| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$5,000.00 |
$21,950.00 |
$5,000.00 |
$15,192.42 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 250 | LF |
$3.00 |
$2.00 |
$2.15 |
$3.20 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 1,595 | SY |
$5.00 |
$1.80 |
$1.85 |
$2.66 |
| 4 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 500 | TON |
$150.00 |
$129.00 |
$114.00 |
$104.76 |
| 5 | 412 5267 |
COLD MILLING PAVEMENT | 2,552 | SY |
$8.00 |
$3.40 |
$5.77 |
$5.34 |
| 6 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 72 | SY |
$20.00 |
$9.30 |
$14.00 |
$51.84 |
| 7 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 947 | LF |
$5.00 |
$2.80 |
$4.50 |
$5.33 |
| 8 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 825 | LF |
$20.00 |
$20.50 |
$18.98 |
$17.57 |
| 9 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$800.00 |
$1,100.00 |
$1,007.00 |
$931.88 |
| 10 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$3,000.00 |
$2,350.00 |
$2,250.00 |
$2,076.75 |
| 11 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,500.00 |
$2,180.00 |
$1,625.00 |
$1,504.26 |
| 12 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 82 | CY |
$25.00 |
$20.50 |
$25.00 |
$23.42 |
| 13 | 501(G) 6309 |
CLSM BACKFILL | 65 | CY |
$250.00 |
$235.00 |
$185.00 |
$192.90 |
| 14 | 504(A) 1304 |
APPROACH SLAB | 228 | SY |
$300.00 |
$226.00 |
$230.00 |
$253.26 |
| 15 | 504(B) 1305 |
SAW-CUT GROOVING | 749 | SY |
$5.00 |
$5.10 |
$5.75 |
$4.79 |
| 16 | 504(C) 6250 |
SEALED EXPANSION JOINT | 69 | LF |
$300.00 |
$239.00 |
$260.00 |
$272.32 |
| 17 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 421 | LF |
$100.00 |
$105.00 |
$91.00 |
$115.22 |
| 18 | 506(A) 1322 |
STRUCTURAL STEEL | 87,613 | LB |
$2.50 |
$1.90 |
$1.96 |
$1.95 |
| 19 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 20 | EA |
$1,500.00 |
$997.00 |
$820.00 |
$616.26 |
| 20 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$1,500.00 |
$1,250.00 |
$1,600.00 |
$854.58 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 133 | CY |
$950.00 |
$577.00 |
$950.00 |
$983.03 |
| 22 | 509(B) 1328 |
CLASS A CONCRETE | 53 | CY |
$950.00 |
$915.00 |
$925.00 |
$996.48 |
| 23 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$500.00 |
$505.00 |
$600.00 |
$622.69 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 4,077 | LB |
$1.10 |
$2.10 |
$1.20 |
$0.9600 |
| 25 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 41,373 | LB |
$1.20 |
$1.20 |
$1.08 |
$1.11 |
| 26 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 426 | LF |
$40.00 |
$48.00 |
$50.40 |
$39.35 |
| 27 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 426 | LF |
$20.00 |
$27.00 |
$21.60 |
$18.89 |
| 28 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 29 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,043 | SY |
$5.00 |
$3.40 |
$4.20 |
$3.20 |
| 30 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$50.00 |
$27.00 |
$27.60 |
$25.56 |
| 31 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10 | GAL |
$150.00 |
$113.00 |
$115.00 |
$106.50 |
| 32 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 30 | SY |
$900.00 |
$601.00 |
$615.00 |
$564.18 |
| 33 | 523(A) 6550 |
SEALER CRACK PREPARATION | 69 | LF |
$5.00 |
$4.50 |
$4.60 |
$4.26 |
| 34 | 523(B) 6560 |
SEALER RESIN | 1 | GAL |
$150.00 |
$170.00 |
$172.50 |
$159.75 |
| 35 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,273 | TON |
$50.00 |
$47.00 |
$46.30 |
$52.25 |
| 36 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 214 | TON |
$40.00 |
$36.50 |
$38.21 |
$37.44 |
| 37 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$70,000.00 |
$76,550.00 |
$85,000.00 |
$136,942.00 |
| 38 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,309 | LF |
$1.00 |
$1.60 |
$1.96 |
$2.13 |
| 39 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 15,360 | SD |
$0.5000 |
$0.0500 |
$0.4100 |
$0.6900 |
| 40 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 5,760 | SD |
$1.00 |
$0.1000 |
$0.3300 |
$0.5300 |
| 41 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.50 |
$0.1000 |
$0.6300 |
$1.07 |
| 42 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$0.5000 |
$9.10 |
$6.04 |
$2.66 |
| 43 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$30.00 |
$5.70 |
$23.00 |
$37.28 |
| 44 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$8,000.00 |
$11,000.00 |
$7,500.00 |
$10,303.88 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$78,000.00 |
$103,011.18 |
$69,000.00 |
$78,766.01 |