 6.39% | $476,540 |
| 0353-05-128Let Aug 2, 2024 | FOUTSCO PAVING COMPANY, LLC | DallasDallas | RESTORATION | 0.42% | $63,901 |
| 0197-02-137Let May 2, 2024 | TEXAS MATERIALS GROUP, INC. | DallasDallas | REHABILITATION OF EXISTING ROAD | 1.85% | $546,302 |
| 0017-10-289Let Oct 7, 2022 | GIBSON & ASSOCIATES, INC. | BexarSan Antonio | OVERLAY | 2.56% | $1,042,502 |