| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$65,000.00 |
$29,120.00 |
$213,500.00 |
$107,875.61 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,000 | LF |
$1.50 |
$1.00 |
$1.25 |
$1.30 |
$1.35 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 1,667 | SY |
$3.00 |
$1.49 |
$1.35 |
$1.50 |
$1.40 |
| 4 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,295 | TON |
$18.00 |
$23.32 |
$23.85 |
$35.00 |
$26.29 |
| 5 | 407(B) 0250 |
TACK COAT | 6,158 | GAL |
$2.75 |
$2.00 |
$3.55 |
$3.00 |
$2.71 |
| 6 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,750 | TON |
$70.00 |
$58.00 |
$58.70 |
$60.00 |
$70.50 |
| 7 | 412 5267 |
COLD MILLING PAVEMENT | 800 | SY |
$2.00 |
$3.33 |
$6.65 |
$2.50 |
$9.47 |
| 8 | 509(C) 0322 |
CLASS A CONCRETE, SMALL STRUCTURES | 89.49 | CY |
$750.00 |
$566.69 |
$900.00 |
$600.00 |
$882.81 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$296.78 |
$424.00 |
$600.00 |
$494.82 |
| 10 | 511(A) 0332 |
REINFORCING STEEL | 7,416 | LB |
$1.00 |
$1.05 |
$2.05 |
$2.25 |
$0.5600 |
| 11 | 611(G) 5706 |
INLET CDI RCP DES. 3 | 1 | EA |
$5,000.00 |
$4,000.00 |
$4,770.00 |
$7,000.00 |
$6,252.80 |
| 12 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 0.5 | VF |
$500.00 |
$2,341.96 |
$530.00 |
$300.00 |
$1,549.08 |
| 13 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 26 | LF |
$150.00 |
$89.69 |
$130.00 |
$90.00 |
$156.42 |
| 14 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 6 | LF |
$200.00 |
$132.95 |
$159.00 |
$100.00 |
$333.65 |
| 15 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 52 | LF |
$175.00 |
$70.81 |
$185.00 |
$110.00 |
$159.25 |
| 16 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$1,661.94 |
$1,275.00 |
$2,000.00 |
$2,756.14 |
| 17 | 619(B) 0291 |
REMOVAL OF HEADWALL | 15 | EA |
$1,000.00 |
$1,000.00 |
$2,300.00 |
$1,800.00 |
$1,124.96 |
| 18 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 113,630 | LF |
$1.00 |
$0.3800 |
$0.3500 |
$0.3500 |
$0.3700 |
| 19 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 240 | LF |
$12.00 |
$5.94 |
$5.30 |
$10.00 |
$5.60 |
| 20 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$60,000.00 |
$7,000.00 |
$7,353.60 |
$73,940.00 |
$58,776.92 |