| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$10,125.00 |
$17,200.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$22,850.00 |
$35,900.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,400 | LF |
$2.00 |
$3.00 |
$1.75 |
$2.50 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 50 | LF |
$9.00 |
$6.00 |
$14.50 |
$15.00 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,390 | SY |
$2.50 |
$3.00 |
$7.70 |
$3.50 |
| 6 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,080 | CY |
$55.00 |
$50.00 |
$20.00 |
$53.00 |
| 7 | 407(B) 0250 |
TACK COAT | 170 | GAL |
$5.00 |
$4.00 |
$3.68 |
$4.75 |
| 8 | 408 5774 |
PRIME COAT | 455 | GAL |
$8.00 |
$6.00 |
$4.95 |
$2.80 |
| 9 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 370 | TON |
$110.00 |
$100.00 |
$104.82 |
$109.00 |
| 10 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 240 | TON |
$120.00 |
$110.00 |
$110.00 |
$119.00 |
| 11 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 55 | TON |
$50.00 |
$40.00 |
$47.25 |
$64.00 |
| 12 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 125 | LF |
$20.00 |
$25.00 |
$19.36 |
$25.50 |
| 13 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$2,250.00 |
$1,259.50 |
$2,130.00 |
| 14 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,300.00 |
$2,500.00 |
$2,475.00 |
$2,840.00 |
| 15 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,800 | LF |
$0.2000 |
$0.4000 |
$0.5500 |
$0.7000 |
| 16 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,250.00 |
$2,130.00 |
| 17 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 32.7 | CY |
$20.00 |
$25.00 |
$35.00 |
$42.50 |
| 18 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 118 | LF |
$90.00 |
$90.00 |
$107.50 |
$99.75 |
| 19 | 509(A) 1326 |
CLASS AA CONCRETE | 149 | CY |
$625.00 |
$650.00 |
$770.00 |
$607.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 23,336 | LB |
$1.05 |
$0.9200 |
$0.9300 |
$1.00 |
| 21 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$7,500.00 |
$6,900.00 |
$15,000.00 |
| 22 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$4,500.00 |
$10,500.00 |
$10,400.00 |
| 23 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$15,000.00 |
$36,500.00 |
$33,000.00 |